Submits Update on Status of RHR Sys Iconic Display at Facilities,Per Generic Ltr 88-17 Re Loss of Dhr.Computer Graphics Display Data in Real Time & Reflect Status of Refueling Water Level & RHR Pump Parameters
ML19354E445
Person / Time
Site: Byron, Braidwood, 05000000
Issue date: 01/22/1990
From: Schuster T
COMMONWEALTH EDISON CO.
To: Murley T
Office of Nuclear Reactor Regulation
References
GL-88-17, NUDOCS 9001310208
Download: ML19354E445 (1)


Text

Commonwealth Edison One First N tional Plaza Chicago,8!Iir.oi3

^

Address Reply to: Post Office Box 767'~

Chicago, Illinois 60690 0767

,. January 22, 1990 i Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 Generic Letter 88-17 Supplemental Information Loss of Decay Heat Removal NR Docket Nos. 50-454/455 and 50-456/457 i

.i

Reference:

a) November 1, 1989 letter from R.A. Chrzanowski to T.E. Murley j

Dear Dr. Murley:

1 Commonwealth Edison provided status on the implementation of Generic <

Letter 88-17, Loss of Decay Heat Removal, for Byron, Braidwood and Zion f Stations in reference (a). This letter provides an update on the status of 'l the Residual Heat removal (RHR) system iconic display at Byron and Braidwood j Stations.

Byron Station staff have designed a computer graphic for the Main Control Room. The graphic displays data in real time and reflects the status of the refueling water level and RHB pump parameters. The display is a mimic 3 of the reactor vessel, steam generator, pressurizer and RCP, and is to scale with respect to plant elevation. The screen displays bar graphs and literal values for the four refueling level instruments and a pressurizer level  !

Instrument. Also shown are the RHR pump suction and discharge pressures, <

discharge temperature and motor bearing temperatures.

This display software has been added to the Unit.1 Process Computer at Byron Station and is scheduled to be added to the Byron Unit 2 Process Computer by Augu..t 1, 1990. Braidwood Station is scheduled to install the display software on both units by January 15, 1991. Please direct any further questions regarding this matter to this office.

Very truly yours, lAw/.A h s T.K. Schuster Nuclear Licensing Administrator

/sc1:0548T:1 cc: Resident Inspector-Byron Resident Inspector-Braidwood L.N. 01shan-NRR S.P. Sands-NRR Region III Office Office of Nuclear Facility-IDNS 9001310208 900122

[