Pages that link to "Vendor Equipment Technical Information Program"
Jump to navigation
Jump to search
The following pages link to Vendor Equipment Technical Information Program:
Displayed 2 items.
- VETIP (redirect page) (← links)
- IR 05000454/2011011 (← links)
- IR 05000461/2007007 (← links)
- ML112550639 (← links)
- IR 05000445/2011006 (← links)
- IR 05000237/2014007 (← links)
- IR 05000395/2008007 (← links)
- IR 05000456/2004005 (← links)
- IR 05000237/2005010 (← links)
- IR 05000373/2004005 (← links)
- IR 05000373/2002011 (← links)
- IR 05000373/2002004 (← links)
- IR 05000254/1999012 (← links)
- ML16167A527 (← links)
- ML16110A165 (← links)
- ML17219A687 (← links)
- ML17055B549 (← links)
- ML14113A114 (← links)
- ML13252A037 (← links)
- ML12338A477 (← links)
- ML12307A284 (← links)
- ML12135A038 (← links)
- ML12088A484 (← links)
- ML11308B347 (← links)
- NRC Generic Letter 1990-04 (← links)
- NRC Generic Letter 1990-03 (← links)
- ML060410002 (← links)
- ML17262A154 (← links)
- ML18135A144 (← links)
- ML17333A865 (← links)
- ML17279A393 (← links)
- ML092750350 (← links)
- ML090760973 (← links)
- ML083440224 (← links)
- RS-08-045, LaSalle, Units 1 and 2, Updated Final Safety Analysis Report (Ufsar), Revision 17, Chapter 13.0 - Conduct of Operations (← links)
- ML081330083 (← links)
- ML18018B972 (← links)
- ML17346A219 (← links)
- ML17342A754 (← links)
- ML17300A933 (← links)
- ML17298B332 (← links)
- ML073440041 (← links)
- ML072780504 (← links)
- ML072490146 (← links)
- ML071770460 (← links)
- IR 05000305/2007006 (← links)
- ML062480198 (← links)
- ML061450148 (← links)
- IR 05000373/2018003 (← links)
- ML18102B435 (← links)
- ML18095A499 (← links)
- ML18095A343 (← links)
- ML18093A484 (← links)
- ML18092B373 (← links)
- ML18057A508 (← links)
- ML18052B155 (← links)
- ML18051A904 (← links)
- ML18150A188 (← links)
- CNL-18-069, Tennessee Valley Authority - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revisions 35 and 36 (← links)
- CNL-17-154, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 34 (← links)
- CNL-16-204, Bellefonte, Units 1 and 2, Browns Ferry, Units 1, 2, and 3, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 33 (← links)
- CNL-14-162, Bellefonte, Units 1 and 2, Browns Ferry, Units 1, 2, and 3, Sequoyah, Units 1 and 2, Watts Bar, Units 1 & 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A (← links)
- CNL-13-134, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A (← links)
- ML18143B443 (← links)
- BYRON 2018-0018, 2017 Regulatory Commitment Change Summary Report (← links)
- RS-10-018, Request for License Amendment Regarding Shutdown Cooling System Isolation Instrumentation (← links)
- RA18-110, Submittal of 2017 Regulatory Commitment Change Summary Report (← links)
- RS-17-167, Regulatory Commitment Change Summary Report (← links)
- TMI-12-047, (TMI-1), Biennial 10 CFR 50.59 and Commitment Revision Reports for 2010 and 2011 (← links)
- CNL-19-043, Bellefont Nuclear Plant, Units 1 & 2; Browns Ferry Nuclear Plan, Units 1, 2 & 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, R (← links)
- ULNRC-05312, CFR Part 21 Written Notification Regarding Prime Measurement Products, Models 763 and 763A Gauge Pressure Transmitters and Model 764 Differential Pressure Transmitters (← links)
- ML19198A074 (← links)
- ML19240A383 (← links)
- ML19302D559 (← links)
- RS-19-093, Secondary Containment Drawdown Analysis (← links)
- CPSES-200101357, Administrative Manual Quality-Related, Control of High Radiation Areas, Procedure No. STA-660, Revision No. 7 (← links)
- ML19306A017 (← links)
- ML052490198 (← links)
- ML052450178 (← links)
- ML19029A133 (← links)
- ML050460220 (← links)
- ML19353C418 (← links)
- ML20012A955 (← links)
- NRC Generic Letter 90-04, Request for Information on the Status of Licensee Implementation of GSIs Resolved with Imposition of Requirements or CAs (← links)
- NRC Generic Letter 90-03, Relaxation of Staff Position in Generic Letter 83-28, Item 2.2 Part 2, "Vendor Interface for Safety-Related Components" (← links)
- ML20038A244 (← links)
- ML20028H000 (← links)
- ML20028G971 (← links)
- ML20028G924 (← links)
- ML19030A488 (← links)
- ML18003A495 (← links)
- ML20043C691 (← links)
- ML20043C185 (← links)
- ML042470056 (← links)
- ML20065T684 (← links)
- ML032460719 (← links)
- ML20065K172 (← links)
- ML20065E493 (← links)
- ML20064B414 (← links)
- ML20064B198 (← links)
- ML20064B106 (← links)
- CPSES-200300823, Response to Request for Additional Information Regarding Request for Approval of Application of WCAP-14036-P-A (← links)
- CPSES-200300095, (CPSES) - License Amendment Request (LAR) 03-01, Revision to Technical Specification (TS) Bases (← links)
- ML030550248 (← links)
- ML20059N253 (← links)
- ML20059G721 (← links)
- ML022460173 (← links)
- ML20058N782 (← links)
- ML20087L417 (← links)
- ML20086U413 (← links)
- ML20086U410 (← links)
- ML20086T337 (← links)
- ML20086L363 (← links)
- ML20086D988 (← links)
- ML20084K228 (← links)
- ML20084K217 (← links)
- ML20084E864 (← links)
- ML20084C123 (← links)
- ML20084C118 (← links)
- ML20083K679 (← links)
- ML20083K675 (← links)
- ML20083K314 (← links)
- ML20083K284 (← links)
- ML20080U402 (← links)
- ML20079P211 (← links)
- ML20079E668 (← links)
- ML20078Q772 (← links)
- ML20077J918 (← links)
- ML20102A455 (← links)
- ML20102A440 (← links)
- ML20100C322 (← links)
- ML20096D118 (← links)
- ML20096B936 (← links)
- ML20094J691 (← links)
- ML20094G784 (← links)
- ML20093C805 (← links)
- ML20092P674 (← links)
- ML20092P662 (← links)
- ML20092H678 (← links)
- ML20090H761 (← links)
- ML20107H393 (← links)
- ML20088A541 (← links)
- ML20088A200 (← links)
- CNL-20-039, Bellefonte Nuclear Plant, 1 & 2; Browns Ferry Nuclear Plant, 1 & 2; Clinch River Site; Sequoyah Nuclear Plant, 1 & 2; and Watts Bar Nuclear Station, Units 1 & 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 38 (← links)
- ML20117J732 (← links)
- ML20117G218 (← links)
- ML20114D681 (← links)
- ML20114D440 (← links)
- ML20114B116 (← links)
- ML20114B014 (← links)
- ML20113E271 (← links)
- ML20071L174 (← links)
- ML20071K931 (← links)
- ML20137U337 (← links)
- ML20137C876 (← links)
- IR 05000309/1985015 (← links)
- ML20135F315 (← links)
- IR 05000373/1985027 (← links)
- ML20154K612 (← links)
- ML20140F873 (← links)
- ML20138P395 (← links)
- ML20138K185 (← links)
- ML20138H886 (← links)
- ML20138B814 (← links)
- ML20138B549 (← links)
- ML20134N017 (← links)
- ML20134J641 (← links)
- ML20134H221 (← links)
- ML20134G962 (← links)
- ML20134G104 (← links)
- ML20134G102 (← links)
- ML20134C360 (← links)
- ML20133M942 (← links)
- ML20133L092 (← links)
- IR 05000312/1985017 (← links)
- IR 05000029/1985012 (← links)
- ML20133G547 (← links)
- ML20129E949 (← links)
- ML20129E340 (← links)
- ML20129B025 (← links)
- ML20129A378 (← links)
- ML20128R053 (← links)
- ML20128Q368 (← links)
- ML20128L008 (← links)
- IR 05000482/1996016 (← links)
- ML20128G881 (← links)
- ML20128G729 (← links)
- ML20128E953 (← links)
- ML20128E289 (← links)
- ML20128B584 (← links)
- ML20128A131 (← links)
- ML20127K094 (← links)
- ML20127K052 (← links)
- ML20127G331 (← links)
- ML20127A642 (← links)
- ML20127A421 (← links)
- ML20126H360 (← links)
- ML20126F487 (← links)
- ML20126A362 (← links)
- ML20125E599 (← links)
- ML20125D318 (← links)
- ML20134G096 (← links)
- ML20134G097 (← links)
- ML20238B971 (← links)
- IR 05000483/1998015 (← links)
- IR 05000245/1998208 (← links)
- ML20154B168 (← links)
- IR 05000245/1998207 (← links)
- ML20153E060 (← links)
- IR 05000309/1986007 (← links)
- ML20153B338 (← links)
- ML20151P127 (← links)
- ML20151L868 (← links)
- ML20151L039 (← links)
- ML20151K361 (← links)
- ML20151B439 (← links)
- IR 05000456/1988006 (← links)
- ML20149K185 (← links)
- ML20149D373 (← links)
- IR 05000382/1998013 (← links)
- IR 05000245/1997203 (← links)
- ML20202B699 (← links)
- ML20202B523 (← links)
- ML20199K736 (← links)
- ML20199J514 (← links)
- IR 05000382/1997021 (← links)
- ML20199F529 (← links)
- IR 05000213/1998005 (← links)
- ML20198K798 (← links)
- ML20198F947 (← links)
- ML20197H587 (← links)
- ML20197F054 (← links)
- IR 05000373/1987013 (← links)
- IR 05000336/1999004 (← links)
- ML20206B020 (← links)
- ML20205R197 (← links)
- IR 05000293/1988031 (← links)
- ML20204C100 (← links)
- ML20203N222 (← links)
- ML20203J393 (← links)
- IR 05000336/1997211 (← links)
- ML20203D984 (← links)
- ML20203B186 (← links)
- ML20202E269 (← links)
- IR 05000312/1988023 (← links)
- ML20207E690 (← links)
- ML20207C267 (← links)
- ML20206R069 (← links)
- IR 05000271/1987004 (← links)
- ML20206K561 (← links)
- ML20207S984 (← links)
- IR 05000220/1986013 (← links)
- ML20214R437 (← links)
- ML20214R216 (← links)
- ML20214R125 (← links)
- ML20214Q561 (← links)
- ML20214F503 (← links)
- ML20214F475 (← links)
- IR 05000333/1987011 (← links)
- ML20213H068 (← links)
- IR 05000373/1986024 (← links)
- ML20212L067 (← links)
- IR 05000254/1997010 (← links)
- ML20238A228 (← links)
- ML20237D004 (← links)
- IR 05000423/1997083 (← links)
- ML20237B478 (← links)
- ML20248M152 (← links)
- ML20247N701 (← links)
- ML20247E349 (← links)
- ML20247B247 (← links)
- IR 05000295/1989018 (← links)
- ML20246L277 (← links)
- ML20236W274 (← links)
- ML20236M849 (← links)
- ML20236M826 (← links)
- ML20236D332 (← links)
- ML20235U134 (← links)
- ML20235N741 (← links)
- ML20235M630 (← links)
- ML20235M465 (← links)
- ML20235M420 (← links)
- ML20235M394 (← links)
- ML20235L998 (← links)
- ML20235L915 (← links)
- ML20235L843 (← links)
- ML20235L839 (← links)
- ML20235H172 (← links)
- ML20235A527 (← links)
- ML20217Q242 (← links)
- ML20217Q225 (← links)
- ML20217H953 (← links)
- IA-97-178, Forwards Partially Withheld Background Briefing Package in Preparation for 970425 Meeting Between Comed & Commission (← links)
- ML20217B592 (← links)
- IR 05000373/1998004 (← links)
- ML20216C230 (← links)
- ML20216B926 (← links)
- NRC-89-0139, Responds to Concern Noted in SSOMI Insp During Wks of 890717 & 31 Re Receipt & Review of Vendor Documents.Summary of Actions to Resolve NRC SSOMI Insp Concern W/Vendor Document Review Encl (← links)
- ML20215M390 (← links)
- ML20215M212 (← links)
- ML20215M115 (← links)
- ML20215M088 (← links)
- ML20215M066 (← links)
- ML20215L966 (← links)
- ML20215L882 (← links)
- ML20215L748 (← links)
- ML20215L679 (← links)
- ML20215H677 (← links)
- ML21040A148 (← links)
- ML20215B073 (← links)
- ML20214V950 (← links)
- ML20214S346 (← links)
- ML20214S279 (← links)
- ML20214R739 (← links)
- ML20214R726 (← links)
- ML20214R708 (← links)
- ML20214R538 (← links)
- ML20211L389 (← links)
- ML20211H948 (← links)
- CNL-21-045, Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN8 (← links)
- ML21117A421 (← links)
- BECO-84-061, Forwards INPO 84-010, Vendor Equipment Technical Info Program, Nuclear Operations Procedure,Operating Experience Review Program & Vendor Manual Control,In Response to Generic Ltr 83-28,Section 2.2.2 (← links)
- A97052, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-02,50-304/97-02,50-295/97-07 & 50-304/97-07, Respectively.Corrective Actions:Placed Both Units in Cold Shutdown & Removed Operators Involved in Event (← links)
- B12270, Forwards Reviews of Listed Isap Topics Re Generic Ltr 83-28, Including Topic 1.32, Item 2.1,Equipment Classification & Vendor Interface... & Topic 1.41, Item 4.5.1,Reactor Trip Sys Functional Testing, Per Util 850517 Commitment (← links)
- ML20236Y399 (← links)
- ML20236Y139 (← links)
- ML20210D066 (← links)
- B17688, Forwards Util Addl Comments on Parsons Final Rept for Mnps, Unit 2 Independent Corrective Action Verification Program. Suppl Response Has Been Prepared Based Upon Addl Util Review & Consideration of Supporting Info,Per Vol 2 of Final Rept (← links)
- B17700, Advises NRC Staff of NNECOs Intent to Revise Previous Commitment Made Relative to Vendor Equipment Technical Info Program (VETIP) (← links)
- SVP-98-059, Responds to NRC Re Violations Noted in Insp Repts 50-254/97-26 & 50-265/97-26.Corrective Actions:Pif Q1997- 0410 Was Generated (← links)
- B17614, Informs That Util Reviewed Mnps,Unit 2 Independent Corrective Action Verification Program Rept,Issued 990112 by Parsons Group.Encl Response Addresses Findings & Recommendations Contained in Subject Rept (← links)
- B16912, Advises of Intent to Revise Two Previous Commitments Made Re Vendor Equipment Technical Info Program (Vetip). Clarification on VETIP Info Submitted in Licensee ,Provided.Commitments Made by Util,Encl (← links)
- B16629, Clarifies Commitment & Revises Schedule for Commitment Submitted to NRC in Initial Results of Millstone Unit 3 Recovery Activities Dtd 960702,per GL 90-01 (← links)
- A04910, Forwards Response to 850520 Request for Addl Info for Conformance W/Generic Ltr 83-28 Re Vendor Interface Programs,Tech Specs,Periodic Maint,Trending Programs & on-line Testing (← links)
- B11676, Forwards Reviews for Listed Integrated Safety Assessment Program Topics 1.26-1.28 & 1.30-1.35,including Equipment Classification/Vendor interface,post-maint Testing & post-maint Testing Tech Spec Changes (← links)
- ML20309A739 (← links)
- NOC-AE-0382, Commitment Change Summary Rept for Period 970107-981208, Per 10CFR50.5(b)(2).Rept Lists Each Commitment for Which Change Was Made During Reporting Period & Provides Basis for Each Change.With (← links)
- ST-HL-AE-2870, Informs of Util Readiness for Fuel Loading & Low Power Testing of Util as Early as 881216 But No Later than 881224. Completion of NRC Requirements at Time of Fuel Load Expected Except Items Detailed in Encl (← links)
- AECM-86-0059, Forwards Final Response to Generic Ltr 83-28,Items 3.1 & 3.2,in Response to 851203 Request for Addl Info (← links)
- CNL-22-027, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 40 - Annual Update and Proposed Changes to Revision 40 (← links)
- ML22110A215 (← links)
- ML22146A381 (← links)
- ST-HL-AE-2470, Responds to 870504 Request for Addl Info Re Insp Rept Item 498/8739-04 Concerning Generic Ltr 83-28,Item 2.2, Equipment Classification & Vendor Interface (Programs for All Safety-Related Components). Program Discussion Encl (← links)
- ST-HL-AE-1274, Forwards Updated Response to Generic Ltr 83-28 Re Generic Implications of Salem ATWS Events.Sections 4.1,4.2.1 & 4.2.2 Address NRC 850530 Request.Action Item 15 Closed.Automatic Shunt Trip Mod Info Will Be Submitted by 851001 (← links)
- SNRC-1184, Forwards Clarified Responses to Generic Ltr 83-28,Items 2.1.1,2.2.2,4.5.1,4.5.2 & 4.5.3,in Response to NRC .Encl Responses Address Reactor Trip sys,safety-related Equipment,Functional Testing & Testing Intervals (← links)
- BECO-85-119, Responds to NRC 850423 Request for Addl Info Re Util 831107 & 840427 Responses to Generic Ltr 83-28.Response to Item 4.5.3 Will Be Provided by 850801,following Util Evaluation of BWR Owners Group Response (← links)
- RBG-21-053, Forwards Addl Info Re Generic Ltr 83-28 Concerning Salem ATWS Events,Per 850319 Request (← links)
- BECO-92-105, Forwards Semiannual Rept for long-term Program,Including Schedules for a & B Regulatory Items & Commitment Descriptions.Progress Continued on Generic Ltr 91-14 Re Emergency Communications & Generic Ltr 91-05 (← links)
- AECM-85-0157, Forwards Final Response to Generic Ltr 83-28,Item 2.2.2. Interim Response for Item 2.1.1 Re Reactor Trip Sys Classification Provided.Interim Response Endorsing BWR Owners Group Rept NEDC-30844 Provided (← links)
- ML20106E902 (← links)
- ST-HL-AE-1198, Forwards Interim Response to 830708 Generic Ltr 83-28, Required Actions Based on Generic Implementations of Salem ATWS Events. Remainder of Responses Expected to Be Included in June 1985 Rept (← links)
- SNRC-1116, Forwards Addl Info Re Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. INPO 84-010, Vendor Equipment Technical Info Program Also Encl.Rept Contains Copyrighted Matl (← links)
- AECM-84-0508, Forwards Response to Items 2.1 & 2.2.2 of Generic Ltr 83-28 Re Equipment Classification of Reactor Trip Sys Components & Vendor Interface Program,Respectively.Programs in Place Meet Intent of Proposed Vendor Interface Program (← links)
- 0CAN049208, Requests Change to QA Program as Contained in QA Manual Operations. Change Establishes Alternative Method of Maintaining Procedures Current in Accordance w/10CFR50,App B in Lieu of ANSI N18.7,Section 5.2.15 (← links)
- RBG-18-521, Forwards Final Response to Sections 1.1,2.1,2.2 & 4.5 of Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Response to Sections 3.1 & 3.2 Will Be Provided Prior to Fuel Load (← links)
- BECO-92-022, Semi-Annual Rept for Long Term Program, for Pilgrim Nuclear Power Station (← links)
- SNRC-1013, Forwards Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Encl Addresses Each NRC Position & Describes Actions Taken by Util in Response (← links)
- JPN-91-058, Informs of Rev to Vendor Equipment Technical Info Program to Include Essential Elements Described in Generic Ltr 90-03 Re Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2, Part 2, Vendor Interface for Safety-Related Components (← links)
- BECO-90-115, Responds to Generic Ltr 90-03 Re Vendor Interface for safety-related Components,Per 840427 & s.Vendor Program Based on Vendor Equipment Technical Info Program,Per Nuclear Util Task Action Committee Rept INPO 80-010 (← links)
- ML22303A001 (← links)
- IR 05000237/2023010 (← links)
- CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 (← links)
- BECO-90-149, Provides Update to Long Term Program,Per Section V.A of Plan for Long Term Program - Pilgrim Nuclear Station (← links)
- 3F0990-10, Summarizes Util Vendor Interface Program,Per Generic Ltr 90-03 Re Vendor Interface for safety-related Components. Reevaluation of Vendor Interface Controls Demonstrated That Programs Effective (← links)
- ELV-02088, Responds to Generic Ltr 90-03 Re Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2,Part 2, Vendor Interface for Safety-Related Components (← links)
- ULNRC-02964, Submits Actions Taken to Comply W/Gl 89-10 Re safety-related motor-operated Valve Testing & Surveillance.Note That Attachment Represents Licensee MOV Program to Date (← links)
- BVY-90-094, Responds to Generic Ltr 90-03 Re Vendor Interface Program for safety-related Components.Both Elements in Generic Ltr Included in Station Procedures.Previous NRC Evaluations Found in Program Acceptable (← links)
- ML20059M512 (← links)
- ML20059M436 (← links)
- AECM-90-0156, Responds to Generic Ltr (GL) 90-03 Re Relaxation of Staff Position in GL 83-28, Vendor Interface for Safety-Related Components. Facility Program Will Adequately Provide for Receipt,Review & Dissemination of Vendor Technical Info (← links)
- ML20059J922 (← links)
- IR 05000498/1993031 (← links)
- IR 05000498/1993043 (← links)
- ST-HL-AE-3638, Forwards Evaluation of Plugged Tubes in Steam Generators Where 106 Stub Tubes Are Capped Approx 6 Inches Above Tube Sheet Which Were Not Included in Preservice Insp Program (← links)
- W3P86-0019, Responds to NRC Re Violations Noted in Insp Repts 50-382/85-04 & 50-382/85-27.Corrective Actions:Nuclear Purchasing Procedure Revised to Include Issuance of Ack Copy of Purchase Order Changes for safety-related Orders (← links)
- TXX-9433, Forwards Relief Requests A-1 & A-2,rev 1,respectively to CPSES Unit 2 ISI Program (← links)
- TXX-9306, Responds to NRC Re Violations Noted in Insp Repts 50-445/92-51 & 50-446/92-51 on 921025-1205.C/As:future Technical Bulletin Will Be Processed & Tracked Through Vendor Equipment Technical Info Program (← links)
- TXX-4486, Forwards Addl Info Re Response to Generic Ltr 83-28, Required Action Based on Generic Implications of Salem ATWS Events, Per 850412 & 0501 Requests (← links)
- TXX-9408, Requests Approval of Attached Rev to FSAR Description of Biennial Review of Safety Related Plant Procedures,Which Is Part of Previously Accepted CPSES QA Program.Proposes to Modify Commitment to Perform Biennial Reviews (← links)
- PY-CEI-NRR-1221, Responds to Generic Ltr 90-03 Re Vendor Interface for safety-related Components.Nsss & balance-of-plant Vendors Meet Ltr Requirements.Addl Contact Program Will Be Established (← links)
- IR 07100101/2012018 (← links)
- JPN-93-080, Forwards Updated Response to GL 83-28, Required Action Based on Generic Implications of Salem ATWS Events (← links)
- IR 05000498/1993040 (← links)
- ML20058C770 (← links)
- ML20056B416 (← links)
- ML20055G867 (← links)
- IR 05000029/1990009 (← links)
- ML20055G338 (← links)
- SNRC-1732, Responds to Generic Ltr 90-03 Re Relaxation of NRC Position in Generic Ltr 83-28,Item 2.2,Part 2 Re Vendor Interface for safety-related Components (← links)
- ML20055C362 (← links)
- CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 (← links)
- ML24109A184 (← links)
- IR 05000254/2024010 (← links)
- 05000457/LER-1998-001-03, :on 980126,unit 2 Reactor Tripped as Result of 2A SG Low Low Level.Caused by Misconfigured Electronic Circuit Card in Unit 2 Turbine Digital electro-hydraulic Control Sys.Operations Stabilized (← links)
- 05000498/LER-1997-012, :on 971110,reactor Trip Occurred Due to Overtemperature/Delta Temperature Actuation.Caused by Momentary Energization of Overspeed Protection Control Solenoid.Failed Solid State Relay in Circuitry Was Removed (← links)
- 05000373/LER-1997-042-01, Forwards LER 97-042-01,which Is Being Submitted to NRC Office to Update Safety Analysis.Commitments Made by Ltr, Listed (← links)
- ML20132G008 (← links)
- 05000302/LER-1996-012, :on 960411,declared Old Battery Chargers Outside Facility Design Basis & Inoperable.Caused by Failure of Mfg to Translate Util Requirements Into Mfg Test Program. Four Old Battery Chargers Replaced (← links)
- 05000499/LER-1992-002, :on 920122,over Temp Delta Temp Trip Occurred. Caused by Personnel Error.Stp Setpoint Methodology Changed to Incorporate Current Changes to Safety Analyses (← links)
- ML20092E682 (← links)
- ML20090A228 (← links)
- ML20080U371 (← links)
- HL-1255, Responds to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2,Part 2, Vendor Interface for Safety-Related Components. Util in Process of Establishing Addl Contact Program W/Ge Re Technical Info Received (← links)
- ST-HL-AE-3595, Responds to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2,Part 2, `Vendor Interface for Safety-Related Components (← links)
- W3P90-1492, Responds to Generic Ltr 90-03, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2,Part 2, Vendor Interface for Safety-Related Components. Facility Program Exceeds Requirement of Generic Ltr 90-03 (← links)
- NRC-90-0153, Responds to Generic Ltr 90-03 & Suppl 1, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2 Part 2, Vendor Interface for Safety-Related Components. Util Has Adequate Program Including Both Elements Needed in Generic Ltr 90-03 (← links)
- 05000382/LER-1993-005-01, :on 931007,discovered That Motor Pinion Gear Keys SDC Valves Not Staked Due to Inadequate Procedure.Two Motor Pinion Gear Keys Staked.Appropriate Procedures Will Be Revised (← links)
- ML20045D651 (← links)
- ML20045B346 (← links)
- ML20044E271 (← links)
- 05000454/LER-1989-005-01, :on 890501,diesel Generator 1A Failed to Load to 5,500 Kw within 60 as Required.Caused by Max Fuel Setting on Fuel Control Sys Being Set Too Low.Vendor Instructions Added to Maint Procedures (← links)
- W3P90-1144, Forwards Response to Generic Ltr 90-04 Requesting Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions (← links)
- IR 05000295/1990009 (← links)
- 05000254/LER-1989-024, :on 891214,main Turbine Unexpectedly Tripped Following Isolation of Reactor Water Level Switch (Lits). Caused by Channel B Lits Having Been Previously Replaced W/ Switch That Operated Reverse Function (← links)
- ML20042G031 (← links)
- ML20036B787 (← links)
- ML20035B031 (← links)
- ML20034C657 (← links)
- 05000254/LER-1989-024-03, :on 891214,main Turbine Unexpectedly Tripped Following Isolation of Reactor Water Level Switch.Caused by Channel B Having Been Previously Replaced W/Switch That Operated Reverse of What Is Required (← links)
- ML20033E038 (← links)
- BECO-91-025, Provides Semiannual Rept for long-term Program,Including Schedules for a & B Regulatory Items,Commitment Descriptions & Progress Since Last Update (← links)
- ML20028G925 (← links)
- ML20028G744 (← links)
- IR 05000483/1990017 (← links)
- ML20011D346 (← links)
- IR 05000271/1989021 (← links)
- IR 05000413/1989031 (← links)
- ML19339G758 (← links)
- IR 05000254/1989017 (← links)
- ST-HL-AE-3286, Responds to NRC Re Violations Noted in Insp Repts 50-498/89-34 & 50-499/89-34.Corrective Action:Investigation Performed to Reaffirm That Preventive Maint Program Ensures That Equipment Qualification Maintained (← links)
- IR 05000498/1989041 (← links)
- ML19306E642 (← links)
- ML24337A013 (← links)
- ML19189A258 (← links)
- ML18305A281 (← links)
- NL-18-0906, 6 to the Updated Final Safety Analysis Report, Fire Hazard Analysis Changes, Technical Specification Bases Changes, Technical Requirements Manual Changes, License Renewal Changes, & Revised NRC Commitments Report (← links)
- BW180013, Regulatory Commitment Change Summary Report (← links)
- PLA-2095, Forwards Revised Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events, Reflecting Updates to Items 1.2.2,2.1,2.2.2 & 4.5 (← links)
- PLA-2472, Responds to 850319 Request for Addl Info Re Responses to Generic Ltr 83-28,Items 2.1,2.2.2 & 4.5.3.Testing of Backup Scram Valves at Refueling Outage Frequency Added to Preventative Maint Program (← links)
- ML18004A322 (← links)
- ML17348A746 (← links)
- L-90-336, Forwards Response to Generic Ltr 90-03 Re Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2,Part 2, Vendor Interface for Safety-Related Components (← links)
- L-85-233, Responds to NRC Re Generic Ltr 83-28,Section 2.2.2 Concerning Implementation.Item Addressed in Util Re Implementation of Nutac Rept.Vendor Equipment Technical Info Program Adequate (← links)
- L-84-290, Advises That Administrative Procedure 0103.38 Re Control & Use of Vendor Technical Manuals Issued to Assure Proper Use in Nuclear safety-related Sys,Per Generic Ltr 83-28 (← links)
- GO2-90-161, Amends Response to Generic Ltr 83-28,Item 2.2.2 & Generic Ltr 90-03 Re Vendor Interface (← links)
- ML17252A580 (← links)
- L-84-306, Informs of Nonconformance W/Vendor Equipment Technical Info Program Recommendations (Generic Ltr 83-28,Item 2.2.2) in Areas of Internal Handling of Vendor Svcs & Vendor Info. Revised Procedures to Be Incorporated by 841215 (← links)
- IR 05000237/1988022 (← links)
- IR 05000237/1998022 (← links)
- IR 05000237/1998023 (← links)
- ML17191A677 (← links)
- ML17174A721 (← links)
- IR 05000410/1998018 (← links)
- ML17055D031 (← links)
- ML16341G089 (← links)
- ML16230A122 (← links)
- ML13333B117 (← links)
- ML13330B564 (← links)
- ML13324A673 (← links)
- ML13317B200 (← links)
- ML13317B195 (← links)
- CNL-25-059, Nuclear Quality Assurance Plan, TVA-NQA-PLN-89A, Revision 43 (← links)
- IR 05000254/2025001 (← links)
- IR 05000237/2025001 (← links)
- JAFP-19-0050, Summary of Plant and Independent Spent Fuel Storage Installation Changes, Tests, and Experiments as Required by 10 CFR 50.59 and 10 CFR 72.48, and Summary of Commitment Changes, for 2017 and 2018 (← links)
- JAFP-19-0050, Summary of Plant and Independent Spent Fuel Storage Installation Changes, Tests, and Experiments as Required by 10 CFR 50.59 and 10 CFR 72.48, and Summary of Commitment Changes, for 2017 and 2018 (← links)