ML20043C185

From kanterella
Jump to navigation Jump to search
Forwards Proposed Schedules for Submission & Requested Approval of Licensing Items
ML20043C185
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/29/1990
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9006040198
Download: ML20043C185 (7)


Text

..

= /Jabama Powtr Company 1

g

- * . 40 inverness Osnter Parkway

....' '

  • Post Office Box 1295

' Dirmingham, Alabama 35201 Telephone 205 868 5581 W, G. Hairston, til

- Senior Vice President Nuclear Operations Alabama Power the southern electrc system .

10 CFR 50.90 May 29, 1990 Docket Nos. 50 348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Vashington, D. C. 20555 Gentlemen Joseph M. Farley Nuclear Plant Status of Licensing Items Attached-for your information are the proposed schedules for the submission and requested approval of licensing items. Attachment 1:

contains a prioritized listing of license amendment and other requests,.

Attachment 2 a listing of completed items and Attachment 3 a listing of other 1990 NRC related submittals. During 1989 six requested licensing actions were dispositioned by the NRC. Alabama Power Company appreciates

-NRC efforts in this area.

'If you have any. questions, please advise.

Respectively submitted, V al ton, III VGH,III/JARimgd.17.36 Attachments cc Mr. S. D. Ebneter Hr. S. T. Hoffman Mr. G. F. Maxwell 9006040198 900529 PDR ADOCK 05000348 Vy

/>

P PDC

///

ATTAD M NT 1 STA'RIS OF llGNSE

  1. GGENT #O ODIER PEQUESTS PIOPOSED ACRIAL REQlESTED ACIML APCo A% MC MC 1RC SLEKr1TAL SUEMITTAL AP!WNAL APPIO/AL TAC IMH DEIE IRIE (S) DATE IRIE jL. REMARKS 1-. Updated ISI 06-15-90 12-16-88 07-15-90 71578 Partial interim Program Relief 06-08-89 relief granted Requests (Rev. 0 04-12-90 03-31-89. Final

& 1),ENP-2 relief needed to support FNP-2 refueling outage.

2. Additional ISI 06-15-90 09-09-88 07-15-90 65482 Issues similar to Reliefs for 2nd 04-12-90 item 11 however.-

10-Year Interval not necessary to (Rev. 1, 2 & 3), support FNP-1 PNP-1 refueling outage.

3. Visual Inspection -

02-08-90 OM)1-90 76064 Required prior Surveillance' to August 6, 1990 Periodicity for to prevent forced Inaccessible. shutdown of thit 2 Snubbers, for surveillance; PNP-2(T.S.4.7.9a) similar to PNP amerdments #69/61.

4. Revision to 05-31-90 02-19-90 08-25-90 76181 Similar to relief Exenption 76182 granted Vogtle-Request-Vorker Nuclear Plant.

Respiratory Protection Apparatus, FNP-1 and 2

5. Control Rod 06-06-90 09-30-90 Safety evaluation Insertion vill be similar to Limits, FNP-1 Point Beach amend-and 2 ments #88/93.

(T.S. 3.1.3.5) Necessary to support FNP-2 refueling outage.

6. Increase Steam 06-30-90 10L-30L-90 May be required Generator Tube during next ,

Phsging Limits refueling outages.

to 15%, INP 1 & 2 (T.S. Fig.2.1-1)

Attadamt 1

Status cf License

[ Amanthuant ed Other Requests

Page 2. .

PBeasm enmL Ru sSno rawL APh APCo MC  !@C  !@C SLEF"tTAL SLEKrITAL APPROVAL APIRNAL TE RD%ES 111!H J$$ _ IRTE (S) DAIE DAIE #_

7. Steam Generator 07- L 90 10-30-90 May be required 1bbe Sleevirg at during next re-7bbe Support _ fueling outages.

Plates, FNP 1 & 2 Westirghause, B&W

- (T.S. 4.4.6.4) .and Bechtel tedniques mder evaluation.

B.: Updated and 06-15-90 12-15-88 11-15-90 71579 Partial interim

- Additional ISr 07-20-89 relief granted Program Belief. .03-31-89.

Requests (Rev. O,

-1 & 2), FNP-2

9. Additional IST 06-15-90 09-09-88 11-15-90 65489 Reliefs for 2nd 10-04-89 10-Year Interval (Rev.2,3&4),

FNP-1

10. - Auxiliary 05-31-90 12-15 90 Building & Service Water Battery Surveillance Tests,FNP-1 and2(T.S.4.8.

2.3.2.c.5)

11. ~ End of Life 06-29-90 12- L 90 SafetyEaluation-Moderator vill be similar Tenperature co- to Millstone 3,-

efficient,- amendment #29.

FNP-1 and 2 May be aquired

' (T.S. 3.1.1.3) - in July 1990.

- 12. - -Seismic Instru- 07-05-90 01-15-91 mentation Tech Spec Change, FNP-1 ard 2 (T.S.3/4'3.3.3)

13. Revised Heatup 08-30-90 02-28-91 Current curves and Cooldown are only effective Curves, FNP-2 for 8 EFPY

'(T.S.3/4.10.1) (03-14-91).

Attadsent 1i Status of License

, Juanchment and Other_ Requests

. ; Page 3 -

PROPOSED ACIUAL REQlES11?D ACIllAL AP00 APCo  !@C t@C  !@C

, SLIMEITAL SLEKrITAL APPROVAL APPROVAL TAC

- TITM IRTE IWIE (S) IRTE IEIE L RDIARKS 14.. KID Bypass 07-07-90 02-28-91 Renoval, PNP-1 and2(T.S.-

Tables 2.2-1, 3.2-1and3.3-2)

'15. Quadrant Pwer 07-02-90 03-02-91 Tilt Ratio Alterrate

- 1himble lhe, FNP-1 and 2 (T.S.3/4.2.4.2)

16. Removal of 07-20-90 6 24-91 Generic Intter Fire Protection 88-12 request.

Requirements

-from Technical Specifications FNP-1 and 2

17. Incorporate 11-15-90 E 15-91 Tech Spec O mnges Allowed by Generic letter 89-14(thisre-vises 3.25 surveillance criteria)iFNP-1 ,

and 2

18. .ESFAS Time.  % 22-90 06-22-91

Response

for Steam Break SI, FNP-1 and 2, (T.S.3/4.3.2) 19.- Remove 0/cle 07-15-90 07-15-91 Specific Para-meters frm Tech Specs per-Generic Istter

' 88-16,' FNP-1 aryl 2 -

'20. RER Suction 08-15-90 08-15-91 Potential refer-Valve Auto once to V0G Closure Inter- activities may lock Removal. be made.

FNP-1 and 2 (T.S. 3/4.9.8)

(

-Attachumt 1

. Status of License ,-

Amansuunt pnd Other Requests Page;4- ~t .

ISOPOSED ETRL RBQlESIED E%RL ,

m m- we . we no SLEHr1TAL SLBETTAL /J'IPOVAL APPROVAL TAC i TITH IR1E IRE (S) _ IRIE DGE L REMARKS

?

. 21 6 10CFR55 revision 09-15-90 09-15-91 related charges,-

FNP-1 and 2 (T.S.6.4)

22. . Im Flow INE 10L.15 90 10-15-91 -

latter only, not

. Bases Correction, an . _ Amir ,

-FNP-1 and 2 request. ,

l- (T.S. Bases 2.2.1)_

232- Delta Flux 11-15-90 11-15 14tter m1y, not Deviation an amenenent Alarm Setpoint, request. ,

FNP-1 and 2

-l

.(T.S. Bases

~3/4.2.1) 1  :

24. Operational- 07-27-90 12-25-91 Evaluation Program Deletion, FNP-1 and 2 (T.S.6.2.3.3)
25. Substitution of 12-15-90 01-15-92 manual valves for H0Vs 3238 and 3239, FNP ,,

.and2(T.S.3.6.3) 26.- VANTAGE;-5 Fuel 04-30-91 01-31-92

~ Use, FNP-1 and 2

37. Midloop Operation 03-01-91 02-01-92 marges per Generic letter 88-17 Review FNP-1 and 2 (T.S.

3/4.9.8.1, 3/4.5.2 and3/4.1.2.3)

-M. Ebel Recon- Awaiting Me sititution, revised guidance.,

FNP-1 and 2 (T.S.5.3)

JAR:ngd 17.26

Fi i b

'- M D O 9 9tr 2 OMUMB 120NE #UDHtt MD UIER jurFEIS PROPOSED ACIUAL RBQlESITD ACTUAL ,

AP00 AP00  !@C 10 0 lac SLEMITTAL SLEMITTAL APPROVAL APPROVAL TAC ',

ITEM MIE IWIE (S) DATE MIE L 13 HARKS

1. tec Bulletin !b. 08-29-88 04-28-89 67306 Conplete by 88-02 Analysis 67307 interim Approval, relief.

. PNP-1 and 2

2. RCrIS (Rx- '12-14-88 05-04-89 59732 Couplete vesselInvel) 01-30-89 59733 80n2 Surveillance, 04-06-89 PNP-1 and 2 ,
3. Extend  : 0B-11-86 05-19-89 62187 Complete Operating "07-22-87 62188 81n3 .,

License Expiration Date, 3

PNP-1 and 2

4. Miscellaneous 03-20-89 OLO7-90 72876 Conplete T.S. Changes, 09-25-89 72877 82n4 PNP-1 and 2 l

l C i 1

.t l

4 l

?

I l

1-l .

p JAR:ngd 17.27 ,

3 l'

l

. . - ..-~ . .

s

' A2TK DENT 3 ,

SDmE W ODBt 1990 ISC REUmlD SBETTAIS .J i

1 HOF09D ACIUAL .

APCo APCo- i SDGTIAL SlD GTTAL l I'IDI IRTE IMTE (S) RDIARKS l

. 1.- 1909 Annual Report of 03-22-90 Omplete ,

10CFR 50.59 Plant O m ges, PNP-1 i and 2 -

2.- 1989 Annual D/G 03-27-90 Omplete -

Reliability Report

3. Revision to 00 m 05-09-90 00m and sof tware to incorporate changes to be conplete tac 11R reu ... .ded by 08-30-9).

mfinements

4. Generic Safety Of>-29-90 GL 90-04 f Issues Status 5 1990 FSAR Update 07-01-90 Annual update.
6. . Confinn actions 07-18-90 NG 90-01 regattling loss of fill-oil in i 4

Rosenount Transmitters i=

l

7. Deconmissionirs 07-26-90 10CH60.33(k)(2) ,

finding plan J report

8. Program description 09-30-90 --

GL E 03 and. .v for VETIP GL 83-28, Item 2.2,'

j' Part 2 l

l 9. . Radial Peeking Factor Report l'

l: a. thit 1, Cycle 11 03-01-91 60 days before startup-L b., thit 2, Cycle 8 08-31-90 60 days before startup ,

10. Startup Reports
a. thit 1, Cycle 11 06-01-91 90 days after startup ,
b. thit 2, Cycle 8 02-01-91 90 days after startup l ,

JAR: ngd 17.27 s

-- - - - -- - - - -,