Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 1999-09-08
[Table view] Category:NRC TO U.S. CONGRESS
MONTHYEARML20059N6551990-09-12012 September 1990 Forwards Responses to H Myers Requests of 900719,0806,13 & 16 Re Seabrook Welds ML20059F5091990-08-17017 August 1990 Forwards Responses to H Myers 900716 Requests Re Pipe Welding Problems.Confidentiality of NRC Alleger Requested Through Restricting Access & Use to Members & Staff of Committee ML20059F4101990-08-0808 August 1990 Forwards Responses to H Myers 900713 Request Re Pipe Weld Repair ML20059F1001990-08-0202 August 1990 Forwards Responses to H Myers 900607 & 0706 Requests Re Plant Welds ML20058N4881990-07-16016 July 1990 Forwards Response to H Myers 900625 & 0703 Requests Re Plant Welds ML20058N5091990-07-16016 July 1990 Forwards Responses to H Myers 900614,19 & 26 Requests Re Plant Welds ML20058N7341990-07-0505 July 1990 Forwards Responses to H Myers 900614 & 19 Requests Re Plant Welds ML20055D0361990-06-29029 June 1990 Forwards Responses to H Myers 900607 & 08 Requests Re Plant welds.Pullman-Higgins Initiated Secondary Review of Radiographs in Response to Insp Rept 50-443/82-06 ML20055D0431990-06-26026 June 1990 Forwards Response to H Myers 900601 Request for Info Re Welds.Nrc Review of Pipe Welding & NDE Issues Did Not Specifically Address Deficiency Repts 469 & 497.Rept, Documenting NRC Review,Scheduled for Issuance in Jul 1990 ML20055D0591990-06-21021 June 1990 Forwards Response to H Meyers 900522,29 & 0606 Requests Re Plant Welds.Allegations That Deficiencies Exist Re Radiographic Record of Cooling Tower Piping Welds Unsubstantiated ML20055D0701990-06-18018 June 1990 Forwards Response to Containing a Robinson & L Bruner Comments on Facility,Including Availability of INPO Safety Repts & Unsafe & Unsatisfactory Emergency Plan ML20055D0751990-06-13013 June 1990 Responds to 900601 Request for Meeting W/Nrc During Wk of 900618 Re Plant Weld Program.Suggests Meeting Following Completion of Insp Team Insp/Assessment Rept Targeted for Issuance in Early Jul ML20055C6661990-05-23023 May 1990 Forwards Documents Re Facility QA Procedures During 1982 Through 1985 Concerning plant.W/41 Proprietary Oversize Encls.Encls Withheld ML20055C5921990-05-18018 May 1990 Forwards Responses to Requesting Details on NRC Handling of INPO Repts Re Plant.Evaluations of Plant by INPO & NRC Generally Compatible & Complementary Assessments of Plant ML20248F0321989-09-14014 September 1989 Forwards Rept of AOs at Licensed Facilities for First Calendar Quarter 1989.Plug Failure Resulted in Steam Generator Tube Leak at North Anna Unit 1 & Steam Generator Ruptured at McGuire Unit 1.W/o Encl ML20247L2401989-09-13013 September 1989 Responds to Re K Barnes Concerns Regarding Safety at Plants.Advises That to Date,Releases from Plants Remain Well within Accepted Stds ML20246M4281989-08-31031 August 1989 Responds to Statements Re Settlement Agreement Between State of Ny & Lilco Concerning Decommissioning of Plant.Nrc Directly Involved in Ensuring That Transfer of Ownership & Subsequent Decommissioning Conducted Per NRC Regulations ML20246K8571989-08-25025 August 1989 Discusses NRC Actions in Reponse to Constituent Concerns Re Excessive Overtime Worked by Employees of Plants ML20246B6591989-08-18018 August 1989 Forwards 40th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants from Apr-June 1989. Lilco Shareholders Voted to Accept Terms That Provide for Sale of Plant to State of Ny ML20246M0981989-08-11011 August 1989 Forwards Transcript of 890728 Meeting Between NRC & Lilco & Es Dennis to B Hayes Re SA White,Per H Myers Request ML20246E1941989-07-0707 July 1989 Responds to ,On Behalf of Constituent,Re Concerns W/Plant Startup.No Decision Made on Full Power License as Reviews & Hearing Process Incomplete ML20247C0111989-05-12012 May 1989 Forwards NRC Quarterly Status Rept to Congress Covering First Quarter 1989.On 890303,NRC Dismissed Shoreham Intervenors from Licensing Proceeding for Misconduct During Proceeding.W/O Encl ML20247C2081989-05-12012 May 1989 Responds to 890508 Questions Re Status of TMI Action Plan Requirements at Plant.Nrc Determined That Operation of Control Room,W/O Mods to Control Room Ventilation Sys, Adequate for Operation Up to 5% Rated Power ML20246L4851989-05-0909 May 1989 Advises That NRC Confident of Decision to Authorize Issuance of Full Power License.Issues Extensively Litigated in Licensing Proceeding.No Basis Given to Withdraw License ML20246L3271989-05-0404 May 1989 Forwards Questions & Answers Re Status of TMI Action Plan Requirements at Plant,Per 890323 Request ML20247C3541989-03-17017 March 1989 Forwards Detailed Info Re Status of Implementation of TMI Action Plan Items at Listed Plants.Small Number of Action Items Still Need Resolution ML20236D4761989-03-0909 March 1989 Forwards NRC 38th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Oct-Dec 1988 ML20196C3681988-12-0505 December 1988 Ack Re Plant Licensing Proceeding.Commission Discussion of License Application Not Appropriate ML20195G8521988-11-10010 November 1988 Forwards Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Jul-Sept 1988.Inability of Commission to Forecast Licensing Schedule for Shoreham & Seabrook Noted ML20154P3891988-09-28028 September 1988 Responds to Re Concern Over Adequacy of Evacuation Plan Prepared by Util for Plant.Public Hearing Will Be Held to Adjudicate Admitted Contentions Raised by Parties to Litigation Re Plant Graded Exercise ML20154P8561988-09-19019 September 1988 Responds to to Chairman Zech Re Concern Over Adequacy of Facility Evacuation Plan.Nrc Determination of Adequacy of Facility Offsite Plans & Preparedness Will Include Review of FEMA Findings & Graded Exercise ML20245D6531988-09-14014 September 1988 Responds to Re Requested Response to Concerns of H Nickerson Long Work Hrs for Personnel at Various Central Illinois Nuclear Generating Plants.Related Info Encl ML20245D6391988-09-12012 September 1988 Forwards Response to Mavroules Questions Re Adequacy of Plant Emergency Plan ML20245D5811988-08-22022 August 1988 Forwards 36th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants Covering Apr-June 1988.Licensing Schedule Cannot Be Realistically Forecast Due to Unresolved Emergency Preparedness Issues ML20207F9571988-08-18018 August 1988 Responds to Urging NRC to Discontinue Licensing Process for Plant.Under Administrative Procedure Act, Section 558,NRC Has Obligation to Continue Licensing Proceedings & Work to Reach Reasonable Decision ML20207G2211988-08-15015 August 1988 Responds to Requesting Response to P Birnie Re Event at LaSalle Involving Recirculation Pump. NRC Response to P Birnie Identical to Ltr Addressed to Recipient ML20207G7211988-08-10010 August 1988 Responds to Re Possible Decommissioning of Plant. Detailed Cost Estimate for Decommissioning of Plant Not Performed by Nrc.Results of Study Performed by Bnwl Encl Estimating Decommissioning Costs for Ref 1,100 Mw(E) BWR ML20245D5281988-07-19019 July 1988 Forwards Commission Responses to Questions Submitted by Congressman Mavroules for Record of 880426 Hearing,Per ML20150D3141988-07-0101 July 1988 Responds to Urging NRC to Delay Seabrook Low Power Operation Until Emergency Planning & Financial Qualification Issues Resolved ML20195E4971988-06-14014 June 1988 Responds to Re Use of Carbon Steel Piping at Plant.Nrc Examining Addl Documentation at Suppliers & Issued NRC Bulletin 88-005 Alerting of Problems W/Matls. Investigation of Falsified Test Reports Being Conducted ML20195G6681988-06-10010 June 1988 Provides Info in Response to Rl Spaulding Re Problems Associated W/Full Power Operation Authorization & Plant Shutdown.Plants Must Demonstrate Satisfactory Solutions to Issues Before Restart or Full Power Operation ML20154M9011988-05-24024 May 1988 Responds to Recipient Re Proposed Rule 10CFR50 Changes Re Emergency Planning Requirements for Fuel Loading & Initial Low Power Operations.Comment Period Extended 15 Days.Served on 880525 ML20154N3871988-05-24024 May 1988 Responds to Recipient Re Proposed Change to Proposed Rule 10CFR50 Re Emergency Planning Requirements for Fuel Loading & Initial Low Power Operations.Served on 880525 ML20154J9341988-05-19019 May 1988 Responds to Forwarding W Steele Expressing Frustration at Inability to Obtain Info Re Specific Date for Public Hearing to Render Decision on Licensing of Plant.Hearings Re State of Nh Issues Underway ML20151W5611988-04-25025 April 1988 Responds to Requesting Investigation of Drug & alcohol-related Matters at Plant.Nrc Expects Licensees to Have Vigorous fitness-for-duty Program & to Strive for Drug Free Work Site ML20148S3341988-04-11011 April 1988 Responds to 880216 Referral Re Inquiry from B Lohmiller Concerning Problems Associated W/Licensing of Plant. Lohmiller Statement That on 880203 NRC Denied Util License to Operate Incorrect.Nrc Licensing Review Continuing ML20151D3921988-04-0606 April 1988 Provides Listed Info Requested in Re Operating Nuclear Power Units Located at Twelve Sites Along Great Lakes ML20196G6371988-03-0202 March 1988 Responds to & Investigative Rept on Drug & Alcohol Abuse at Plant.Commission Believes That Existing fitness-for-duty Programs Are as Effective as Those Which Would Have Been Established by Earlier Proposal.Rept Encl ML20196G9691988-02-29029 February 1988 Forwards 34th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Oct-Dec 1987. Commission Unable to Forecast Licensing Schedule for Shoreham & Seabrook Because of Unresolved Issues ML20148E0961988-02-29029 February 1988 Forwards Quarterly Rept Covering Fourth Quarter of 1987,in Response to House Rept 97-850 1990-09-12
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210J8421999-08-0303 August 1999 Forwards Order,Conforming Amend & SER in Response to Application Transmitted by Util Under Cover Ltr , & Suppl by Ltrs & 0407 Requesting Approval of Transfer of License NPF-86 ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues ML20210K4911999-07-28028 July 1999 Responds to to Chairman Jackson Requesting Info on Concerns Raised by Constitutent a Menninger,Re Seabrook Nuclear Power Station Y2K Readiness IR 05000443/19990041999-07-26026 July 1999 Forwards Insp Rept 50-443/99-04 on 990510-0620.No Violations Noted.Emergency Preparedness Program Reviewed & Found to Be Acceptable ML20209G4711999-07-14014 July 1999 Informs That Unredacted Version of Supplemental Commercial & Financial Data for Baycorp Holdings,Ltd,Submitted in 990407 Application & Affidavit,Marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20196J7011999-06-30030 June 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20209A6701999-06-25025 June 1999 Informs That NRC Ofc of NRR Reorganized Effective 990528.As Part of Organization,Div of Licensing Project Mgt Was Created.Organization Chart Encl IR 05000443/19990021999-06-21021 June 1999 Forwards Insp Rept 50-443/99-02 on 990321-0509.Violation Re Failure to Ensure That Critical Relay Calibr Characteristics Were Met Prior to Installation Was Identified ML20196G8421999-06-21021 June 1999 Forwards Copy of Notice of Consideration of Approval of Application Re Proposed Corporate Merger & Opportunity for Hearing Re 990315 Application Filed by Nepco ML20196J4451999-06-18018 June 1999 Ack Receipt of ,Following Up on .In Ltr of April 5,EJ Markey Highlighted Issue of EDG Reliability in Light of Recent Discovery of Defective AR Relays at Seabrook NPP in New Hampshire ML20212J2651999-06-17017 June 1999 Informs That Unredacted Version of Updated Financial Data for Baycorp Holdings,Ltd Will Be Withheld from Public Disclosure & Marked as Confidential Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20212H6661999-06-15015 June 1999 Forwards RAI Re 990315 Application Request for Approval of Proposed Indirect Transfer of Seabrook Station,Unit 1 License & Proposed Indirect Transfer of Millstone,Unit 3 License to Extent Held by Nepco ML20207B2221999-05-20020 May 1999 Forwards Insp Rept 50-443/99-03 on 990308-0408.Violations Identified & Being Treated as non-cited Violations ML20206K1811999-05-0707 May 1999 Responds to Re Event Notification from North Atlantic Energy Service Co Indicating That One of Seabrook Two EDG May Have Been Inoperable Since June 1997. NRC Insp of Problem Not Yet Completed ML20206N6811999-04-23023 April 1999 Ack Receipt of ,Re Potential Inoperability of Two Emergency Diesel Generators Since June 1997 at Seabrook Nuclear Power Station.Issue Under Ongoing Insp & Review by NRC ML20205R1171999-04-20020 April 1999 Ack Receipt of Ltr Requesting Action Under 10CFR2.206 Re Enforcement Action Against Individuals Alleged to Have Unlawfully Discriminated Against Contract Electrician. Request to Attend Enforcement Conference Denied.Frn Encl ML20206B3451999-04-20020 April 1999 Forwards Insp Rept 50-443/99-01 on 990207-0321.Violations Identified Involving Failure to Properly Test Primary Auxiliary Building for Test Failures & Inadequate C/A to Prevent Recurrence of Repeated Pab for Test Failures ML20205P1871999-04-0909 April 1999 Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Advises of Planned Insp Effort Resulting from Plant PPR Review ML20205N4991999-04-0808 April 1999 Responds to Requesting Copy of OI Rept 1-1998-005,or in Alternative Summary of Investigation Rept. Request for Copy of Investigation Rept,Denied at This Time, Because NRC Did Not Make Final Enforcement Decision ML20205C1891999-03-24024 March 1999 Refers to Naesco 981030 Request for Approval of Alternative Inservice Exam to That Specified by ASME BPV Code,Section XI,1983 edition/1983 Summer Addenda.Forwards SE Supporting Proposed Relief Request IR-8,Rev 1 ML20204E4191999-03-16016 March 1999 Informs of Results of Investigation Conducted at Seabrook Nuclear Generating Station by NRC OI & Requests Participation at Predecisional Enforcement Conference in King of Prussia,Pa Relative to Investigation 1-98-005 ML20210U2281999-03-16016 March 1999 Refers to Apparent Violation of NRC Requirements Prohibiting Deliberate Misconduct by Individuals & Discrimination by Employers Against Employees Who Engage in Protected Activities,Investigation Rept 1-98-005 ML20204F3101999-03-16016 March 1999 Discusses Investigation Conducted at Plant by OI Field Ofc, Region 1.Purpose of Investigation to Determine Whether Certain Activities Conducted Per NRC Requirements.Synopsis of IO Investigation Rept 1-98-005 Encl ML20207C2991999-02-26026 February 1999 Forwards Insp Rept 50-443/98-11 on 981228-990207.No Violations Noted.Inspectors Identified Several C/A Program Deficiencies Involving Timeliness of Reviews & Effectiveness of Previous C/As 1999-09-30
[Table view] |
Text
-- _ _- _ ,
- k '% UNITED STATES
} f , g NUCLEAR REGULATORY COMMISSION 80p g WASHINGTON, D, C,20555 August 18, 1989
%+...+
CHAIRMAN l f
The Honorable John B. Breaux, Chairman Subcommittee on Nuclear Regulation Committee on Environment and Public Works United States Senate Washington, D.C. 20510
Dear Mr. Chairman:
I am enclosing the Nuclear Regulatory Commission's-(NRC's) 40th quarterly status report on emergency preparedness for nuclear power plants, covering the period from April 1, 1989 to June 30, 1989. This report has been coordinated with the Federal Emergency Management Agency (FEMA).
On June 28, 1989, Long Island Lighting Company (LILCO) share-holders voted to accept the terms of an agreement with the State of New York that provides for the sale of the Shoreham plant to the State. The licensee has completed defueling the reactor.
The hearing on the Seabrook Plan for the Massachusetts Communities and the full-participation graded exercise con-cluded on June 30, 1989. 'On June 23, 1989, the Ato.nic Safety and Licensing Board issued a decision favorable to the licensee concerning the vehicular alert and notification system for the Massachusetts portion of the Seabrook emergency planning zone.
An Atomic Safety and Licensing Appeal Board decision is pending on the New Hampshire Radiological Emergency Response Plan.
Sincerely,
, 1A.L Kenneth M. Carr l
Enclosure:
l NRC Quarterly Status Report cc: The Honorable Alan K. Simpson m _ _ _ _ . . - - _ _ _ _- - - - - - - - - - - - - - - - - - - "- --
" ~-
!!RC QUARTERLY STATUS REPORT Shortham On February 28, 1989, Long Island Lighting Company (LILCO) and the State of New York signed an agreement providing for LILCO to sell the Shoreham plant to the State, which would close and decommission the plant. By April 15, 1989, all necessary State approvals had been obtained, and the LILCO Board of Directors had approved the plan.
On March 3, 1989, the Commission (Commissioner Curtiss not participating) voted unanimously to dismiss Suffolk County, New York State, and the Town of Southampton from all pending Commission proceedings for failure to comply with orders of the Atomic Safety and Licensing Board and failure to meet discovery obligations.
Dismissal of the interveners meant that the decision on Shoreham's readiness for a license became the responsibility of the Director of the Office of Nuclear Reactor Regulation (NRR). In a Commission briefing on April 17, 1989, the Director of NRR summarized his findings on those emergency planning issues that had not already been decided in the Shoreham adjudication. His conclu-ston, set forth in Supplement 10 Section 13, Subsection 13.3 of the Safety Evaluation Report and in the " Director's Findings on Shoreham Emergency Planning Contentions," was that all outstanding issues had been resolved satisfactorily, and that there was " reasonable assurance that adequate protective measures can and will be taken" in the event of an accident.
On April 20, 1989, the Commission voted 4-0 (Commissioner Curtiss not partici-pating) to authorize the Director of NRR to issue a full-power operating license to the Shoreham plant. A license was issued the following day; however, the terms of LILCO's agreement with the State of New York barred it from operating the plant.
On June 28, 1989, LILC0 shareholders voted to accept the terms of the agreement with the State of New York providing for the sale of the Shoreham plant to the State. The licensee has completed defueling the reactor.
., o 2
Seabrook Low Power A 5 percent power license restricted to 0.75 effective full-power hours was issued on May 26, 1989. The plant achieved initial criticality at 5:23 p.m. on 1 June 13, 1989. Low-power testing was in progress on June 22, 1989, when the i reactor was manually scrammed during the conduct of a natural circulation startup test. The licensee has agreed not to restart the reactor pending a review of the events surrounding this shutdown and discussing any corrective actions with the NRC Staff. The NRC sent an Augmented Inspection Team to the site on June 28, 1989, to evaluate the circumstances surrounding this shutdown.
Full Power Items to be addressed before issuance of a full-power license:
On June 16, 1988, the hearing record on the New Hampshire Radiological Emergency Response Plan was closed. On December 30, 1988, the Atomic Safety and Licensing Board (ASLB) considering off-site matters issued a decision in favor of the applicant, Public Service Company of New Hampshire (PSNH). Several interveners have filed their appeal of the ASLB decision. The Atomic Safety and Licensing Appeal Board (ASLAB) heard oral 6rguments in this matter on July 27, 1989. The Appeal Board's decision is pending.
Litigation of the Seabrook Plan for the Massachusetts Connunities (SPMC) and litigation of the full-participation graded exercise must be com-pleted. Evidentiary hearings on the SPMC and the exercise commenced on March 21, 1989, and concluded on Jur.e 30, 1989. A decision is expected by November 30, 1989.
On June 23, 1989, the ASLB considering the vehicular alert and notifica-tion system (VANS) for the Massachusetts portion of the Seabrook Emergency Planning Zone (EPZ) issued a decision favorable to the licensee.
Interveners are expected to appeal the decision.
On January 30, 1989, the ASLB considering off-site matters denied a motion to litigate an aeditional on-site exercise contention related to the I
on-site portion of the full-participation exercise. On June 20, 1989, the ASLAB affirmed this decision.
A meeting of the Advisory Committee on Reactor Safeguards (ACRS) will be held on emergency planning. Following the meeting, the ACRS will forward its views in a letter to the Chairman of -the NRC.
l
-. _ _ _ - _ - - _ _