,p PHILADELPHIA ELECTRIC COMPANY NUCLEAR GROUP HEADQUARTERS 955 65 CHESTERBROOK BLVD.
WAYNE PA 19087 5691
( * "I " '""
January 26, 1990 Docket Nos.
50-352 50-353 50-277-50-278 License Nos. NPF NPF-85 DPR-44 DPR-56 U.S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
SUBJECT:
Limerick Generating Station, Units 1 and 2
. Peach Bottom Atomic Power Station, Units 2 and 3 Additional Information Concerning Proposed Combined Emergency Operations Facility Emergency Response Organization Exercises
Dear Sir:
This letter-is being submitted to provide information regarding Philadelphia Electric Company's (PECo's) Emergency Response Organization (ERO) exercises for Limerick Generating Station (LGS),
Units 1 and 2 and Peach Bottom Atomic Power. Station (PBAPS), Units' 2 and 3.
'This information was requested by NRC representatives during discussions at a December 21, 1989 meeting with PECo personnel
- concerning the proposed combined Emergency Operations Facility (EOF) located in Coatesville, Pennsylvania.
PECo currently conducts at least two (2) practice drills and one (1) full NRC-observed emergency exercise per year for each LGS and PBAPS.
These exercises require full participation of ERO personnel, and require activation of each station's EOF and Technical Support Center (TSC).
In addition, unannounced quarterly callouts_of
.ERO personnel are performed at each station, with at least one (1) callout per year per station requiring full participation of ERO personnel at their assigned facility.
Ok i
ADOCK0500gg{7 f{g 9002120279 900126 l
DR g
-g,,gf).S..Nuc1carRegulctoryCommi0sion January 26, 1990 DocumLnt Control.D:sk
.Page 2 PECo will continue to conduct ERO exercises for LGS and PBAPS, incorporating the combined EOF when it becomes operational.
The functions of ERO personnel assigned to the Headquarters Emergency Support Center (HESC) would be transferred to the new EOF.
Accordingly, these personnel would be part of the ERO mobilized to staff the new EOP.
Therefore, the ERO exercises and callouts would necessitate activation of the combined EOF approximately eight (8) times per year, with some being performed off-hours and unannounced.
If you have any questions, please do not hesitate to contact us.
Very truly yours, R f/su2 x G. A.
Hunger, Jr.
Director Licensing Section Nuclear Services Department cc:
W.
T. Russell, Administrator, Region I, USNRC T. J. Kenny, USNRC Senior Resident Inspector, LGS J. J. Lyash, USNRC Senior Resident Inspector, PBAPS
.