Text
... - _ - - _ _ - -
e
~
Log Il TXX-92346
=.--i C CM File # 10011.1 s
j Ref. # 10CFR26.71(d) g
=
=
TUELECTRIC cly 21, 1992 William J. Cahill,Jr.
Grear, Vwe Preident A
<.1 g
fg U. S Nucleat R:gelator Commission J-At t.n :
Documei; tentr.1 Desk
.-h;y Washington. DC.20555 A
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION 'G 5FS)
I.
DOCKET NOS.30-445 AND 50-446
'f.
TRANSMifTAL OF FIRST HALF 1992 FITNESS-FOR-DUTY PROCFAH PERFORMANCE DATA Sentlemen:
The CPSES Fitness For-Duty Program Performance Data f or the period of January 1, 1992 through June 30, 1992 are enclosed.
The data required by 10 CFR 26.71(d) are provided on a standard form w th the exception of the i
summary of management actions and list of events reported, which are provided on a separate pag: titled " Summary of Management Actions."
11 there are any questions, please contact James Brown or Hollis Hutchison 61 (817) 897 8912 or (817) 897-8940, respeccively.
Sincerely, ajlii,!]Yu a n : h L c h i> lh 0 7 6 f) w WilliamJ.CahiN.Jr.
'['
W!
~
By:
Roger D. Walker 5
Manager of Regulatory Affai.s for NE0
-DNB/dnb 3
Encl osui c a
c-Mr... L. Milhun Region it ResiGent inspectors, CPSES (2)
Mr. T. A. Bergman, HRR (clo)
Mr. B. E. Holi an, NRR (clo)
- J00?S i
9207270057 920721
/
{DR ADOCK 050004 5 I
400 N. otive street Ln. si natias. - u s ?5201
]
N:
.._.m.
. Enclosure to1TXX-92346:-
Page,1-of?3:
6
- Q.'
Fitness for Duty Program
' Performance Data 4
. Personnel Subject to -10CFR 26 ETU ELECTRIC 4.:
JUNE 30, 1992 m
r comparv s wres Enong
' COMANCHE PEAK STEAM ELECTRIC STATION, GLEN R.0SE TEXAS Locacon
-JAMES E. BROWN (817) 897-8912 t
- Contas nan Phone (induos area code)
Cutotts: ScreerVConfirmation (ng'mi)
B Appenoix A to 10CFR 26 Marijuana '
- /
Amphetamines
/
/
Cocaine
/
Phencyclidine
/
/
. Opiates
/
Alcohol (% GAC)
/
Long-Term Short-Term Testing Hesults Ucensee Employees Contractor Personnel Contractor Personnel Average Number wat
. Unescorted Access -.
1253 4404 l
Categories ~
Tested i Positive Tested Positive Te.ited Positive i
- Pre-Access 10-O-
N/A 1155 15
[
Post ar e Jent 0-O p.:
h!
- Observed behavior u
8 4
Random
-744 1
2685 13 i
FoNow-up 1
0 0
j L
Other.
O O
755 1
l 3848 32 Total..
REv.1/92
-li
.~
~..
Breakdown of Confirmed Positive Tests for Specific Suhstances Amphe-Pt.ency-Flefusal Marijuana Cocaine Opiates tamim chdwie Alcohol to Test 1
2 3
4 5
Licensee Employees 1
0 0
0 0
0 0
l Long Term Contractors Short-Term Contractors 15 9
0 3
0 7
3 A
j 38 Tottil 16 9
0 3
0 7
3 o
M Si a
Bm Et L.
e, E?
m a.
i y
3 Enclosuree to TXX-92346 Page 3 of 3 COMNCHE PEAK STEAM ELECTRIC STATION FITNESS FOR DUTY Summary of Management Actions Six Months Ending June 30, 1992 IV Electric was informed on January 14, 1992 that the National Institute on Drug Abuse had lif ted its suspension of the certification of the contract lab being used to perform urine drug testing.
This suspension and details of alternative testing arrangements are recorded in the.econd half of 1991 -
Fitness For Duty Performance De 3 Report - Summary of Management Action.
After this notification, testing was resumed with this lab.
TU Electric felt compelled to review and consider alternatives to the arrangement with the current lab.
It was determined that the problem was created due to the fact that the current lab had only one facility to conduct urine drug testing.
With this in mind, it was determined that a multi-facility lab more appropriately meet the needs of TU Electric.
After a review of several multi-facility laboratories, a conditional selection was made.
On April 20, 1992 the TU Electric Operations QA Manager notified the TU Electric Contracts Department that a pre-contract award inspection / audit of the lab selected had been performed.
The report indicated that the operations at the. lab was satisfactory for Fitneas For Duty testing.
On May 11, 1992 USNRC Region IV was informed that TU Electric was in the process of awarding a contract to a multi facility lab for urine drug testing.
On May 18, 1992 the new lab began urine drug testing for the Fitness For Duty Program.
On June 17, 1992 Random Drug / Alcohol Tecting was conducted on the Night Shift.
During this time, an individual produced a breath alcohol test result above the cut-off Icvol.
The result of the teut were accurately recorded in the log, but no confirmation test was performed.
The confirmation test was not performed because the Fitness For Duty Supervisor misunderstood the information provided by the lab technician that performed the test.
The individual was allowed to return to work.
The next day, the Fitness For Duty Supervisor realized the mistake and made TU Electric Management aware of the mistake. Appropriate corrective action was taken and NRC Region IV was infonaed of the inciden*. and the corrective action taken.
The inspect r recommended the incident be included in the 6 month Fitness For Duty Performance Data - Summary of Management Action rather than as a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notification.
A A
hY 92,b%
' Fi rms Fm T)uTN l>4 M 1" liqLF th L
Dallas Distributed Site Distributed g
-W..G. Counsil-19BT W. J.
Cahill, Jr.
E22 W. M.-Taylor-19BT BY SUBJECT R. D. Walker / _24ST
^^'
J.
S. Marshall I.
~
..... cf m.
.s..
.sv<
R. A. Wooldridge 32BT E-
'^^
F. Johnson (FC)
^
L. Haltom 21BT-
_ f"""'
^^"
CCS -'E06 uvunj u.
u.
uov =
ovv BY SUBJECT O
n.
v.
- m. u....
9peammideedhrn mr
.T.
L.
s.J L _._; 2 :
?---
=
t movev
_-]
-^; 7%
s.
v.
rv. nutteLL GU/W
.QAS_E
.,m wm., m;.
- 1 DOCKET RELATED n
u
-r 41, -
A. B. Scott LO1 e
n._.__..
,,em 1._,,...
-me u
n e, u,,, 4
- 3m-
.r r
u.,u d -
mn,
_=
_Q2SES IR & RESPONSES-g., r GENERIC o.
nomo-ww 2'"*
t'. Z 2_'.
ivi*
""(
-n.
ey---
2 3.,
_ 2_, _ : '__ ' -
ORC or STIPULATION RELATED m
CPSES IR.QELY
^'
- b --
g v)
VENDOR
^_.._11
"^'
S.QAR/PART 21'S OTHER R-
'44 ct TXX File (Site)
A09 Eh!
Hellh R Mtbsm OW
)
OTHER ja g
pg uw PC W l TXX - File -- (Corp) 24 ST 3 M - (5th 2 #r ST NOTES:
-(FC) - First-Class Mail IR - Inspection Reports NODIL -
Correspondence related to material / component acceptability.
CASE -
Citizens Association for Sound Energy - All filings and correspondence between the NRC staff and TU Electric.
. VENDOR -
Vendor documents per STA-20, (Vendor Document Group or VETIP Coordinator).
i
'SDAR/21s - LER IR(CPSES)
.IR(ALL)
X
-ISEG X
X X
X X
ORC X
X X
X X
X ORC also-includes description letters for changes to licensing basis document.