Forwards Errata to Rev 3 to BAW-1543,Tables 3-20 & E-1 of Master Integrated Reactor Vessel Surveillance Program Reflecting Changes in Insertion Schedule for A5 Capsule for Davis-Besse & Crystal River
ML20006A820
Person / Time
Site: Davis Besse, Crystal River, 05000000
Issue date: 01/10/1990
From: Howell D
BABCOCK & WILCOX OPERATING PLANTS OWNERS GROUP
To: Elliot B
NRC
Shared Package
ML20006A821 List:
References
OG-626, NUDOCS 9001300278
Download: ML20006A820 (2)


Text

.

)

i e

s OWNERS CROUP e

j arms sacrononto weie,1vwt, o,, trier a,,,,,s.,,

,x,,,so ro.., wer cc-re,

,,,.., c,,t..,

c,,,,,, z.,

r.i... u..n c....,

c,,,,,,,,,

rtorce Pt.tr Corterst ce Crystet k or 3 renn.,,eo votier avtsprity ggerent, g y CPL / L;tleer Corter,t::n Twnt Bettete6 wuces Comt ny s

Working Togetner to Economically Provide Reliable and Safe Electrical Power j

j Suite 525

  • 1700 Roc 6 vile P*e
  • Rockville. MD 20852
  • 1301) 230 2100 January 10, 1990 OG-626 Mr. Barry J.

Elliot U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Review of BAW-1543, Rev. 3 - Master Integrated Reactor Vesriel Surveillance Program

Attachment:

BAW-1543 Errata Tables 3-20 and E-1 Dear Mr. Elliott Due to limited time and manufacturing difficulties, the A5 capsule which contains reconstituted Charpy specimens will not be installed in Davis-Besse in cycle 6 as planned.

Instead, it will be installed at the and of the next fuel cycle, cycle 7.

The attached errata reflect the changes in the insertion schedule for the A5 capsule.

please include these attachments in BAW-154 3, Rev. 3 which is presently ur der NRC review.

j We understand that a complete review of BAW-1543, Rev. 3 will not occur before February 1990.

Therefore, Davis-Besse and Crystal River will be requesting approval of the specific insertion and i

withdrawal-schedules contained in Tables 3-19 and 3-20 to support j

their upcoming outages.

I Should you have questions or require additional input, please call me.at 804-385-3293.

very truly yours, Cw-D. L. Howell Project Manager Owners Group Engineering Services B&W Nuclear Service Company DLH/leh 9001300278 900110 PDR ADOCK 05000302 P

PDC OM lb

Eh t

,o.

~

cc:

R. J.

Grador. ski - TE R. B.

Borsum

- BWNS J. H. Taylor

- BWNS B&WOG Reactor Vessel Workina GrouD J. N. Miller

- AP&L M.

G.

Cimock

- AP&L i

A.

G.

Panagos

- CECO

.M. A. Haghi

- DPCo D. N. Miskiewic:

- TPC S. A.

Collard

- TP&L G. L. Lehmann

- GPUN W.

S. Galloway, Jr. - RG&E i

C.

Prothero

- TE J. Harrell

- VP M. T. Moylan

- WEPCo W.

S. Hazelton

- Consultant f

I f

^',y>

~

v r

l?

i.a s

i

\\

1 t

,a l.

Io, l'

l

_