ML20235B982

From kanterella
Revision as of 18:56, 20 March 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-358/74-02 on 740515-17.Violations Noted.Aec Has No Further Questions Re Actions Taken Concerning Matter Identified in Util
ML20235B982
Person / Time
Site: 05000000, Zimmer
Issue date: 06/18/1974
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dickhoner W
CINCINNATI GAS & ELECTRIC CO.
Shared Package
ML20235B311 List: ... further results
References
FOIA-87-111 NUDOCS 8709240308
Download: ML20235B982 (2)


See also: IR 05000358/1974002

Text

& -
  • .  !

i _

'

'

.-

LK dais] Jil  ;

,

[gCY c UNITED STATES

'

l e , ,

ATOMIC ENERGY COMMISSION - '

T DIRECTOR ATE OF REGULATORY OPERATIONS

  1. '4rts o'

/ REGION lil

799 ROOSEVELT ROAD ygggpgogg

GLEN ELLYN, ILLINOfS 6o137 012) e 584860

JUN 1 8 1974

Cincinnati Gas and Electria Company Docket No. 50-358

ATTN: Mr. V. B. Dickhonor

Executive Vise President l

139 East 4th Street

Cincinnati, Ohio 43201

centle:ssa s t

This refers to the inspection conducted by Mr. J. Button of this office l

on May 15-17, 1974, of activities at the W.11. Zimmer site authorized by j

ABC Construction Permit No. CPPR-88, and to the discussion of our findings

with you and others of your staff at the conclusion of the inspection.

i

A copy of our report of this inspection is enclosed and identifies the j

areas ava=4ned during the inspection. Within these areas, the inspection J

consisted of a selective' examination of procedures and representative f

records, interviews with plant personnel, and observations by the inspector. j

4

The inspector also er.: mined actions you have taken with respect to the i

ratter identified in your letter of April 8, 1974, which we previously

h mt:tSt to -our ettention. 17e he.ve no further questions regarding this

natter.

During this inspection, it was found that certain of your activities appear

to be in violation of AEC requirements. The item and reference to the

pertinent requirements are listed under Enforcement Action in the Summary

of Findings Section of the enclosed inspection report.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the AEC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within thirty days of

your receipt of this notice, a written statement or explanation in reply,

including (1) corrective steps which have been taken by you, and the

results achieved; (2) corrective steps which will be taken to avoid further

violations; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

l Title 10, Code of Federal Regulations, a copy of this notice, the enclosed

inspection report, and your response to this notice will be placed in the

AEC's Public Document Room. If this report contains any information that

l

8709240300 B70921

PDR FOIA

MENZB7-111 PDR

. - - _ _ _ - - _ _ - _

..-

,

'

-

'

JUN ' 1 8 1974 )

Cibeinnati' Gas and -2- 'I

Electric Company

l

you or your. contractors believe to be proprietary, it is necessary that you

maka a written application to this office, within twenty days of your. receipt' '

of this notice, to withhold such information from public disclosure. Any

such application must include a full statement of the reasons for which it

is claimed that the information is proprietary, and should be prepared so /

the proprietary.information identified in the application is' contained in .

a separate.part of the document. Unless we receive an application to withhold

information or are otherwise contacted within the specified. time period, the

written material identified in this paragraph will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

j

,

gineerely yours,

James G. Keppler.

Regional Director

Enclosure

RO Inspection Rpt No.

050-358/74-02

bec: R0 Chief, FSLE3

RO:HQ (4)

Licensing (4)

DR Central Files

RO Files

PDR

Local PDR

NSIC

DTIE

i

I

I

__ __ __________ _ _ _ _ - _ - _ _ _