APR 2 01999 m

k a

t

\\

Docket No.'50-454; 50-455 1

_~ Docket No. 50-456; 50-457 Connonwealth! Edison Company

' ATTN:' Mr.'Cordell Reed Senior Vice' President 1 Post Office Box:767 Chicago,. IL: 60690 Gentlemen:

Based on discussions between myself and Mr. Ron Chezanowski of your staff on

~

, April'12, 1989, we are modifying the schedule for the E0P inspection scheduled

for Byron-~and Braidwood. We are postponing the' Byron portion of this inspection-

. based on.your upcoming OSART inspection and INP0 accreditation visit.- We will reschedule the Byron portions of this inspection at a later date.

Attached is a revised schedule dealing with the Braidwood portion.of the inspection. 'The documents requested by my April 6, 1989, letter need only be specific:to the Braidwood site, LWe thank you for your. suppert in this inspection and if you have any questions, please feel free'to contact me at [(312) 790-5695)], Mr. Monte Phillips of my staff.[(312 790-5530)], or Mr. Robert Hasse, Team Leader [(312 790-5595)].

Sincerely,-

Original Signed By:.M. J. Jordan Geoffrey C. Wright,. Chief Operations Branch, Division of Re-ctor Safety

Enclosure:

As stated-See Attached Distribution IIh R II.

RIII P

ps/mc Wri y

Mil 4

1 {

"[O C

8904270128 890420 PDR ADOCK 05000454 9 O

PNV Lt p

M.

'l' ^

APR2o3ggg

. g..

Commonwealth Edison Company 2

Distribution-cc w/ enclosure:

T. J. liaiman, Vice President, PWR Operations T. Kovach,-Nuclear.

Licensing Manager S. Hunsader, Nuclear Licensing Administrator D. E. Cooper, Regulatory Assurance Supervisor R. Pleniewicz, Station Manager R. E. Querio, Station Manager DCD/DCB (RIDS)

Licensing Fee fianagement Branch Resident Inspector, RIII Byron Resident Inspector, RIII Braidwood D. W. Cassel, Jr., Esq.

Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division Diane Chavez, DAARE/ SAFE L. Olshan,.NRR LPM Stephen P. Sands, NRR W. H. Regan, Jr., NRR/LHFB G. W. Lapinski, Jr., NRR/LHFB H. S. Taylor, Quality Assurance Division E. Chan, OGC G. Berry, OGC

r,; a *

+R

(.

BRAIDWOOD E0P INSPECTION SCHEDULE Date

-Activity 5/8/89 Entrance meeting to explain inspection process and-answer. questions; Badging, Start E0P Desktop Reviews.

5/9-11/89-E0P Desktop reviews; Review of Correspondence; Interviews.

5/12/89-Plant Walkdowns; Verification and Validation Review.

5/13/89' Complete any E0P Desktop Reviews;. Control Room Walkdowns.

E

-5/14/89 Day Off.

5/15-17/89 Plant.Walkdowns; Interviews; QA Review; Simulator. Walk-down;. Verification and. Validation Review;~' Training Review.

5/18/89 Wrapup of open issues identified.

5/19/89 Licensee Debriefing.

5/18-23/89 to Simulator exercises (two crews, four hours each).

be arranged

'5/24/89 Management Exit Meeting on Braidwood portion and Simulator.

(date negotiable).

To be Determined Byron portion'of inspection dealing with plant and control room.walkdowns; tabletop reviews; verification and validation; QA reviews; and training.

l Li.1___ _ _._z_ __ __.