1 D

L .. .

APR 0 61989

! Docket No. 50-454; 50-455; Docket No. 50-456; and 50-457.

Commonwealth Edison Company ATTN: Mr. Cordell . Reed Senior.Vice President Post Office Box 767 Chicago, IL 60690

. Gentlemen:

)

This letter is.to inform you that an emergency operating procedures inspection will be conducted at the Braidwood and Byron Nuclear Generating s

Stations on May 8-19, 1989. A ' pre-entrance meeting during the week _of May -

1, 1989, will be coordinated through the office of the NRC Senior Resident-Inspector at the.Braidwood site.

For planning purposes, we have enclosed a' preliminary inspection schedule.

The inspection team plans on arriving onsite at approximately 0700 and will work until approximately 1700 daily, except Sunday.

During.the inspection, the inspection team will require a reasonably quiet room with tables and chairs for 10 people and a telephone. This room may be-inside.or outside the protected area. However,.the inspectors must have ready access to both units and should be in close proximity to your emergency operating procedures, WOG emergency response guidelines, procedures generation package, setpoint documents, deviation documents, and other supporting ' documentation required by NUREG 0737, Supplement 1, and NUREG 0899. The attachment outlines the time when this room will be required for each site.

The first phase of the inspect 10n at each site will be a desk-top review of the aforementioned documents and will include a review of your 50.59 analysis for safety significant deviations. During the desk-top review, we will periodically require the services of your E0P developer to supply answers and documentation to resolve questions.

The second phase of the inspection will be walkdowns of select E0Ps and off-normal procedures at both the Byron and Braidwood facilities. During the control room and remote shutdown panel portion of the walkdowns, we will need the services of licensed SR0/R0s. During the inplant portion of the walkdowns, we will need the services of auxiliary / equipment operators or R0s that had been certified as auxiliary / equipment operator. As part  ;

of the E0P walkdowns, the team will review your environmental impact study 1 (radiation and temperature) to verify that the operators can safely I operate the valves, switches, and equipment specified in the Byron and Braidwood E0Ps during a worst-case scenario.

l i

i

~

I 8904180219 890406 PDR " [--i  !

G ADOCK 05000454L PNU l  ;

\

i

_ _ _ _ _ _ _ _ _ _ _ _ _ - . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ __ _ _ _____a

L . .

APR o.6 1939 y

Commonwealth Edison Co. 2 l

The third phase of the inspection will be to exercise select E0Ps on the Byron /Braidwood simulator at the Production Training Center. During the; simulator scenarios, we will need the services of a minimum operating crew (Tech. Specs.).from each facility and the simulator operators. This phase  ;

of the' inspection will be eight hours in duration and will be split into i two 4-hour. sessions, one with the Byron crew and the remaining with the Braidwood crew. Simulator time m0y be scheduled between 0700 and 2000, at your option,-on one of the dates indicated on the attached schedule.

In addition, the team will ceviaw your training program, lesson plans, training records, training in progress; QA audits, including corrective actions, of your E0P program; and our Human Factors Specialist will

interview approximately 10 users / developers of your E0Ps. The breakdown of interviewees is as follows
3-4 SR0s, 3-4 R0s, 1-2. auxiliary / equipment operators, and 1-2 developers of your E0Ps. The interviewees will be from the Braidwood station unless you request otherwise.

The enclosure contains a listing of documents that we require so that we may prepare for the forthcoming inspection at your Byron and Braidwood Nuclear Generating Stations. It is requested that this material be

-shipped in a timely fashion so that it arrives in the Region III office by April 20, 1989.

We thank you for your support in this inspection and if you have any l questions, please feel free to contact me [(312) 790-5695], Mr. Monte Phillips of my staff [(312) 790-5530], or Mr. Robert Hasse (Team Leader) {

[(312) 790-5595]. {

Sincerely,

? .Ub . ? N G M Q DX C "0;T; g c , y; g ,

j Geoffrey C. Wright, Chief I Operations Branch, Division of Reactor Safety  ;

)

Enclosure:

As stated

)

See Attached Distribution y '< RIII k 43 lips /mc

)Op Wright 87ZI[t 6Afs i

//c /(emq W \ ev' V 3-f hb i

q j

3,?'

x: .. _.

. APR. 0 6.1989 j

~ .1 l

3 p, -

~

Commonwealth! Edison lCo.' 3 b t ..

R-

)

Distribution:

J

-:cc w/ enclosure:

T.?J. Maiman,>Vice President, D

.-l

. .PWR Operations- .j

. P. Kovack, Nuclear a

Licensing _ Manager-S'. Hunsader, . Nuclear .

~ Licensing Administrator; P. L.'Barnes, Regulatory

' Assurance Supervito'r -

R...' Pl eniewicz, . Station' Manager R. E.-Querio . Station Manager'

' DCD/DCB-(RIDS)

Licensing Fee Management. Branch .

Resident = Inspector, RIII Byron  ?

Resident Inspector, RIII-Braidwood

' D. W. Cassel , Jr. , Esq.. '

Rich 4rd Hubbard ~

J. W..McCaffrey, Chief, Public

Utilities Division' Diane Chavez DAARE/ SAFE 1 L. 01shan, NRR LPM' Sephen:P. Sands, NRR.

W. H. . Regan, J r. , NRR/LHFB -

G. W.~ Lapinski, Jr. , NRR/LHFB-H. S.. Taylor, Qusi.ity Assurance Division E.'Chan, OGC G. Berry, 0GC

___________._._.._.m___ _ . -

. ENCLOSURE 1 REQUIRED DOCUMENTS PRIOR TO INSPECTION It is requested that the following documents be forwarded to the Region III office in a timely fashion so that they arrive by April 20, 1989. It is also requested that these documents be uncontrolled but current as of the date of shipment.

1. Site specific procedures generation package (PGP), including writers guide, plant-specific technical guidelines, and deviation documents.
2. Initial and Requalification (SR0/R0) tra* ning schedule for May 8-19, 1989.

3 Listing of licensed SR0s and R0s. Include date licensed or last date license was renewed.

1 Ship to: U. S. Nuclear Regulatory Commission ATTH: Robert Hasse, DRS 799 Roosevelt Road, Bldg. 4 Glen Ellyn, IL 60137 1

1 1

? ). ,

8 .

. MATERIALS REQUIRED AT' SITE.

l It is requested that the following documents be made available at the -

specific office location'made available to the team.- It .is also requested.

that these documents be uncontrolled but current as of the date of the q inspection.

  • 1. All emergency operating procedures (EOPs).
  • 2. All off-normal procedures that require evacuation of the control room..
3. Setpoint. document.(referenceuse).
4. Procedures that control the preparation, revision, and approval of E0Ps and off-normal procedures (reference use).
5. Technical Specifications (reference use).
  • These should be copies for Inspection Team use to mark up as needed..

1 l

h- - _ _ _ . _ _ - - _ _ ____ _ _ _ _ . ._-___-_m.. __.._____.--__-__ __-- _ __._.-_.___m m__m_.m ___- _--.____. _-___, ...-_.._. -_m.__--_ _.-

j -

l

. JENCLOSURE 2 BYRON /BRAIDWOOD E0P I'NSPECTION SCHEDULE 4' -

i I"

Date ACTIVITY

' Week of~5/1/89 Pre-entrance meeting to explain inspection- l process and answer questions.

5/8/89' inspection team arrive at Byron Station. Site-

. entrance meeting. Badging. Start E0P table top review.

o 5/9/89. . Byron E0P table top reviews..

5/10-12/89 Plant and control room walkdowns, verification /

validation reviews, QA reviews, training reviews.

5/12/89 Byron site de-briefing.

5/13/89 Any Byron site followup.

5/15/89 Braidwood site entrance. Badging. E0P table top i

reviews.

i o b

4

I

~

5/16/89 Braidwood E0P table top reviews.

5/17-20/89 E0P table top reviews, plant and control room walkdowns, simulator walkdown, QA reviews, verification / validation reviews, training reviews, interviews.

5/20/89 Braidwood site de-briefing 5/18 er 5/19 or Simulator exercises (two crews, four hours each).

5/20, ce 5/22, or 5/23 - To be arranged.

5/24/89 Formal Exit meeting for complete inspection.

(datenegotiable) 1 i

1

,, APR0 6 1989 Commonwealth Edison Co. 2 The third phase of the inspection will be to exercise select E0Ps 'on the Byron /Braidwood simulator at the Production Training Center._ During the simulator scenarios, we will need the services of a minimum operating crew (Tech. Specs.) from each facility and the simulator operators. This phase of the inspection will be eight hours in duration and will be split into two 4-hour sessions, one with the Byron crew and the. remaining with the Braidwood crew. Simulator. time may be scheduled between 0700 and 2000, at your option, on one of the dates indicated on the attached schedule.

In addition, the team will review your training program, lesson ' plans,.

training records,' training in progress; QA audits, including corrective actions, of your E0P program; and our Human Factors Specialist will interview approximately 10 users / developers of your E0Ps. The breakdown of interviewees is as follows: 3-4 SR0s, 3-4 R0s, 1-2 auxiliary / equipment ,

operators, and 1-2 developers of your E0Ps. The interviewees will be from the Braidwood station unless you request otherwise.

The enclosure contains a listing of documents that we require so that we may prepare for the forthcoming inspection at your Byron and Braidwood Nuclear Generating Stations. It is requested that this material be shipped in a timely fashion so that it arrives in the Region III office by April 20, 1989.

We thank you for your support in this inspection and if you have any questions, please feel free to contact me [(312) 790-5695], Mr. Monte Phillips of my staff [(312) 790-5530], orMr.RobertHasse(TeamLeader) ,

[(312)790-5595]. )

Sincerely,

/

Geofft y(C Wright, Chief Operatioris Branch, Division of Reactor Safety

Enclosure:

As stated See Attached Distribution