ML20006D691
| ML20006D691 | |
| Person / Time | |
|---|---|
| Site: | Byron, Braidwood, 05000000 |
| Issue date: | 02/02/1990 |
| From: | Schuster T COMMONWEALTH EDISON CO. |
| To: | Murley T Office of Nuclear Reactor Regulation |
| References | |
| 0640T, 640T, NUDOCS 9002140256 | |
| Download: ML20006D691 (1) | |
Text
74>
p
<? @!. :
,2 fu f
1
- H [:,. /
} Commonwealth Edison
'+l'
+
One Fitt National Plaza, Chicago, linois
( _
.j.. *\\ "_. '
Kdikess Reply to: Post Office' Box 767 ~
1\\
. Chicago, Ilknois 00690 0767 -
' February 2, 1990 3
+
.Dr.vThomas E. Murley, Director
-Offlee of Nuclear Reactor Regulation
~
j.
~
.U.D. Nuclear Regulatory Commission q;
QWu hington, DC-20555
Subject:
Byron Station Units 1 and 2 Braidwood Station Units 1 and'2 DCRDR Implementation W!a_Dp.chr1 Rob 50-454/A55 and 50-456/457
Reference:
7(a) hne 30, 1989 letter from R. A. Chrzanowski to L E. Marley regarding DCRDR Implementation at. Byron /Braidwood Stations e
5
Dear Dr. Murley:
Reference (a) provided an implementation schedule and some specific design details for four HEDS. This letter provides an alternative design solu-tion to that proposed for HED #301, which will be utilized at Byron Station.
HED #301 doctunented a concern with the possible dislodging of Out of Service
~
(00S) and Caution cards hung around Westinghouse type OT2 " thumb control switches" when mu11tiple cards are on one switch.
The original design solution, as implemented at Braidwood Station during their last refueling on Unit 1, was installation of a-ring behind the switch face to which the strings of the 00S and Caution Cards may be attached.
Since the Braidwood Unit 1 installation, a simpler design using an eyelet screw inserted in the switch nameplate has been implemented on Byron Unit 1. -Although the form has. changed, the design is identical in function providing a location for attachment of 00S and Caution Cards in close proximity to the switch handle with no fear of loss or misplacement.
Both the CECO Nuclear Engineering and.
i Human Engineering departments have reviewed and approved of this alternative approach. The schedule proposed-in the referenced letter remains unchanged for both Byron and Braidwood. Although Braidwood has installed the original design on the Unit 1 Main Control Board, it will consider installation of the new design on Unit 2 and possible retrofit of Unit 1.
However, the currently installed design on Braidwood Unit 1 satisfies the concerns identified in HED
- 301.
Please direct any further questions on this subject to this office.
Very truly yours, 90021402
{f[h4 FDR ADO PDC T. K. Schuster
[
P Nuclear Licensing Administrator l