ML20248F032
ML20248F032 | |
Person / Time | |
---|---|
Site: | North Anna, McGuire, 05000000 |
Issue date: | 09/14/1989 |
From: | Carr K NRC COMMISSION (OCM) |
To: | Quayle J SENATE, PRESIDENT OF THE SENATE |
References | |
NUDOCS 8910060181 | |
Download: ML20248F032 (1) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K4391999-10-18018 October 1999
[Table view]Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H5811999-10-15015 October 1999 Forwards 1999 Update to FSAR, for McGuire Nuclear Station.With Instructions,List of Effective Pages for Tables & List of Effective Pages for Figures ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML20217G7861999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20217F8011999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of McGuire Nuclear Station.Areas That Warranted More than Core Insp Program Over Next Five Months,Not Identified.Historical Listing of Plant Issues Encl ML20217F3261999-10-13013 October 1999 Submits Quantity of Tubes Insp from Either Side of SGs A-D & Lists Tubes with Imperfections,Locations & Size.No Tubes Removed from Svc by Plugging.Total of Eleven Tubing Wear Indications Identified at Secondary Side Supports in SGs ML20217F3591999-10-13013 October 1999 Forwards Info Copy of Cycle 14 COLR for McGuire Nuclear Station,Unit 1 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20217J5091999-10-0606 October 1999 Forwards Revs to Section 16.15-4.8.1.1.2.g of McGuire Selected Licensee Commitments Manual.Section Has Been Revised to Allow Testing of Portions of DG Fuel Oil Sys Every 10 Yrs ML20217C8351999-10-0505 October 1999 Communicates Correction to Info Provided During 990917 Meeting with Duke Energy & NRC Region Ii.Occupational Radiation Safety Performance Indicator Values Should Have Been Presented as 1 Instead of 0 ML20212J2191999-10-0404 October 1999 Informs That Util 980326 Response to GL 97-06, Degradation of SG Internals Provides Reasonable Assurance That Condition of Steam Generator Internals Are in Compliance with Current Licensing Bases for Facility ML20212J7801999-10-0404 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for McGuire NPP & 990615.Informs That NRC Reviewed Responses & Concluded That All Requested Info Re Y2K Readiness Provided.Subj GL Considers to Be Closed ML20217C4471999-10-0404 October 1999 Forwards Insp Repts 50-369/99-06 & 50-370/99-06 on 990801- 0911.Determined That One Violation Occurred & Being Treated as Non-Cited Violation ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212M1651999-09-23023 September 1999 Refers to 990917 Meeting at Region II Office Re Licensee Presentation of self-assessment of McGuire Nuclear Station Performance.List of Attendees & Licensee Presentation Handouts,Encl ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML20212D1671999-09-20020 September 1999 Forwards Exemption & SER from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Re Isolation of Main Steam Branch Lines Penetrating Containment.Exemption Related to Licensee Application ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML20212B6491999-09-15015 September 1999 Informs That Encl Announcement Re 990913 Application for Amend to Licenses NPF-9 & NPF-7 Forwarded to C Observer in North Carolina,For Publication ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20216E8791999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for July 1999 for McGuire Nuclear Station ML20212A0501999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementing Code Case for Duration of Insp Interval ML20212A2631999-09-0909 September 1999 Forwards Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valve Inservice Testing Program, IAW 10CFR50.55a. Section 8.0 Contains Summary of Changes & Detailed Description of Changes Associated with Rev 25 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211J3671999-08-31031 August 1999 Forwards Public Notice of Application for Amend to License NPF-9 Seeking one-time Extension of Surveillance Frequency for TS SR 3.1.4.2 Beyond 25% Extension Allowed by TS SR 3.0.2 ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML20211K8831999-08-26026 August 1999 Forwards Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Occurred & Being Treated as NCVs ML20211G5181999-08-24024 August 1999 Forwards SE Re second-10-yr Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210V0171999-08-13013 August 1999 Confirms Conversation Between M Cash & M Franovich on 990806 Re Mgt Meeting,Scheduled for 990917 to Present self- Assessment of Plant Performance.Meeting Will Be Held in Atlanta,Ga ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210S2231999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210T4511999-08-10010 August 1999 Forwards Response to NRC RAI Re 981014 Standby Nuclear Svc Water Pond Dam Audit Conducted by FERC ML20210R4311999-08-10010 August 1999 Forwards Summary Rept of Mods,Minor Mods,Procedure Changes & Other Misc Changes Per 10CFR0.59 1999-09-09 Category:NRC TO U.S. CONGRESS MONTHYEARML20248F0321989-09-14014 September 1989
[Table view]Forwards Rept of AOs at Licensed Facilities for First Calendar Quarter 1989.Plug Failure Resulted in Steam Generator Tube Leak at North Anna Unit 1 & Steam Generator Ruptured at McGuire Unit 1.W/o Encl ML20247L2401989-09-13013 September 1989 Responds to Re K Barnes Concerns Regarding Safety at Plants.Advises That to Date,Releases from Plants Remain Well within Accepted Stds ML20246K8571989-08-25025 August 1989 Discusses NRC Actions in Reponse to Constituent Concerns Re Excessive Overtime Worked by Employees of Plants ML20246B6591989-08-18018 August 1989 Forwards 40th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants from Apr-June 1989. Lilco Shareholders Voted to Accept Terms That Provide for Sale of Plant to State of Ny ML20247C0111989-05-12012 May 1989 Forwards NRC Quarterly Status Rept to Congress Covering First Quarter 1989.On 890303,NRC Dismissed Shoreham Intervenors from Licensing Proceeding for Misconduct During Proceeding.W/O Encl ML20247C3541989-03-17017 March 1989 Forwards Detailed Info Re Status of Implementation of TMI Action Plan Items at Listed Plants.Small Number of Action Items Still Need Resolution ML20236D4761989-03-0909 March 1989 Forwards NRC 38th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Oct-Dec 1988 ML20195G8521988-11-10010 November 1988 Forwards Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Jul-Sept 1988.Inability of Commission to Forecast Licensing Schedule for Shoreham & Seabrook Noted ML20245D6531988-09-14014 September 1988 Responds to Re Requested Response to Concerns of H Nickerson Long Work Hrs for Personnel at Various Central Illinois Nuclear Generating Plants.Related Info Encl ML20245D5811988-08-22022 August 1988 Forwards 36th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants Covering Apr-June 1988.Licensing Schedule Cannot Be Realistically Forecast Due to Unresolved Emergency Preparedness Issues ML20207G2211988-08-15015 August 1988 Responds to Requesting Response to P Birnie Re Event at LaSalle Involving Recirculation Pump. NRC Response to P Birnie Identical to Ltr Addressed to Recipient ML20195G6681988-06-10010 June 1988 Provides Info in Response to Rl Spaulding Re Problems Associated W/Full Power Operation Authorization & Plant Shutdown.Plants Must Demonstrate Satisfactory Solutions to Issues Before Restart or Full Power Operation ML20151D3921988-04-0606 April 1988 Provides Listed Info Requested in Re Operating Nuclear Power Units Located at Twelve Sites Along Great Lakes ML20148E0961988-02-29029 February 1988 Forwards Quarterly Rept Covering Fourth Quarter of 1987,in Response to House Rept 97-850 ML20196G9691988-02-29029 February 1988 Forwards 34th Quarterly Status Rept on Emergency Preparedness for Nuclear Power Plants for Oct-Dec 1987. Commission Unable to Forecast Licensing Schedule for Shoreham & Seabrook Because of Unresolved Issues ML20195J6611988-01-20020 January 1988 Responds to Concerns Raised in Re Stainless Steel Matl Designated as E-Brite 26-1.Actions Taken to Address Allegation That E-Brite 26-1 Unsuitable for Use in Nuclear Power Plants Listed ML20236K8761987-11-0303 November 1987 Responds to Sztaba Expressing Concerns Re Safe Operation of State of CT Nuclear Power Plants.Plants in State Not Rated Among Most Troublesome in Nation.Licensee Performance Monitored in Publicly Available SALP Repts ML20236G1831987-10-27027 October 1987 Responds to Re Proposed Rule 10CFR50 & Congressional Ltrs Received on Morning of 871022 Meeting. Commission Stands Behind Declaring Process for Proposed Rule Open ML20235J1171987-09-28028 September 1987 Responds to Requesting Info Re Ucs 870210 Petition Requesting Mods to B&W Facilities,Per E Gallizzi to Recipient Requesting Support of Petition. Gallizzi Statements Discussed.Petition Under Review ML20235J5351987-09-28028 September 1987 Responds to Constituent Tf Gross Ltr Supporting Ucs 870210 10CFR2.206 Petition to Suspend OLs & CPs of Any Util Operating or Bldg Nuclear Power Reactors Designed by B&W,Per 870803 Request.Nrc Statements Re Plants Discussed ML20236L1811987-08-0404 August 1987 Responds to Addressed to Chairman Zech,Requesting That Commission Keep Recipient Fully Apprised of All Developments Re Both Petition Filed by Ucs & Ongoing Reassessment of B&W Reactors.Review of Petition Continuing ML20215K5981987-06-10010 June 1987 Responds to 870508 Request for Testimony at 870514 Hearing on External Influence on NRC Adjudicatory Procedures in Shoreham Proceeding.Index of Pertinent Documents Encl ML20215H9431987-06-0505 June 1987 Advises That Review of B&W Designed Nuclear Power Plants Will Not Satisfactorily Address Safety Issues Associated W/ B&W Design.Supports Efforts to Create Independent Safety Review Board ML20214J5261987-05-15015 May 1987 Responds to Recipient Expressing Support for NRC Shut Down of Peach Bottom Atomic Power Station & Concern Re Emergency Planning Issues at Seabrook.Commission Unable to Comment on Issues Before Commission or Adjudicatory Boards ML20214P8401987-05-15015 May 1987 Responds to Rj Mrazek Re Util Request to Operate Facility at 25% Power.Commission Will Not Make Decision on Merits of Request Until All Parties Have Opportunity to Have Views Considered ML20207A2061987-04-17017 April 1987 Responds to Request for Rept Re Legal & Institutional Aspects Under NRC Jurisdiction on Possible Conversion of Unit 1 to Defense Matls Production Reactor.Cp Still in Effect.Util Plans to Mothball Reactor by June 1988 ML20210N2161986-09-25025 September 1986 Discusses Governor Celeste Opposing Full Power Operations of Plants.Order Bars Commission from Voting Until Further Order by Us Court of Appeals.Served on 860930 NUREG-0396, Forwards Chronology of Meetings & Discussions W/Util & Other Groups,Internal Meetings & Lists of Public & Internal Documents,Per 860828 Request for Info Re Reducing Emergency Planning Zones for Seabrook & Calvert Cliffs1986-09-10010 September 1986 Forwards Chronology of Meetings & Discussions W/Util & Other Groups,Internal Meetings & Lists of Public & Internal Documents,Per 860828 Request for Info Re Reducing Emergency Planning Zones for Seabrook & Calvert Cliffs NUREG-1068, Responds to Constituent Inquiry Re Nuclear Reactor Containment Sys Designed by G.E.Probability of Severe Reactor Accidents Quite Low.Third Party Liability Insurance Provided Under Price-Anderson Legislation.W/O Stated Encls1986-08-26026 August 1986 Responds to Constituent Inquiry Re Nuclear Reactor Containment Sys Designed by G.E.Probability of Severe Reactor Accidents Quite Low.Third Party Liability Insurance Provided Under Price-Anderson Legislation.W/O Stated Encls ML20209E6291986-08-26026 August 1986 Responds to 860731 Request to Be Kept Informed of Proceedings Re Facilities ML20206Q1321986-08-20020 August 1986 Submits Interim Response to Re Alleged Falsification of Welding Certificates for Welders at Plants Employed by Powerplant Specialists,Inc ML20204F9361986-07-30030 July 1986 Responds to from R Blank,Addressing Concerns Re Safety of Older Nuclear Plants,Per SO Conte 860701 Request ML20215L2051986-06-16016 June 1986 Responds to to NRC Requesting That FEMA Conduct Public Meeting Re FEMA Assessment of 861213 Emergency Planning Exercise.Commission Addressed Similar Response in 860606 Memorandum & Order NUREG-0560, Forwards NRC Response to Congressman Matsui Re Broader Issues Related to B&W Design.Efforts to Enhance Response & Review of Events Underway.Plans to Reexam B&W Design in Progress1986-04-23023 April 1986 Forwards NRC Response to Congressman Matsui Re Broader Issues Related to B&W Design.Efforts to Enhance Response & Review of Events Underway.Plans to Reexam B&W Design in Progress NUREG-1195, Forwards Response to Re NRC Reexam of B&W Reactor Design.Review Efforts Intensified After TMI Accident.Nrr Reorganized Last Yr to Increase Attention to Major Vendor Product Lines.Action Plan Under Development for Rancho Seco1986-04-23023 April 1986 Forwards Response to Re NRC Reexam of B&W Reactor Design.Review Efforts Intensified After TMI Accident.Nrr Reorganized Last Yr to Increase Attention to Major Vendor Product Lines.Action Plan Under Development for Rancho Seco ML20137P5121986-01-24024 January 1986 Provides Info Concerning Financial Qualifications of Utils Re Safety of Plants.Nrc Regulation of Commercial Nuclear Power Based on Responsibility of Licensees for Safe Operation.Addl Views of Asselstine Encl ML20132G6251985-09-19019 September 1985 Forwards Responses to Gao Rept, NRC Should Rept on Progress in Implementing Lessons Learned from TMI Accident ML20140H5551985-08-13013 August 1985 Forwards Press Release 85-108 Re Proposed Fine Concerning Util Alleged Violation of NRC Requirements Which Prohibit Discrimination Against Employee for Identifying Safety Concerns to Mgt ML20140H5741985-08-12012 August 1985 Forwards Press Release 85-106 Re Proposed Fine for Util Alleged Violation of NRC Requirements Concerning Employee Discrimination in Cleanup Program ML20140H5911985-07-23023 July 1985 Forwards Press Release 85-99 Re NRC Proposed Civil Penalty in Amount of $150,000 Against Util for Violation of Requirements Concerning Reactor Vessel Water Level Instruments ML20132B8341985-07-18018 July 1985 Forwards Quarterly Status Rept for Second Quarter CY85. Licensing Delay for Limerick 1 Projected to Be 5 Months. Delay Cannot Be Quantified for Shoreham Due to Litigation. Full Power OL Issued for Palo Verde 1 on 850601 IR 05000409/20050311985-07-16016 July 1985 Forwards Notice of Violation Issued to Util Based on 850409-0531 Insp ML20140H6231985-07-15015 July 1985 Forwards Press Release 85-95 Re NRC Proposed Fine Against Util for Alleged Violations of Safety Requirements During Apr 1985 ML20141H1081985-07-0909 July 1985 Forwards Responses to 850610 Questions Re Diablo Canyon OL Proceeding.Responses Delayed Due to Press of Other Business ML20140H6461985-06-0404 June 1985 Forwards Press Release 85-80 Re NRC Proposed Civil Penalty in Amount of $500,000 Aginst Util for Alleged Matl False Statements Made to NRC Concerning Operator Qualifications & Training ML20140H6701985-06-0303 June 1985 Forwards Press Release 85-78 Re NRC Proposed Fine Against Util for Alleged Violations of Requirements Concerning Unplanned Occupational Radiation Exposures & Failure to Control Contractor Work Forces ML20140H7211985-05-24024 May 1985 Forwards Press Release 85-75 Re NRC Proposed Fine Against Util for Alleged Violations of Requirements Concerning Failure to Take Corrective Action When Warranted Concerning QA Program ML20140H7451985-05-17017 May 1985 Forwards Press Release 85-70 Re NRC Proposed Civil Penalty in Amount of $50,000 Against TVA for Alleged Violation of Security Requirements ML20129D2591985-05-17017 May 1985 Corrects Any Mischaracterizations or Misrepresentations in Concerning Licciardo Involvement in Facility Tech Specs.Tech Specs Evaluation Proceeding at Satisfactory Pace ML20140H8121985-05-0909 May 1985 Forwards Press Release 85-66 Re NRC Proposed Imposition of Civil Penalty in Amount of $112,500 Against TVA for Alleged Noncompliance W/Requirements Concerning 840419 Event When Tube Used to Insert Instrumentation Ejected 1989-09-14 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217F8011999-10-13013 October 1999
[Table view]Informs That on 990930,NRC Completed mid-cycle PPR of McGuire Nuclear Station.Areas That Warranted More than Core Insp Program Over Next Five Months,Not Identified.Historical Listing of Plant Issues Encl ML20217C4471999-10-0404 October 1999 Forwards Insp Repts 50-369/99-06 & 50-370/99-06 on 990801- 0911.Determined That One Violation Occurred & Being Treated as Non-Cited Violation ML20212J2191999-10-0404 October 1999 Informs That Util 980326 Response to GL 97-06, Degradation of SG Internals Provides Reasonable Assurance That Condition of Steam Generator Internals Are in Compliance with Current Licensing Bases for Facility ML20212J7801999-10-0404 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for McGuire NPP & 990615.Informs That NRC Reviewed Responses & Concluded That All Requested Info Re Y2K Readiness Provided.Subj GL Considers to Be Closed ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML20212M1651999-09-23023 September 1999 Refers to 990917 Meeting at Region II Office Re Licensee Presentation of self-assessment of McGuire Nuclear Station Performance.List of Attendees & Licensee Presentation Handouts,Encl ML20212D1671999-09-20020 September 1999 Forwards Exemption & SER from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Re Isolation of Main Steam Branch Lines Penetrating Containment.Exemption Related to Licensee Application ML20212B6491999-09-15015 September 1999 Informs That Encl Announcement Re 990913 Application for Amend to Licenses NPF-9 & NPF-7 Forwarded to C Observer in North Carolina,For Publication ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212A0501999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementing Code Case for Duration of Insp Interval ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20211J3671999-08-31031 August 1999 Forwards Public Notice of Application for Amend to License NPF-9 Seeking one-time Extension of Surveillance Frequency for TS SR 3.1.4.2 Beyond 25% Extension Allowed by TS SR 3.0.2 ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211K8831999-08-26026 August 1999 Forwards Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Occurred & Being Treated as NCVs ML20211G5181999-08-24024 August 1999 Forwards SE Re second-10-yr Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML20210V0171999-08-13013 August 1999 Confirms Conversation Between M Cash & M Franovich on 990806 Re Mgt Meeting,Scheduled for 990917 to Present self- Assessment of Plant Performance.Meeting Will Be Held in Atlanta,Ga ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210Q3701999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date in Order to Register Individuals to Take Exam ML20210H7691999-07-21021 July 1999 Submits Summary of 990715 Meeting at Facility Re Presentation of Results of Most Recent Periodic Ppr.List of Meeting Attendees Encl ML20210E1931999-07-13013 July 1999 Forwards Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20209E3711999-07-0202 July 1999 Forwards Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.Violations Being Treated as Noncited Violations ML20196J4381999-06-29029 June 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1,NRC Revised Info in Rvid & Releasing Rvid Version 2 ML20196G2581999-06-23023 June 1999 Discusses Closure of GL 92-01,rev 1,suppl 1,reactor Vessel Structural Integrity ML20195F1851999-06-0202 June 1999 Forwards Insp Repts 50-369/99-03 & 50-370/99-03 on 990328- 0508.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20195E8771999-06-0202 June 1999 Confirms Telcon with M Cash on 990524 Re Public Meeting for 990715.Purpose of Meeting to Discuss Results of NRC Most Recent PPR ML20207D0521999-05-21021 May 1999 Informs That in Telcon on 990519 Between a Orton & Rf Aiello Arrangements Made for Administration of Initial Written Exam for McGuire Nuclear Station on 990603.Exam Will Be Administered at Catawba Simultaneously with Written Exam ML20207A8541999-05-20020 May 1999 Forwards RAI Re Licensee Listed Responses to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Response Requested within 90 Days of Submittal Date ML20206U7441999-05-20020 May 1999 Informs That NRC Unable to Conclude That NAPS Has Met Intent of Supplement 4 to GL 88-20.RAI Re Fire Area of IPEEE Encl. Response Requested within 90 Days of Submittal Date ML20206L5631999-05-11011 May 1999 Forwards Two Documents Requesting That NRC Place on Docket 50-369 & 50-370,technical Interface Agreement 97-02 & Related Staff Evaluation ML20206M2121999-05-11011 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Mgt Created ML20206N3451999-05-11011 May 1999 Forwards SE of Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206L4661999-05-10010 May 1999 Forwards SE Accepting Request to Delay Submitting Plant, Unit 1 Class Piping ISI Program for Third Insp Interval Until 010430,to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206P6401999-05-0505 May 1999 Refers to Public Meeting Conducted at North Anna Power Station on 990413 to Discuss Results of North Anna Plant Performance Review.List of Attendees Encl ML20206C0451999-04-23023 April 1999 Forwards Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted ML20205S0321999-04-21021 April 1999 Forwards SER Accepting Util 980804 Requests for Relief from Certain Requirements of Subsections IWE & Iwl of 1992 Addenda of ASME Section Xi.Alternatives for IWE2,IWE4,IWE6 & IWL2,authorized Pursuant to 10CFR50.55a(a)(3)(ii) ML20205Q6641999-04-15015 April 1999 Forwards Amend 10 to Indemnity Agreement B-83 for Signature & Return to Document Control Desk ML20205M6741999-04-13013 April 1999 Discusses 980318 Telcon of Licensing Bases Record Change Re Duke Energy Corp License Amend Request, & Staff Approval in Form of TS Amends 184 & 166,dtd 980930.Forwards Revised Pp to SE of 980930 ML20205Q2451999-04-12012 April 1999 Forwards Insp Repts 50-338/99-01 & 50-339/99-01 on 990131- 0313.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20205T1711999-04-0909 April 1999 Informs That on 990317 Ho Christensen & a Orton Confirmed Initial Operator Licensing Exam Schedule for Y2K.Initial Exam Dates for Wks of 000508 & 22 for Approx 13 Candidates ML20205T1411999-04-0909 April 1999 Informs That on 990407,A Royal & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Dates Scheduled for Wks of 000925 & 1002 for Approx 11 Candidates ML20196K9891999-03-29029 March 1999 Confirms Plans to Hold Meeting on 990413 at North Anna Nuclear Information Center to Discuss North Anna Plant Performance Review ML20205M2601999-03-25025 March 1999 Informs That NRC Completed PPR of Plant on 990201.Plant Issues Matrix & Insp Plan for Next 8 Months Encl ML20205A9371999-03-24024 March 1999 Forwards Evaluated & Final Rept from Ferc,Related to 981014 Dam Safety Audit Conducted at McGuire Nuclear Station for Category I Standby Service Water Pond Dam.List of Actions That Should Be Taken by Util to Ensure Safety of Dam,Encl ML20196L0021999-03-24024 March 1999 Discusses Plant Performance Review of North Anna Power Station Completed by NRC on 990205.Found Overall Performance at North Anna to Be Acceptable.Several Examples of Inadequate or Untimely Problem Resolution Were Noted ML20205B5641999-03-24024 March 1999 Forwards Audit Rept of North Anna Power Station,Units 1 & 2 Conducted on 990126-28 in Glen Allen,Va.Audit Team Assessment of Y2K Project Plan Identified Plan as well-structured,well Organized & Well Implemented ML20205H9201999-03-18018 March 1999 Forwards Exam Repts 50-369/99-301 & 50-370/99-301 on 990125- 0205.Of Eleven SRO & RO Candidates Taking Written Exam & Operating Tests,Nine Passed & Two Failed,Representing 82% Pass Rate ML20204E3221999-03-10010 March 1999 Forwards Insp Repts 50-369/99-01 & 50-370/99-01 on 990103- 0213.Non-cited Violation Noted 1999-09-08 |
Text
.. _. - - -
]
" t' ! c,4#D fl) 2 W 4,1
+ UNITED STATES
. - r.
- (, j e
NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555
/ September 14, 1989 CHAIRMAN The Honorable J. Danforth Quayle President of'the Senate Washington, D. C. 20510
Dear Mr. President:
I'am enclosing the Nuclear Regulatory Commission (NRC) report on abnormal occurrences at licensed nuclear facilities, as required by-Section 208 of the Energy Reorganization Act of 1974 (PL 93-438), for the first calendar quarter of 1989. In the context of the Act, an abnormal occurrence is an un-scheduled incident or event that the Commission determines is significant from the standpoint of public health or safety.
For this reporting period, there were two a'onormal occurrences at nuclear power plants licensed to operate, The first had
' generic implications and -involved a plug fo'1ure resulting in a steam generator ~ tube leak at North Anna Unit 1. The second involved.a steam generator tube rupture at McGuire Unit 1.
There were three abnormal occurrences under other NRC-issued licenses. Two involved medical therapy misadministration and one invo'.ved a medical diagnostic misadministration. There were no abnormal-occurrences reported by the Agreement States.
The report also contains information updating some previously reported abnormal occurrences.
In addition to this report, we will continue to disseminate information on reportable events. These event reports are routinely distributed on a timely basis to the Congress, industry, and the general public.
Sincerely, x_-1 .
Kenneth M. Carr
Enclosure:
Report to Congress on Abnormal Occurrences (NUREG-0090, Vol. 12, No. 1) j i 8910060181 s90934 PDR i 0 A COMMS NRCC CORRESPONDENCE PNU