IR 05000261/1982026
| ML20062H600 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 08/10/1982 |
| From: | Mcguire D, Stansberry W, Tobin W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20062H591 | List: |
| References | |
| 50-261-82-26, NUDOCS 8208160110 | |
| Download: ML20062H600 (2) | |
Text
SAFEGUARDS INf,0RMATION
.
.
- gun UNITED STAT S g
o NUCLEAR REGULATORY COMMISSION
"g 8
REGION 11 n
3,
.g 101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303 4,*****,o AUG 111982
Report No. 50-261/82-26
!
Docket No. 50-261 License No. DPR-23 Licensee: Carolina Power and Light Company ATTN: Mr. J. A. Jones
-
Vice Chairman i
411 Fayetteville Street Raleigh, NC 27602
Facility Name:
H. B. Robinson Steam Electric Plant 2 Inspection at: Hartsville, South Carolina Inspection conducted: July 26-30,1982 Date of Last Physical Security Inspection Visit: May 10-14, 1982
Type of Inspection: Unannounced Physical Security Inspectors:
_ (
$ (6 2c?
W. Tobin,, ghystq)1 Security Inspector Date Signed Y.Y. D
\\D k ? ?-
/
W. W. Stalisbe ry, PhysiQ1 Security Inspector Date S14hed
~ /b!82_
Approved by:
o
D. R. McGuire Chief, Physical Protection Section D'at'e signed Technical Inspection Branch Division of Engineering and Technical Programs Inspection Summary Areas Irspected:
Included review of Security Plan & Implementing Procedures; Security Organization-Management, Personnel and Response; Security Program Audit; Reports and Records; Testing and Maintenance; Locks, Keys and Combination; Physical Barriers-Protected and Vital Areas; Security System Power Supply; Lighting; Assessment Aids; Access Control-Personnel, Package and Vehicles; Detection Aids-Protected and Vital Areas; Alarm Stations; and Communications.
The inspection involved 66 inspector hours on site by two NRC inspectors. Ten
,
inspection hours were accomplished during offshift periods.
ENCLOSURE CONTAINS SAFECARD3 INFO.t!ATION.
UFON SE?ARATION THIS
%FEGUARDS INFORMATION nazIan=nlaouza.
8208160110 820810 PDR ADOCK 05000261 O
. _ -.
-
- -
_
SAFEGUARDS INFORMATioN
.
.
.
Results:
The licensee was found to be in compliance with NRC requirements within the 20 areas examined during the inspt:ction except for the following item:
Inspector Followup Item 50- 261/82-26 01 Security Organization-Management:
The licensee's written agreement with the guard force contractor needs to specify 10 CFR 73.55(b)(1) criteria ( see paragraph 6).
ENCLOSUF2 COTIAINS S AygGUARDS INF0FRATIOL ypen SEPARATION THIS PAGE IS DECONTROM- <