IR 05000261/1982026

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 50-261/82-26 on 820726-30.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security organization-mgt,personnel & Response.Details Withheld (Ref 10CFR73.21)
ML20062H600
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 08/10/1982
From: Mcguire D, Stansberry W, Tobin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20062H591 List:
References
50-261-82-26, NUDOCS 8208160110
Download: ML20062H600 (2)


Text

SAFEGUARDS INf,0RMATION

.

.

  1. gun UNITED STAT S g

o NUCLEAR REGULATORY COMMISSION

"g 8

REGION 11 n

3,

.g 101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303 4,*****,o AUG 111982

Report No. 50-261/82-26

!

Docket No. 50-261 License No. DPR-23 Licensee: Carolina Power and Light Company ATTN: Mr. J. A. Jones

-

Vice Chairman i

411 Fayetteville Street Raleigh, NC 27602

Facility Name:

H. B. Robinson Steam Electric Plant 2 Inspection at: Hartsville, South Carolina Inspection conducted: July 26-30,1982 Date of Last Physical Security Inspection Visit: May 10-14, 1982

Type of Inspection: Unannounced Physical Security Inspectors:

_ (

$ (6 2c?

W. Tobin,, ghystq)1 Security Inspector Date Signed Y.Y. D

\\D k ? ?-

/

W. W. Stalisbe ry, PhysiQ1 Security Inspector Date S14hed

~ /b!82_

Approved by:

o

D. R. McGuire Chief, Physical Protection Section D'at'e signed Technical Inspection Branch Division of Engineering and Technical Programs Inspection Summary Areas Irspected:

Included review of Security Plan & Implementing Procedures; Security Organization-Management, Personnel and Response; Security Program Audit; Reports and Records; Testing and Maintenance; Locks, Keys and Combination; Physical Barriers-Protected and Vital Areas; Security System Power Supply; Lighting; Assessment Aids; Access Control-Personnel, Package and Vehicles; Detection Aids-Protected and Vital Areas; Alarm Stations; and Communications.

The inspection involved 66 inspector hours on site by two NRC inspectors. Ten

,

inspection hours were accomplished during offshift periods.

ENCLOSURE CONTAINS SAFECARD3 INFO.t!ATION.

UFON SE?ARATION THIS

%FEGUARDS INFORMATION nazIan=nlaouza.

8208160110 820810 PDR ADOCK 05000261 O

PDR

. _ -.

-

- -

_

SAFEGUARDS INFORMATioN

.

.

.

Results:

The licensee was found to be in compliance with NRC requirements within the 20 areas examined during the inspt:ction except for the following item:

Inspector Followup Item 50- 261/82-26 01 Security Organization-Management:

The licensee's written agreement with the guard force contractor needs to specify 10 CFR 73.55(b)(1) criteria ( see paragraph 6).

ENCLOSUF2 COTIAINS S AygGUARDS INF0FRATIOL ypen SEPARATION THIS PAGE IS DECONTROM- <