Forwards Radiological Safety Insp Rept 50-293/85-27 on 850916-20 & Notice of Deviation.Review Determined That Protective Conduit for Detector Cables of high-range Containment Sys Not Installed
ML20136J201
Person / Time
Site: Pilgrim
Issue date: 11/13/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20136J205 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8511250304
Download: ML20136J201 (2)


See also: IR 05000293/1985027

Text

---

4

  • .

yy

.

NOV 131985

Docket No. 50-293

Boston Edison Company M/C Nuclear

ATTN: Mr. William D. Harrington

Senior Vice President, Nuclear

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject: Inspection No. 50-293/85-27

A special radiological safety inspection was conducted by Mr. R. L. Nimitz of

this office on September 16-20, 1985, at the Pilgrim Nuclear Power Station,

Plymouth, Massachusetts. The inspection findings were discussed with

Mr. C. J. Mathis.

The inspection covered your post accident sampling, monitoring and analysis

capabilities.

No violations were observed. However, one deviation from information provided

to us in your May 18, 1982 letter was identified. The deviation involves the

lack of protective conduit for the detector cables of the High Range Contain-

ment Monitoring System. Your letter stated that this conduit was installed.

Our review found that the conduit was not installed. Please respond to this

matter in accordance with the enclosed Appendix A.

In addition, certain activities were identified which require improvement to

be acceptable relative to NUREG-0737. You are requested to review the items

identified in the attached report and respond within 60 days of the date of

this letter on actions planned or taken in regard to these items.

The responses directed by this letter are not subject to the clearance pro-

-

cedures of the Office of Management and Budget as required by the Paperwork

Reduction Act of 1980, PL 96-511. Your cooperation with us in this matter is

appreciated.

Sincerely,

Originni Signed BY8

.

W

05112503o4 851113 j b

gDR ADOCK 05000293 c 01 Thomas T. Martin, Director

PDR -

Division of Radiation Safety

and Safeguards

' Enclosures: Appendix A, Notice of Deviation

NRC Region I Inspection Report No. 50-293/85-27

0FFICIAL RECORD COPY IR PILGRIM 85-27 - 0001.0.0

,

11/13/85 j

l I

F-

4

.!

Boston' Edison Company 2

cc w/encls:

~A. .

V. Morisi, Manager, Nuclear Management Services Department

C. J. Mathis, Station Manager

Joanne Shotwell, Assistant Attorney General

Paul Levy, Chairman, Department of Public Utilities

W. J. Nolan, Chairman, Plymouth Board of Selectmen

Plymouth Civil Defense Director

Senator Edward P. Kirby

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

CommonwealthofMassachusetts(2)

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP

W. Raymond, SRI, Vermont Yankee

T. Shedlosky, SRI,-Millstone 1&2

H. Eichenholz, SRI, Yankee

P. Leech, LPM, NRR

.

RI:DRSS RI:DRS

Y

RI:DRSS

h,

RI:DRSS

RSS

Nimitz/mmb Chueng s iak Bellamy Martin

11/b/85 11/ /85 11{ /85 11/jV85 11/h85

gu l%

OFFICIAL RECORD COPY IR PILGRIM 85-27 - 0001.1.0

11/05/85