ML20136J201
| ML20136J201 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 11/13/1985 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Harrington W BOSTON EDISON CO. |
| Shared Package | |
| ML20136J205 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8511250304 | |
| Download: ML20136J201 (2) | |
See also: IR 05000293/1985027
Text
---
4
- .
yy
.
NOV 131985
Docket No.
50-293
Boston Edison Company M/C Nuclear
ATTN: Mr. William D. Harrington
Senior Vice President, Nuclear
800 Boylston Street
Boston, Massachusetts 02199
Gentlemen:
Subject:
Inspection No.
50-293/85-27
A special radiological safety inspection was conducted by Mr. R. L. Nimitz of
this office on September 16-20, 1985, at the Pilgrim Nuclear Power Station,
Plymouth, Massachusetts. The inspection findings were discussed with
Mr. C. J. Mathis.
The inspection covered your post accident sampling, monitoring and analysis
capabilities.
No violations were observed. However, one deviation from information provided
to us in your May 18, 1982 letter was identified. The deviation involves the
lack of protective conduit for the detector cables of the High Range Contain-
ment Monitoring System. Your letter stated that this conduit was installed.
Our review found that the conduit was not installed.
Please respond to this
matter in accordance with the enclosed Appendix A.
In addition, certain activities were identified which require improvement to
be acceptable relative to NUREG-0737.
You are requested to review the items
identified in the attached report and respond within 60 days of the date of
this letter on actions planned or taken in regard to these items.
The responses directed by this letter are not subject to the clearance pro-
-
cedures of the Office of Management and Budget as required by the Paperwork
Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter is
appreciated.
Sincerely,
Originni Signed BY8
05112503o4 851113
.
W
b
j
gDR
ADOCK 05000293
01 Thomas T. Martin, Director
c
-
Division of Radiation Safety
and Safeguards
' Enclosures: Appendix A, Notice of Deviation
NRC Region I Inspection Report No. 50-293/85-27
0FFICIAL RECORD COPY
IR PILGRIM 85-27 - 0001.0.0
,
11/13/85
j
l I
F-
4
. !
Boston' Edison Company
2
cc w/encls:
~A. V. Morisi, Manager, Nuclear Management Services Department
.
C. J. Mathis, Station Manager
Joanne Shotwell, Assistant Attorney General
Paul Levy, Chairman, Department of Public Utilities
W. J. Nolan, Chairman, Plymouth Board of Selectmen
Plymouth Civil Defense Director
Senator Edward P. Kirby
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
CommonwealthofMassachusetts(2)
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
Section Chief, DRP
W. Raymond, SRI, Vermont Yankee
T. Shedlosky, SRI,-Millstone 1&2
H. Eichenholz, SRI, Yankee
P. Leech, LPM, NRR
.
Y
h,
RI:DRSS
RI:DRS
RI:DRSS
RI:DRSS
Nimitz/mmb
Chueng
s iak
Bellamy
Martin
11/b/85
11/ /85
11{ /85
11/jV85 11/h85
gu
l%
OFFICIAL RECORD COPY
IR PILGRIM 85-27 - 0001.1.0
11/05/85