IR 05000261/1982016
| ML20055C101 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 06/02/1982 |
| From: | Mcguire D, Perny C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20055C096 | List: |
| References | |
| 50-261-82-16, NUDOCS 8208100235 | |
| Download: ML20055C101 (1) | |
Text
{{#Wiki_filter:' . R AFF(21I APhR loirnou ATim ne: '~ UNITED STdTNS / o,j '
NUCLEAR REGULATORY COMMISSION o ' 101 MARIETTA N.., SUITE 3100 ATLANTA, GEORGIA 30303 SAFLGUARDS INF0m!ATION.( . o yrN sm?Tr'I mT(/ gp Pft215 EECGLh0LIID.' JUN 091982 Report No. 50-261/82-16 . Docket No. 50-261 License No. DPR-23 Licensee: Carolina Power and Light Company 411 Fayetteville Street Raleigh, NC 27602 Facility Name: H. B. Robinson Steam Electric Plant 2 Inspection at: Hartsville, South Carolina Inspected conducted: May 10-14, 1982 Date of Last Physical Security Inspection Visit: January 18-22, 1982 Type of Inspection: Unannounced Physical Security Inspector: lo
C. D. Perny, Physical Security Inspector D[t Signed N 2 8h Approved by-g D. R. McGuire, Chief, Physical Protection Section Ddte 6igned Technical Inspection Branch Division of Engineering and Technical Programs Inspection Summary Areas Inspected: Included review of the Physical Security Plan and Implementing Proceaures; Security Program Audit; Records and Reports; Testing and Maintenance; Physical Barriers-Protected Area; Physical Barriers-Vital Area; Security System Power Supply; Assessment Aids; Access Control-Personnel; Access Control-Packages; and Alarm Stations.
The inspection involved 36 inspector hours on site by one NRC inspector.
Three inspection hours were accomplished during offshift periods.
Results: The licensee was found to be in compliance with NRC requirements within the 11 areas examined during the inspection except for the following 3 items: 1.
Security Plan - Failure to supply the NRC with a report describing a change to the security plan.
2.
Security Program Audit - Failure to perform an audit at the required frequency.
3.
Access Control (Vital Area) - Failure to provide adequate compensatory
_ [[1- __ measures for ensuring positive access control.
S-F2 Copy
of
Copica @ Paces A This Document 10 not to be O i W I WM.. M.. u.T. 'I@ v .1, v g reproduced withcut cpecifio r.pproul c.;" IL.II }}