Mr. J. B. Hosmer Engineering Vice President Commonwealth Edison Company Executive Towers West Ill 1400 Opus Place, Suite 500 Downers Grove, IL 60515 May 14, 1998
SUBJECT:
ENGINEERING MANAGEMENT MEETING
SUMMARY
Dear Mr. Hosmer:
On May 12, 1998, we met with you and members of your staff to discuss engineering activities at ComEd. Specifically, the meeting discussion focused on the engineering learning process.
The handout you provided to us during the meeting to aid in the discussion is enclosed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosure will be placed in the NRC Public Document Room.
Sincerely, origirial I sf J. A. Grobe John A. Grobe, Director Division of Reactor Safety
/
Docket Nos.: 50-456; 50-457; 50-454; 50-455; 50-231; 50-249;
. 50-:}73; 50-37 4; 50-254; 50-265; 50-295; 50-304 I
I I
Enclosure:
As stated See Attached Distribution
- t*I f) r-,,-,..,..
.,* t 'J v '
DOCUMENT NAME: G:ORS\\COM04158.DRS To receive a coDv of this document, Indicate In the box: "C" = Cocv without attachmenVendosure "E" =Copy with attachmenVendosure "N" =No coDv OFFICE Riil
.,; If/
NAME Duncan:sd4:"
DATE 05/~/98 9805280051 980514 PDR ADOCK 05000237 p
PDR Riii
- -IC Riii I
Riii Jacobson..1( &t"' Grobe 05118198 05/ /98 05/ /98 OFFICIAL RECORD COPY I
J. Hosmer cc w/encl:
2 M. Wallace, Senior Vice President D. Helwig, Senior Vice President G. Stanley, PWR Vice President J. Perry, BWR Vice President D. Farrar, Regulatory Services Manager I. Johnson, Licensing.Director DCD - Licensing T. Tulon, Braidwood Site Vice President K. Graesser, Byron Site Vice President M. Heffley, Dresden Site Vice President F. Dacimo, LaSalle Site Vice President J. Dimmette, Jr., Quad Cities Site Vice President J. Brons, Zion Site Vice President Braidwood Station Manager K. Kofron, Byron Station Manager P. Swafford, Dresden Station Manager T. O'Connor, LaSalle Station Manager W. Pearce, Quad Cities Station Manager R. Starkey, Zion Plant General Manager T. Simpkin, Braidwood Regulatory Assurance Supervisor D. Brindle, Byron Regulatory Assurance Supervisor F. Spangenberg, Dresden Regulatory Assurance Manager P. Barnes, LaSalle Regulatory Assurance Supervisor C. Peterson, Quad Cities Regulatory, Affairs Manager R. Godley, Zion Regulatory Assurance Super\\tisor R. Hubbard, MHB Technical Associates N. Schloss, Economist, Offi~ of the Attorney General State Liaison Officer State Liaison Officer, Wisconsin Mayor, City of Zion Chairman, Illinois Commerce Commission W. Leech, Manager of Nuclear MidAmerican Energy Company
- I
J. Hosmer Distribution:
SAR (E-Mail)
NRR Project Mgrs. Braidwood, Byron, Dresden, LaSalle, Quad Cities, Zion w/encl A. Beach, Riii w/encl J. Caldwell, Riii w/encl B. Clayton, Riii w/encl SRls Braidwood, Byron, Dresden, LaSalle, Quad Cities, Zion w/encl DRP w/encl TSS w/encl DRS (2) w/encl RI 11 PRR w/encl PUBLIC IE-01 w/encl Docket File w/encl GREENS IEO (E-Mail)
DOCDESK (E-Mail) 3
COMMONWEAL TH EDISON ENGINEERING MEETING MAY 12, 1998 LIST OF ATTENDEES Com Ed J. Hosmer, Vice President, Engineering D. Farrar, Licensing R. Renhart, Engineering USN RC J. Grobe, Director, Division of Reactor Safety J. Gavula, Chief, Engineering Specialists Branch 1 J. Jacobson, Chief, Lead Engineers Branch M. Jordan, Chief, Branch 3, Division of Reactor Projects D. Butler, Reactor Engineer E. Duncan, Reactor Engineer MidAmerican D. Tubbs, Senior Engineer
ENGINEERING LEARNING PROCESS e.
COMED.*MEETING WITH NRC REGION III May 12,1998 NRC Meeting 5112198 1
ComEd A Unicom Company
AGENDA*
- 1, I
. *.op1c
- Slides
!!Y
+Introduction
~ Objectives of Presentation 3
Hosmer
- Nuclear Safety 4,5 Hosmer
-\\
+The Learning Process 6
Hosmer
+ Dresden ISi and SSFI Lessons 7-13 Renuart
+ Quad Cities* Lessons 14-16 Hosmer
- . + Measuring Learning 17-20 Renuart 9*
+ Conclusions 21 Hosmer*
NRC Meeting 5112198 2
ComEd A Unicom Company I,
L..~.:
j I
OBJECTIVES OF PRESENTATION
+Present the Learning Process.
. +Provide Examples of Learning by ComEd Engineering *
+ Disc*uss Measu*rements of Effectiveness
+Draw Conclusions about Effectiveness 3*
ComEd NRC Meeting 5112198 A Unicom Company I ;
. i.. ~
I I
. J
- ~
NUCLEAR SAFETY
,Outcome
- Avoidance of Events Learning from Experien*ces (Internal and External)
NRC Meeting 5112198 Achieved By Setting High Standards and Expectations Effective Learning Model
- -Assessment
- Corrective Action ComEd A Unicom Company
GENERAL LEARNING PROCESS MODEL I..
Set Standards. J------~1111 _____ *A_s_s_es_s_m_e ___ n_t_s ___,
94 Expectation Process
'97 /98 Common Expectations (Peer Group)
NRC Meeting 5112198 5
'95/97 Chief Assessments
'98 Team with Nuclear Oversight orrective Actions
. '97 Corporate Program Established ComEd A Unicom Company
THE LEARNING PROCESS AT COMED r----------------------------------------------------------------------
>>Management
>>Policies
>>Guidelines
- >>Self Assessments
>>Trending
>>EAG
>>Technical Assessments r------------------------------~--------,
i
~
Implement I
I 1
People l
Actions I
I I
I Corrective Action Process I
I Process I Determine
~ Actions
>>PIFs
>>Nuclear Operations Notifications
>>Daily Engineering Calls
>>Daily NGG Calls Assessment Process Corrective Action Program
)iii> Apparent Cause Evaluation
)iii> Root Cause Evaluation
)iii> Common Cause Assessment Department Review Chief Review Peer Group Review
~-------------
Com Ed NRCMeeting 5112198
.6 A Unicom Company
i '
DRESDEN ISi
+Assessment Proces*s:
.-.:Need to Better Understa~d and Maintain Design Basis
~Need to Improve Quality and Access to Calculations
- Improve the Quality of Operability Assessments
- Improve the Quality of Safety Evaluations
+Corrective Actions Process:
- Common NSPs (Operating Evaluations, 50.59, UFSAR)
- Safety Evaluation Tr~ining *
- SSFls in Engineering
- Design Basis Improvement Project
- EAG Program NRC Meeting 5112198 7
Ongoing.
. Ongoing Ongoing Started Started ComEd A Unicom Company
- ~
~*
Engineer~ng Assessment Model Program Assessments (Horizontal Slice)
Programs, e.g., ISi, IST
--+----+----+___.:: Processes, e.g., Mod, Calculation Control
--+----+----+___.:: Products, e.g., Calculations, Drawings *
'H Engineering Self-Assessments (SSFI in Engineering)
NRC Meeting 5112198 8
ComEd A Unicom Company
SUMMARY
OF THE OVERSIGHT ACTIVITIES BY THE CHIEFS.
~
OVERSIGHT PERFORMED IN 1995-97
, Programs/Plants BRAIDMX>D BYRON DRESDEN LASALLE QUAD ZION ISi YES YES.
YES
- YES YES YES*
YES YES YES YES YES YES YES YES YES YES YES YES VETIP YES Yes YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES
- Although the oversight is indicated as "No", support WdS provided to the site.
NRC Meeting 5112198 9
ComEd A Unicom Company
EFFECTIVENESS of CHIEFS' OVERSIGHT ASSESSMENT*
+.Did Not Influence Standard Programs
- +Did Not Conduct*
- Effectiveness Reviews
+Did Not Get Non-conf ormances Into Corrective Action Program NRC Meeting 5112198 10 CORECTIVE ACTION Five Programs* Underway (ISi, MR, Appx R, IST, 89-13)
Conduct 3 - 6 Months PIFS Generated by Stations with. Corrective Actions Identified ComEd A Unicom Company
SSFI.
SUMMARY
- + Assessment:
- _:. Most Issues had been Previously Identified and Lacked Closure
>> Low Priority for Correcting Old Problems
>> Engineering C1:1Iture did not Encourage Problem
- .Identification Assessment
+ Corrective Action:
- Better Procedural Adherence
- Better PIF Initiation *as Problems are Discovered 9
- - Accountability through Nuclear Tracking System
- Im proved Engineering Work Control Program ComEd NRC Meeting 5112198 11 A Unicom Company
SSFI RESULTS
+*Identified 154 Issues
+ 66 (43°/o) Issues Are Closed
+ Open Items Are Tracked Through NTS ComEd NRC Meeting 5112198
.12 A Unicom Company I*.~~'.
I
-i
~l
SSFI RESULTS AND ACTIONS
+ Resolution to Common General Process Weaknesses
- Assessments Corrective Actions
- Design Basis
- Design Control Design Basis Improvements (DBI) Project Training, Process
.Improvements, NEP.Revisions for Design
- Not Learning From Strengthen Assessment Process Other Stations.
- Case Studies on Generic Items NRC Meeting 5112198 13 ComEd A Unicom Company r-"'!
l J
\\
. I
- QCNPS-LESSONS LEARNED: GOOD RESULTS
- .RW Clean-up Pipe Break Upgrade
. - Identified at Monticello Station
- Identified at Dresden
+Clean out of Reactor Bottom Head Drain
. - Identified at Dresden NRC Meeting 5112198 14 ComEd A Unicom Company
i ;
QCNPS-LES_SONS LEARNED:MIXED RESULTS
+Dresden ISi * *.
- HPCI Gland Seal Steam Condenser
>> Reevaluated And Reclassified In The SOPI
. Preparation Phase
+Air Start Motors
.. >> Identified at Quad Cities.
NRC Meeting 5112198 15
.ComEd A Unicom Company l
. QCNPS-LES~SONS LEARNED:* POOR. RES UL TS
+Maintenance Rule
. I
- . - Inadequate Overall.Performance
- Several NRC Violations
+Appendix R Fire Protection
-Lack of recognition of commitments
-SSA, FHA NRC Meeting 5112198 16 ComEd A Unicom Company
i ;
MEASURING LEARNING PROCESS.
+Major Engineering Events I
. ' *Repeat Events
+Percent PIFS Identified by Engineering on Engineering
+ ComEd Monitors All of Above NRC Meeting 5112198 17 ComEd A Unicom Company i.. ~
i i
.. 1
- ~
MAJOR E*NGINEERING EVENTS 20 -----------------.
15 e
tn Reactor Building Temp. Discovered @
c*
Dresden through DBI (I) 10 Containment Bypass w
at Dresden 5
o--. -
1995 1996 1997 1998 J liiiil Engineering Events j I__-------=========~----'------~
ComEd NRC Meeting 5112198 18 A Unicom Company
I REPEAT EVENTS METRIC I
1 8 1 8 1 4 1 2 1 0 a:
8 0
8 0
Sl 4
E
- J z
2 0
M BR W BYR ZIN DRS LAS QDC D e fin it i o n : T h o n um be r o f e v en t' th at o cc arr e d in th e p at t m o n th
1*ith completed root caU11 in v e1tig1tion rep ortt, which are re110 n ably 1im ihr in n 1ture to even t1 th at occurred in the p att 2..
1--------------------------------lm onth1 that have one or more of the 11m e root c1a111. (#of repe1t event* perm on th)
T hrethold: Oreater than or equal to 2 perm on th.
MAR 9 7 APR 9 7 M A Y 9 7 JUN 9 7 JUL 9 7 AU O 9 7 SEP 9 7 0 CT 9 7 N 0 V 9 7 DEC 9 7 JAN. 9 8 FEB 9 8 CBRW a BY R CJZIN CJD RS AR 97 A PR 97 M A y 97 JUN 97 JUL 97 AUG 97 SEP 97 0 CT 97 NOV 97 DEC 97 JAN 98 FEB 98 3
3 0
I I
2 2
0 2
I I
3 2
I 0
0 I
0 I
0 0
0 I
0 4
3 I 0 I
0 2
0 4
0 I
I I
6 I
0 0
0 0
I 0
0 I
0 I
I 3
0 I
I I
I 0
I I
2 I
I I
I I
0 I
I 0
I 3
0 I
Gr*ph displays total number of repeat events for a rolling 12 months. Table displays number of repeat events per month.
19 ComEd A Unicom Company NRC Meeting 5112198
..I
. 1
- '1.
- SELF-IDENTIFIED RATIO IN ENGINEERING GI =
1.2
.1 0.8
~0.6
~
en 0.4 0.2 0
~AT.P 1 Plant T.ine 0.29 0.31 BR NRC Meeting 5112198
.J
!"'~
1 0.37 BY Definition SIR is the ratio of PIFs generated by engineering staff to the PIFs generated for the ComEd's Engineering organization.
0.76 0.6 0.54 0.49 0.44 0.27 0.20 0
DR LA QD NES DFeb '98 OAverage ( 6 - 12 Months) 20 ComEd A Unicom Company
CONCLUSIONS
- Made significant fundamental changes to the learning process i1;1 ComEd's Engineering.
+. Will monitor performance using the Significant Events, Repeat Event Metric and other indicators such as the Self-Identification Ratio for: Engineering PIFs.
- Existing data and trends are in the correct direction. Still have declining performance trend at Quad Cities.
- Issue Appendix R - QC Appendix G - QC Maintenance Rule NRC Meeting 5112198 Failure Lack of Recognition Corrective Actions Look Back Poor Program Improved Std Programs Poor Communication ISi Program Change Safety Culture*
Licensing Reviews Cu~ture Change Late Assessment No Action 21 3 mos Prior to Inspection Teamno~ach A Unicom Company