TVA Nuclear Quality Assurance (Nqa) Plan (TVA-NQA-PLN89-A) - Annual Update
ML042470056
Person / Time
Site: Browns Ferry, Watts Bar, Sequoyah, Bellefonte  Tennessee Valley Authority icon.png
Issue date: 08/31/2004
From: Burzynski M
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML042470056 (175)


Text

Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402-2801 AUG 3 1 200 10 CFR 50.54(a) 10 CFR 50.55(0(3) 10 CFR 50.71(e)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:

In the Matter of ) Docket Nos. 50-259 50-390 Tennessee Valley Authority ) 50-260 50-391 50-296 50-438 50-327 50-439 50-328 TVA NUCLEAR QUALITY ASSURANCE (NQA) PLAN (TVA-NQA-PLN89-A) -

ANNUAL UPDATE This letter transmits TVA's NQA Plan which has been updated since the last annual submittal. This revision is provided in accordance with 10 CFR 50.54(a),

10 CFR 50.55(f)(3) and in accordance with the periodic submittal frequency of 10 CFR 50.71 (e).

The NQA Plan, Revision 14, reflects the nuclear organization in place as of July 1, 2004. On June 29, 2004, TVA announced plans to transition to a new organization. Individuals begin assuming positions in the new organization on September 6, 2004. These new plans involve: (1) continued standardization of organizations at the operating sites, and (2) further consolidation of functions to enhance service and support to the nuclear sites. TVA will evaluate the new organizational changes that impact the NQA Plan under 10 CFR 50.54(a) and 10 CFR 50.55(f)(3) for reductions in commitment. Before implementation, any such reductions will be submitted to the NRC Staff for approval. itemizes changes to the NQA Plan and provides justification for each change. Enclosure 2 provides a copy of the revised NQA Plan, Revision 14. provides the transition organization.

The changes transmitted with this letter do not involve any new reductions in commitment requiring Staff approval. There are no new commitments in this letter. 9 oq Pnntedonrecled pa

U.S. Nuclear Regulatory Commission Page 2 AUG 3 1 200 There are no new commitments made by this letter. If you have questions, please contact R. M. Brown at (423) 751-7228.

Sincerely, rk Jurzyn Manag r Nuclear Licensing Enclosures cc (Enclosures):

Ms. Eva A. Brown, Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. Steve J. Cahill, Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 Ms. Margaret H. Chernoff, Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. Manny M. Comar, Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2738 cc: Continued on page 3

U.S. Nuclear Regulatory Commission Page 3 AUG 3 1 2004 cc (Enclosures):

Mr. Kahtan N. Jabbour, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. Robert J. Parcarelli, Project Manager U.S. Nuclear Regulatory Commission MS 08G9 One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 NRC Senior Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379-3624 NRC Senior Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381-2000

ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY NUCLEAR QUALITY ASSURANCE PLAN (TVA-NQA-PLN89-A), REVISION 14 DESCRIPTION OF CHANGES Revision 14 Changes Change and Justification Policy Statement In the last sentence of the first paragraph, added "and independent spent fuel storage."

Clarify/enhance ISFSI requirements to implement I OCFR72.

List of Abbreviations Added the following:

ISFSI - IndependentSpent Fuel Storage Installation ITS - Important to Safety Clarify/enhance ISFSI requirements to implement I OCFR72.

Section 2.0, Applicability In item 1, added "andISFSI."

Clarify/enhance JSFSI requirements to implement I OCFR72.

Subsection 4.1.3.B.5.b added a new item 12 to read:

"The 10 CFR 72.48 Program. 10 CFR 72.48 evaluations will be screened. Review of representative 10 CFR 72.48 evaluations will be performed, selected based on safety significance, for 1) changes to procedures, facility, or spent fuel storage cask design, and 2) tests or experiments completed under the provision of 10 CFR 72.48, to verify that such actions did not require a license amendment;"

Clarify/enhance ISFSI requirements to implement IOCFR72.

Subsection 4.1.3.B.5.b Added a new item 13 to read:

"Proposed changes to facility, or spent fuel storage cask design that require a license amendment as defined in 10 CFR 72.48."

Clarify/enhance ISFSI requirements to implement IOCFR72.

l

Revision 14 Changes Change and Justification Subsection 4.1.4 Added the following:

Section B, Nuclear Assurance Nuclear Assurance responsibilities and requirements are contained in Section 4.1.6.

Changed the reporting relationship of the General Manager, NA from a "direct" report to the CNO and Executive Vice President, TVAN, to a direct (hard-line) report to the Vice President, Nuclear Support. The General Manager, NA, still retains access and a "dotted-line" reporting channel to the CNO and Executive Vice President, TVAN.

Subsection 4.1.6.A Revised the first paragraph to read:

"The General lIManager, NA, reports to the Nuclear Support Vice President. The General Manager, NA, has an independent reporting relationship to the Chief Nuclear Officer and Executive Vice President, TVA Nuclear on quality status and issues."

Changed the reporting relationship of the General Manager, NA (and organization) from a "direct" report to the CNO and Executive Vice President, TVAN, to a direct (hard-line) report to the Vice President, Nuclear Support. The General Manager, NA, still retains access and a "dotted-line" reporting channel to the CNO and Executive Vice President, TVAN.

Subsection 5.3.A Added "and ISFSI" Clarify/enhance ISFSI requirements to implement IOCFR72.

Subsection 6.1.2.E.3 Added the following "(including the contractor's dry cask storage system Certificate of Compliance licensing basis documents)"

Clarify/enhance ISFSI requirements to implement I OCFR72.

Subsection 9.13.D Deleted the last sentence from the section which stated:

"The General Manager, NA, is responsible for concurring with TVAN inspector certifications."

TVA determined that this change constituted a Reduction in Commitment to the quality assurance program. Therefore, the change was submitted to NRC for review by letter dated 8/28/2003 (and supplemented by letter dated 1/1 6/2004) prior to implementation in accordance with CFR 50.54(a)(4). NRC approved this change by letter (and included Safety Evaluation) dated May 23, 2004.

2

Revision 14 Changes Change and Justification Subsection 9.9.2.A.2 Added a new item k to read:

"ISFSI activities as required by 10 CFR 72."

Clarify/enhance ISFSI requirements to implement I OCFR72.

Subsection 14.1 Added the following documents to the listing:

10 CFR 72, Subpart F, "General Design Criteria" 10 CFR 72, Subpart K, "General License for Storage of Spent Fuel at Power Reactor Sites" 10 CFR 72, Subpart 1, "Training and Certification of Personnel" Clarify/enhance ISFSI requirements to implement 10CFR72.

Subsection 14.5 Added the following document to the listing:

NRC Certificate of Compliance for the Holtec International HI-STORMI 100 Cask System, Docket No. 72-1014 Clarify/enhance ISFSI requirements to implement 10CFR72.

Section 15.0, Definitions Added the following definitions:

"Important to Safety (10 CFR 72) - A system, structure, or component condition/function required to store spent nuclear fuel safely; to prevent damage to spent nuclear fuel during handling and storage, and to provide reasonable assurance that spent nuclear fuel can be received, handled, packaged, stored and retrieved without undue risk to the health and safety of the public."

"Independent Spent Fuel Storage Installation (ISFSI) - A complex designed and constructed for the interim storage of spent nuclear fuel and other radioactive materials associated with spent fuel storage. (Refer to 10 CFR 72.3). It is comprised of the Facility, Storage Units, and Ancillary Equipment. An ISFSI that is located on the site of another facility licensed under 10CFR Part 72 or a facility licensed under IOCFR Part 50 (e.g., an operating nuclear power plant) and that shares common utilities and services with such a facility or is physically connected with such other facilities may still be independent."

Added "and 10 CFR 72.48" at the end of the definition for Special Tests.

Clarify/enhance ISFSI requirements to implement 10CFR72.

3

Revision 14 Changes Chan2e and Justification Appendix B, Table I Added "10 CFR72.48" to the same table row that lists 10 CFR 50.59.

Clarify/enhance ISFSI requirements to implement IOCFR72.

Appendix B, Table 2 Under NRC Regulatory Guide 1.88, change the first sentence to read:

"Requirements of Regulatory Guide 1.88 (and the alternatives listed below) apply to 10 CFR 72 required records including: Records required by 10 CFR 72 must be maintained in duplicate storage."

Under NRC Regulatory Guide 1.88, add or change the following items under the SQN records:

15. Records required by 10 CFR 72 (retained for the life of the Storage Cask License).
16. Records of screening reviews and evaluations performed for changes made to the facility, spent fuel storage cask design, procedures, tests or experiments pursuant to 10 CFR 72.48 (retained for the life of the Storage Cask License).

Under NRC Regulatory Guide 1.88, add or change the following items under the BFN records:

4. Records of screening reviews and evaluations performed for changes made to the facility, spent fuel storage cask design, procedures, tests or experiments pursuant to 10 CFR 72.48 (retained for the life of the Storage Cask License).
9. Records required by 10 CFR 72 (retained for the life of the Storage Cask License).

Clarify/enhance ISFSI requirements to implement IOCFR72.

Appendix C Added subsection 5.0 to read as follows:

5.0 Classification of Dry Cask Storage System The Dry Cask Storage System is engineered to provide safe storage of spent fuel on the ISFSI pad. These components will be designated as Important to Safety (ITS) classification category A, B, C in accordance with NUREG/CR-6407. For procurement purposes, 10 CFR 21 will apply to 10 CFR 72 ITS category A and B components. For on site activities 10 CFR 72 ITS Category A and B components will be treated as safety-related under TVAN's existing QA Program. Similarly, 10 CFR 72 ITS Category C components will be treated as quality-related.

Clarify/enhance ISFSI requirements to implement I OCFR72.

4

Revision 14 Changes Change and Justification Appendix D Add a circle for the "ISFSI Facility."

Clarify/enhance ISFSI requirements to implement IOCFR72.

Appendix F Added Appendix F, Deferred Plant Equipment Policy.

TVA determined that this change constituted a Reduction in Commitment to the quality assurance program. Therefore, the change was submitted to NRC for review by letter dated 8/28/2003 (and supplemented by letter dated 1/16/2004) prior to implementation in accordance with CFR 50.54(a)(4). NRC approved this change by letter (and included Safety Evaluation) dated May 23, 2004.

Appendix G Change the following item:

2. Safety Analysis Reports for the 10 CFR 50 Reactor Power Facilities Add the following item:
16. Safety Analysis Reports for the 10 CFR 72 ISFSI Facilities Clarify/enhance ISFSI requirements to implement I OCFR72.

Appendix H, Page 1 of 2 Deleted "General Manager, Nuclear Assurance," from the Organization Chart indicating a direct reporting relationship to the Chief Nuclear Officer and Executive Vice President, TVA Nuclear.

Changed the reporting relationship of the General Manager, NA (and organization) from a "direct" report to the CNO and Executive Vice President, TVAN, to a direct (hard-line) report to the Vice President, Nuclear Support. The General Manager, NA, still retains access and a "dotted-line" reporting channel to the CNO and Executive Vice President, TVAN.

Appendix H, Page 2 of 2 Added "Nuclear Assurance" to the Organization Chart indicating reporting to the Nuclear Support Vice President. Added a "dotted line" from Nuclear Assurance to the Chief Nuclear Officer and Executive Vice President, TVA Nuclear, and included a note with the "dotted line" stating the following:

"Independent reporting to the Chief Nuclear Officer and Executive Vice President, TVA Nuclear, on quality status and issues."

Changed the reporting relationship of the General Manager, NA (and organization) from a "direct" report to the CNO and Executive Vice President, TVAN, to a direct (hard-line) report to the Vice President, Nuclear Support. The General Manager, NA, still retains access and a "dotted-line" reporting channel to the CNO and Executive Vice President, TVAN.

5

ENCLOSURE 2 Tennessee Valley Authority Nuclear Quality Assurance Plan Revision 14

NUCLEAR QUALITY ASSURANCE Tennessee Valley Authority Nuclear Quality Assurance Plan TVA-NQA-PLN89-A Revision 14

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 1 of 113 REVISION LOG Page 1 of 5 REVISION EFFECTIVE PAGES NUMBER DATE DESCRIPTION OF REVISION AFFECTED 0 Refer to Appendix A Initial Issue All I No later than First annual update All 2/25/91 2 No later than 4/17/92 Second annual update All 3 No later than 4/19/93 Third annual update All 4 No later than 4/19/94 Fourth annual update All 5 No later than 6/15/95 Fifth annual update All for BLN, BFN and SQN.

By fuel load for WBN.

Note: Section 12.2.E.2 is effective after NRC approval.

6 Upon issuance for Revised to incorporate subject 4,15,16,17, 22, 23, BLN, BFN, and SQN. matter relocated from WBN Unit 1 25, 65-71, 77,78, 79, By fuel load for WBN. Technical Specifications, Chapter 92,103,110,111 5.0, Administrative Controls.

7 Subsequent to Revised to incorporate 2,6,9,11-18, NRC's acceptance subject matter relocated 20-26, 30, 31, of corresponding from SQN and BFN Technical 33,34,39,42, Technical Specifications, Chapter 6.0, 45,46,49, 51, Specification changes. Administrative Controls; 52,55,59,60, and other changes as indicated 62,64,65,67, Effective by revision bars. 69-79, 86, 87, 89, 7/27/98 92-94, 97,111, 115, 119-121, 123,126, 133-1 36 8 9/11/98 Revised to update 3-7, 8-29, organization charts in 32-35, 37-43, Appendix H, and position 45,48, 50, 51, titles and functional 53-59, 61, 63, responsibilities throughout the 64, 66, 67, 87, Plan. Removed redundant 92, 94, 95,100, information from Section 4.1 102, 105,106, that is addressed in the 108, 109 Responsibilities sections throughout the Plan. Revised Section 9.9 as a step in standardizing Plant Reviews.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 2 of 113 REVISION LOG Page 2 of 5 REVISION EFFECTIVE PAGES NUMBER DATE DESCRIPTION OF REVISION AFFECTED 8-Al 5/25/99 Addendum No. 1 adds 2, 5, 7,10,13, responsibilities for the 14,20,26, 34, Procurement organization 35, 37, 38, 50, and the Nuclear Support 55,63,108,109 organization, changes the reporting relationship of Corporate Licensing, and clarifies a function of Qualified Reviewers.

9 1/31/2000 Incorporated changes made in Revision 8, 2, 3, 7,10,13, PZ7 1213199 Addendum No. 1, and other changes as 14,20, 24, 26, indicated by revision bars. Revised to add 35,38, 39, 51, responsibilities associated with 56, 65, 70,84, independent technical reviews in Sections 92,96,109,110 4.1.3.D and 4.1.4.A. Added reference to 10 CFR 72 in Sections 5.1.A, 5.4.3, and 14.1, and Appendix B. Changed effective date from 12/13/99 to 1/31/2000 to accommodate impacted procedure revisions.

9-Al 1/31/2000 Addendum No. I clarifies that the ASME 2, 5, 8,11, 18, IlIl QAM is currently inactive. 22,23, 70 10 9/8/00 Incorporated changes made in Revision 9, 2, 3, 55-59,107, Addendum No. 1, and other changes as 109 indicated by revision bars. Standardized the requirements for plant reviews and the Plant Operations Review Committees (PORCs) in Section 9.9. Revised title in Appendix H.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 3 of 113 REVISION LOG Page 3 of 5 REVISION EFFECTIVE PAGES NUMBER DATE DESCRIPTION OF REVISION AFFECTED 11 6/29/01 Added reference to self-evaluation in 1-4,10,13,15-Section 3.3.4. Updated to comply with 10 18, 55, 57, 83, CFR 50.59 rule changes in Sections 84, 98,106,107 4.1.3.B.5.b, 9.9.2.A.5, and 9.9.2.B.7.i.

Changed reference to 'the quarterly trend report" in Section 4.1.4.A. to 'a performance report at least quarterly."

Updated the description of functions performed by the Nuclear Assurance organization in Section 4.1.6 to consolidate overlapping functions. Added reference to ANSI/ASNT CP-189-1991 in Appendix B, Table 1, page 8 to comply with 10 CFR 50.55a(b)(a). Revised Site Quality Managers qualification requirements in Section 4.1.6 and Appendix B, Table 2, page 9. Revised commitment to NRC Regulatory Guide 1.146 concerning Lead Auditor qualification consistent with approved NRC safety evaluations (Appendix B, Table 2, page 23). Revised Appendix H org. chart to reflect title change. Deleted the BLN Site Nuclear Assurance and Licensing Manager from Sections 4.1.6.A, 4.1.6.C and the Appendix H Organization Chart.

11-Al 8/20/01 Deleted the reference to the Vice 3,6,12 President, E&TS, as the Chairman of the Nuclear Safety Review Board.

11-A2 1/18/02 Revise the annual Fire Protection audit 3,6,63 frequency to 'a maximum interval of 24 months."

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 4 of 113 REVISION LOG Page 4 of 5 REVISION EFFECTIVE PAGES NUMBER DATE DESCRIPTION OF REVISION AFFECTED 12 08/19/02 Incorporate Addendum Nos. 1 and 2 to 1-4, 7,21,57, Revision 11. Added reference to 10 CFR 59, 65, 69, 77, 72 in Sections 5.1.B, 9.9.2.A.5, 9.9.2.B.7, 93, 95-98, 103, 12.2.E.4.d, and 14.1. Added 10 CFR 72, 108 Subpart G references to Appendix A matrix. Clarified that Regulatory Guide 1.88 with noted alternatives apply to 10 CFR 72 records in Appendix B, Regulatory Guide Conformance Status. Included the requirement that 10 CFR 72 records must be maintained in duplicate. Update retention times for 10 CFR 50.59 records to agree with 10 CFR 50.59(d)(3) in Appendix B for WBN, SQN, and BFN. Added records and retention time for 10 CFR 72 records to Appendix B for SQN and BFN.

Added reference to 10 CFR 72 in Appendix C, Section 4.4. Deleted note on Appendix H, Page 1.

12-Al 06/09/03 Added clarification to Section 4.1.6.A 4,7,17 12-A2 06/20/03 Added reference to BFN Unit 1 Restart 4,7, 17, 18,20, organization in Section 4.1.6, new Section 108-110 4.1.8, and Appendix H. Added Appendix I, BFN Unit I Restart Organizational Matrix.

13 08/27/03 Incorporated Addendum Nos. 1 and 2 to 4, 7, 21, 58,109 Revision 12. Updated Appendix H Organization Chart. Corrected minor format errors.

13-Al 03/12/04 Clarify and enhance ISFSI requirements to 4, 5,7-9,15,23, implement 10CFR72. (SQN PERs 03- 26, 56, 69, 70, 12911 and 12912) 72,76,84,94, 97, 98, 102-106, 109 13-A2 04/30/04 Moved the reporting relationship of the 4, 7,16,17,110, General Manager, NA (and organization) 111 from a 'direct' report of the CNO and Executive Vice President, TVAN, to a direct (hard-line) report to the Vice President, Nuclear Support. The General Manager, NA still retains access and a 'dotted-line' reporting channel to the CNO and Executive Vice President, TVAN.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 5 of 113 REVISION LOG Page 5 of 5 REVISION EFFECTIVE PAGES NUMBER DATE DESCRIPTION OF REVISION AFFECTED 13-A3 6/4/04 Deleted requirement that the General 1-5, 8, 9, 45, Manager concur with TVAN Inspector 47, 110 Certifications (Sections 9.1.3.D and 9.3.3.F). Added Appendix F, Deferred Plant Equipment Policy.

14 Incorporated Addendum Nos. 1, 2 and 3 All from Revision 13.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 6 of 113 NUCLEAR QUALITY ASSURANCE PROGRAM (NQAP) POLICY STATEMENT It is the policy of the Tennessee Valley Authority (TVA) that activities which affect quality be accomplished in a planned and systematic manner to achieve compliance with preestablished quality objectives and acceptance criteria. Accordingly, TVA has established and will maintain a Nuclear Quality Assurance Program (NQAP). The NQAP includes the Nuclear Quality Assurance Plan and the approved documents which are used to implement the Plan. The quality assurance program and requirements for specific items and activities are applied commensurate with their importance to safe, reliable nuclear operations and independent spent fuel storage.

Management policies and requirements for the TVA NQAP are established by the Chief Nuclear Officer and Executive Vice President, TVA Nuclear. These management policies and requirements provide the controls that must be applied to the activities performed by and for the agency to ensure implementation of TVA commitments.

Nuclear Assurance (NA) is responsible for maintaining the TVA Nuclear Quality Assurance Plan. NA is responsible for determining if the quality assurance program and quality requirements are being implemented by performing verification activities and informing management of quality problems.

The QA program is founded on the principle that the line organization has the primary responsibility for quality and safety. Self-assessment practices are used to ensure the desired levels of quality and safety are achieved and maintained.

Line management is responsible for establishing quality requirements in procedures and instructions and ensuring that the achievement of quality receives major emphasis in planning, implementing, verifying, and documenting work. Quality assurance objectives are not to be subordinated to achieving cost or schedule objectives. Line management will be held accountable for compliance with the quality assurance program and quality requirements.

Conflicts involving interpretation of quality assurance requirements of TVA's NQAP are resolved by the General Manager, NA, or (if necessary) the Chief Nuclear Officer and Executive Vice President, TVA Nuclear. Where TVA has delegated responsibility for implementation of parts of the NQAP to contractors, TVA line management retains responsibility for adequacy of contractor implementation of quality requirements.

Activities may be performed by a contractor using their quality assurance program, provided that the contractors quality assurance program is approved by TVA and appropriate interfaces are established.

Each employee is encouraged and expected to do the job right the first time and is responsible for complying with the requirements contained in the Nuclear Quality Assurance Plan and its implementing documents. Procedures and instructions must be followed or appropriately changed through a controlled change process before work proceeds.

Chief Nuclear ffi r and eral Manager, Nuclear Assurance Executive Viceresident, TVA Nuclear

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 7 of 113 TABLE OF CONTENTS SECTION TITLE PAGE REVISION LOG 1 POLICY STATEMENT .6 TABLE OF CONTENTS .7 LIST OF ABBREVIATIONS .9 1.0 PURPOSE .10 2.0 APPLICABILITY .10 3.0 GENERAL .10 3.1 General Management Requirements .10 3.2 General Regulatory Requirements .11 3.3 NQAP Overview .11 4.0 ORGANIZATION .12 4.1 Functions of Organizations .13 5.0 NUCLEAR QA PROGRAM .21 5.1 Program Scope .22 5.2 Graded Approach .23 5.3 Program Elements .24 5.4 Program Documents .25 5.5 Program Changes .25 6.0 CONTROL OF DOCUMENTS AND RECORDS .26 6.1 Procedures and Instructions .26 6.2 Document Control .28 6.3 QA Records .29 7.0 DESIGN CONTROL .31 8.0 PROCUREMENT AND MATERIAL CONTROL .35 8.1 Procurement Document Control .35 8.2 Control of Purchased Material, Equipment, and Services .38 8.3 Identification and Control of Materials, Parts, and Components .40 9.0 CONTROL OF PLANT ACTIVITIES .41 9.1 Inspection and Line Verification .41

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 8 of 113 TABLE OF CONTENTS (Continued)

SECTION TITLE PAGE 9.2 Quality Assurance Assessments. 44 9.3 Control of Special Processes. 45 9.4 Test Control. 46 9.5 Control of M&TE and Installed Safety-Related I&C Devices . 49 9.6 Handling, Storage, and Shipping. 52 9.7 Inspection, Test, and Operating Status. 54 9.8 Control of Maintenance. 55 9.9 Plant Reviews. 57 10.0 ADVERSE CONDITIONS............................................................................................................ 61 11.0 INDOCTRINATION, TRAINING, QUALIFICATION, AND CERTIFICATION .............................. 64 12.0 AUDITING .................................................................................................................................... 65 13.0 COMPUTER SOFTWARE AND DATA .............................. 68

14.0 REFERENCES

.............................. 69 14.1 Regulations . 69 14.2 Regulatory Guidance ................................................................................................................... 70 14.3 TVA Licensing Submittal Documents .......................................................................................... 71 14.4 QA Manuals................................................................................................................................. 71 14.5 Other............................................................................................................................................ 71 15.0 DEFINITIONS.............................................................................................................................. 71 APPENDICES Appendix A: Comparison Matrix of Quality Assurance Plan Requirements With Those of 10 CFR 50, Appendix B, 10 CFR 72, Subpart G, and Selected ANSI Standards ....................................................................................................... 79 Appendix B: Regulatory Guide Conformance Status.......................................................... 80 Appendix C: Guidelines for Determination of TVA Identified Quality-Related Classifications ................................................................................................ 103 Appendix D: Scope of Nuclear Quality Assurance Program............................................... 107 Appendix E: Computer Software ........................................................................................ 108 Appendix F: Deferred Plant Equipment Policy.................................................................... 109 Appendix G: Types of Controlled Documents and Manuals ............................................... 110 Appendix H: TVA NQAP Organization Charts ................... .................... .................. I 111 Appendix I: BFN Unit 1 Restart Organizational Matrix ...................................................... 113

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 9 of 113 LIST OF ABBREVIATIONS The following abbreviations are used in this Plan:

AISC - American Institute of Steel Construction ALARA - As Low as Reasonably Achievable ANS - American Nuclear Society ANSI - American National Standards Institute ASME - American Society of Mechanical Engineers ASME III QAM - ASME Section III Quality Assurance Manual ASNT - American Society for Nondestructive Testing ATWS - Anticipated Transient Without Scram AWS - American Welding Society BFN - Browns Ferry Nuclear Plant BLN - Bellefonte Nuclear Plant CFR - Code of Federal Regulations DOE - Department of Energy E&TS - Engineering and Technical Services EPRI - Electric Power Research Institute FSAR - Final Safety Analysis Report l&C - Instrument and Control IEEE - Institute of Electrical and Electronics Engineers ISFSI - Independent Spent Fuel Storage Installation ITS - Important to Safety M&TE - Measuring and Test Equipment NA - Nuclear Assurance NDE - Nondestructive Examination NFPA - National Fire Protection Association NNS - Non-nuclear Safety NO - Nuclear Operations NPS - Nuclear Procedures System NQAP - Nuclear Quality Assurance Program NRC - Nuclear Regulatory Commission NSRB - Nuclear Safety Review Board NSSS - Nuclear Steam Supply System QA - Quality Assurance QC - Quality Control SNM - Special Nuclear Material SQM - Site Quality Manager SQN - Sequoyah Nuclear Plant TVA - Tennessee Valley Authority TVAN - Tennessee Valley Authority Nuclear WBN - Watts Bar Nuclear Plant

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 10 of 113 1.0 PURPOSE This document defines and describes the nuclear quality assurance (QA) requirements for Tennessee Valley Authority and establishes responsibilities for their implementation. The principal objective of the Nuclear Quality Assurance Program (NQAP) is to provide confidence that activities affecting quality during design, construction, operation, and maintenance are accomplished in a manner to achieve compliance with preestablished quality objectives and acceptance criteria.

2.0 APPLICABILITY The NQAP applies to (1) Tennessee Valley Authority Nuclear (TVAN) personnel and organizations performing activities that could affect quality-related structures, systems, and components at TVA's nuclear plants and ISFSI; (2) TVA non-nuclear organizations working either directly under the TVA NQAP or under their program as required by Intergroup Agreement; and (3) contractor activities that could affect quality-related structures, systems, and components, unless TVAN has approved alternate administrative controls for those activities.

3.0 GENERAL This Nuclear Quality Assurance Plan is formatted in such a manner as to provide users with a functionally usable document from which NPS documents are developed to implement the requirements stated herein.

The source requirement documents for QA activities are listed in Appendix B. Not only are the source requirement documents listed (e.g., ANSI Standards and Regulatory Guides) but they also specify the particular sections of these source documents that must be addressed (e.g., ANSI N18.7, Section 5.2.12). Providing specific sections of the source requirement documents facilitates use by individuals responsible for the development of applicable procedures and instructions.

However, it must be stressed that the entire set of source requirement documents referenced in each section must be reviewed and understood to capture the program requirements of each source requirement document in NQAP procedures and instructions.

The following subsections identify the management and regulatory requirements applicable to the NQAP. An overview of the program and a description of the functions of the various organizations performing activities within the scope of the program are provided.

3.1 General Management Requirements The management policies and requirements for the NQAP are established by the Chief Nuclear Officer and Executive Vice President, TVA Nuclear. These management policies and requirements provide the administrative controls that shall be applied to activities performed by and for TVA to ensure activities are performed in a manner consistent with QA objectives and to provide adequate record of accomplishment of commitments.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 11 of 113 3.2 General Regulatory Requirements The NQAP shall address the conditions of licenses and permits and encompass the applicable regulatory requirements contained in Appendix B of this Plan.

3.3 NQAP Overview The NQAP includes the NQAP Policy, this Nuclear Quality Assurance Plan, the ASME Section III Quality Assurance Manual (ASME IlIl QAM), and other quality-related NPS documents. The NQAP provides direction and implements requirements derived from regulatory requirements, national codes and standards, and other TVA commitments.

General regulatory guidance and national standards that TVA is obligated to implement in the NQAP are listed in Appendix B, "Regulatory Guide Conformance Status."

The ASME IlIl QAM is currently inactive because TVA is not actively pursuing an ASME Section III design and construction program. NQA Plan requirements associated with the ASME IlIl QAM are currently not required to be implemented.

3.3.1 Implementation The requirements established by this Plan and the ASME IlIl QAM are implemented by TVAN documents sponsored by various organizations. To ensure the NQAP is fully integrated and implemented, procedures and instructions address additional implementing level details contained in requirement documents on which the NQAP is based.

The terms "procedure" and/or "instruction," when used within this Plan, also includes written standards and documents of a similar nature.

3.3.2 Authority and Organizational Freedom of Those Performing QA Verification Personnel with responsibility for performing QA verification functions shall have sufficient authority and organizational freedom to:

A. Identify quality problems.

B. Initiate, recommend, and provide corrective actions through a comprehensive corrective action program.

C. Verify the implementation of corrective actions.

D. Initiate stop work, if required, to restrict further processing, delivery, or installation of a nonconforming item or unsatisfactory condition until completion of corrective action or satisfactory dispositioning.

The individuals and organizations responsible for performing QA verifications and assessments of the NQAP shall be formally designated and sufficiently independent from considerations of cost or scheduling to ensure objectivity in performing assessments. They shall be afforded direct access to appropriate management levels.

QA verification of conformance to established quality assurance program requirements is accomplished by those who have neither the direct responsibility nor the authority for performing the quality-related work activities being verified.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 12 of 113 3.3.3 Assessment of Effectiveness The General Manager, NA, shall assess the overall effectiveness of the NQAP for Corporate and nuclear plant sites (BFN, SQN, WBN, and BLN). Results shall be reported to the Chief Nuclear Officer and Executive Vice President, TVA Nuclear, and affected vice presidents. These assessments include TVAN and non-TVAN organizations and contractors. NA verifies the effectiveness of NSSS suppliers through audits and annual review of their performance.

The General Manager, NA, shall arrange for a biennial assessment of TVAN Corporate NA organizations' performance by an organization external to the NA organization. The General Manager, NA, assesses site quality assurance organizations' performance through the internal audit process.

3.3.4 Achievement of Quality in Performance Management personnel shall ensure, through organizational structure, self-evaluation, and assigned functional responsibilities, that the attainment of program objectives is accomplished by those who have been assigned the work.

Achievement of quality in the performance of quality-related activities is the responsibility of each individual involved in TVA's nuclear power program.

3.3.5 Interpretation of Quality Assurance Program Requirements The General Manager, NA, shall provide interpretation of Nuclear Quality Assurance Plan requirements. Differences involving interpretation or implementation of the Nuclear Quality Assurance Plan shall be immediately identified and reported to NA for resolution. If satisfactory resolution is not readily attainable, then the difference shall be escalated to the Chief Nuclear Officer and Executive Vice President, TVA Nuclear.

4.0 ORGANIZATION The organizational structure, functional responsibilities, levels of authority, and lines of internal and external communication for the management, direction, and execution of the NQAP shall be clearly established for all organizational levels. This Nuclear Quality Assurance Plan describes the general organizational structure and primary responsibilities of TVAN organizations and responsibilities of non-TVAN organizations involved in the NQAP. The TVAN Human Resources organization shall prepare organization charts that show overall TVAN organizational structure.

The overall organizational structure is shown in Appendix H. The NA organization is responsible for establishing upper-tier QA Program requirements and implementation of Quality Assurance functions at Corporate and nuclear plant sites. The size of the NA organization, including the size of respective Site NA staffs, is determined by assessing the resources required to adequately perform functions and workloads assigned to each NA organizational unit.

Each plant's Final Safety Analysis Report (FSAR) references the TVAN Organization Description (TVA-NPOD89) or provides a description of other key organizational positions, including the Chief Nuclear Officer and Executive Vice President, TVA Nuclear's, organization and plant operating staffs, responsible for administering and implementing the NOAP.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 13 of 113 4.1 Functions of Organizations TVA management, while carrying out their functions, are required to fully comply with all aspects of the NQAP applicable to their organization and ensure proper implementation.

This subsection identifies (1) functional responsibilities that are generally implemented through procedures and instructions by all TVA organizations involved in the program, and (2) specific NQAP responsibilities for sponsors of upper-tier Corporate program documents.

4.1.1 The Chief Nuclear Officer and Executive Vice President, TVA Nuclear, has the overall responsibility for the establishment, implementation, and administration of TVA's NQAP and the evaluation of its effectiveness. This responsibility is administered through his management staff as shown in Appendix H.

4.1.2 TVA Organizations All TVA organizations that work directly under the TVA NQAP have the following general functions:

A. Invoke appropriate NQAP requirements on other organizations that provide services for quality-related programs and features.

B. Regularly review the status and adequacy of those parts of the NQAP which they are executing.

C. Develop, control, and maintain procedures and instructions as appropriate to implement quality-related activities and processes.

D. Ensure appropriate controls for documents and records generated within the organization or received from external sources.

E. Ensure appropriate controls are developed and implemented to maintain housekeeping and cleanness requirements of facilities, systems, and components during the performance of work activities.

F. Identify and resolve adverse conditions and perform related corrective action activities including assessing trends for internally and externally identified problems.

G. Make personnel and resources available during audit performance and ensure that audit responses and corrective actions are completed within established timeframes.

H. Develop certification programs as appropriate and ensure that trained, qualified, and, where required, certified employees are used in the performance of quality-related activities.

I. Initiate stop work within their area of responsibilities when warranted.

J. Ensure personnel performing quality-related activities receive indoctrination and training as necessary to ensure that adequate proficiency is achieved and maintained.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 14 of 113 K. Ensure procedures adequately address interfaces of affected organizations.

L. Ensure during preparation and review of procedures and procurement documents that appropriate technical and QA requirements are included.

4.1.3 Engineering and Technical Services (E&TS)

A. In addition to the responsibilities described in subsection 4.1.2, the Vice President, E&TS, is responsible for managing the organization shown in Appendix H and ensuring that the QA requirements established by this Plan are either included or referenced (as appropriate) in related E&TS-sponsored program areas identified in the body of this Plan. Emergency Preparedness, Chemistry, Radiological Control, Radioactive Waste Management, and developing and maintaining the ASME IlIl QAM (inactive) are also responsibilities of the Vice President, E&TS.

B. Nuclear Safety Review Board

1. The Nuclear Safety Review Board (NSRB) is an offsite committee which provides senior level oversight of TVA's nuclear program with respect to nuclear safety. The NSRB reviews include the activities of the line organizations, as well as other review, audit, and verification organizations. The NSRB also provides senior level management with an assessment of facility operations and recommendations to improve nuclear safety and plant reliability.
2. The Chairman, NSRB, has an independent reporting relationship to the Chief Nuclear Officer and Executive Vice President, TVA Nuclear, and other TVAN management on nuclear safety matters. The Chairman, NSRB, is responsible for advising the Chief Nuclear Officer and Executive Vice President, TVA Nuclear, on the adequacy and implementation of TVA's nuclear safety policies and programs and for evaluating these policies and programs for compliance with regulatory requirements governing nuclear safety.
3. The chairman, NSRB, is responsible for complying with the requirements of ANSI N18.7-1976/ANS 3.2. The Chairman, NSRB, is also responsible for ensuring that the QA requirements established by this Plan related to NSRB functions are either included or referenced (as appropriate) in related procedures or instructions.
4. The NSRB shall function to provide for independent review as specified in Section 4.1.3.B.5.b and oversight of the audits and technical reviews as specified in Sections 12.2.E and 4.1.3.D.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 15 of 113

5. The Chairman, members, and alternate members of the NSRB shall be appointed in writing by the chief Nuclear Officer and Executive Vice President, TVA Nuclear, and shall have an academic degree in engineering or a physical science field, or the equivalent; and in addition, shall have a minimum of five years technical experience in one or more of the areas specified in ANSI N18.7-1976/ANS 3.2. The NSRB shall be composed of at least five members, including the Chairman. Members of the NSRB may be from TVAN, or other TVA organizations or external to TVA. No more than two alternates shall participate as voting members in NSRB activities at any one-time.
a. Functions The NSRB shall, as a minimum, incorporate the following functions:
1. Advise the Chief Nuclear Officer and Executive Vice President, TVA Nuclear, on all matters related to nuclear safety;
2. Recommend to the Chief Nuclear Officer and Executive Vice President, TVA Nuclear, any corrective action to improve nuclear safety and plant operations; and
3. Notify the Chief Nuclear Officer and Executive Vice President, TVA Nuclear, of any safety significant disagreement between the NSRB and the organization or function being reviewed.
b. NSRB Review Responsibilities The NSRB shall be responsible for the review of:
1. The 10 CFR 50.59 Program. 10 CFR 50.59 evaluations will be screened. Review of representative 10 CFR 50.59 evaluations will be performed, selected based on safety significance, for 1) changes to procedures, equipment or systems and 2) tests or experiments completed under the provision of 10 CFR 50.59, to verify that such actions did not require a license amendment;
2. Proposed changes to procedures, equipment, or systems that require a license amendment as defined in 10 CFR 50.59;

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 16 of 113

3. Proposed tests or experiments that require a license amendment as defined in 10 CFR 50.59;
4. Proposed changes to Technical Specifications or the Operating License relating to nuclear safety prior to implementation, except in those cases where the change is identical to a previously reviewed proposed change;
5. Violations of codes, regulations, orders, license requirements, and internal procedures or instructions having nuclear safety significance;
6. Reportable events (10 CFR 50.73);
7. Plant staff performance;
8. Recognized indications of unanticipated deficiencies in any aspect of design or operation of structures, system, or components that could affect nuclear safety;
9. Significant accidental, unplanned, or uncontrolled radioactive releases, including corrective action to prevent recurrence;
10. Significant operating abnormalities or deviations from normal and expected performance of equipment that affect nuclear safety; and
11. Implementation of the corrective action program.
12. The 10 CFR 72.48 Program. 10 CFR 72.48 evaluations will be screened. Review of representative 10 CFR 72.48 evaluations will be performed, selected based on safety significance, for 1) changes to procedures, facility, or spent fuel storage cask design, and 2) tests or experiments completed under the provision of 10 CFR 72.48, to verify that such actions did not require a license amendment;
13. Proposed changes to procedures, facility, or spent fuel storage cask design that require a license amendment as defined in 10 CFR 72.48.
c. Minutes of each NSRB meeting and reports of other reviews shall be forwarded to the Chief Nuclear Officer and Executive Vice President, TVA Nuclear, within 30 days following completion of the meeting or review.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 17 of 113 C. Nuclear Licensing Manager (Corporate)

The Nuclear Licensing Manager is responsible to:

1. Manage the Nuclear Experience Review Program.
2. Maintain an interface between TVA and NRC for licensing activities.

D. Engineering The Engineering organizations are responsible for independent technical reviews. These reviews primarily include:

1. System performance monitoring as required by the Maintenance Rule, 10 CFR 50.65.
2. Technical operability evaluations.
3. Review of technical specification changes that affect the design basis.
4. Review of Final Safety Analysis Report changes that affect the design basis.
5. Self assessments to ensure maintenance of design basis and adequacy of technical programs.

4.1.4 Nuclear Support In addition to the responsibilities described in subsection 4.1.2, the Vice President, Nuclear Support is responsible for maintaining a position qualification documentation and validation program through Nuclear Human Resources. The Vice President, Nuclear Support is also responsible for Nuclear Security which includes protection of safeguard information, reporting of safeguard events, and development and maintenance of the Site Physical Security/Contingency Plans.

A. Nuclear Business Services The General Manager, Nuclear Business Services, is responsible for developing, coordinating, and overseeing a strong business and fiscal management program throughout TVAN including business planning and budgeting. This manager also provides for the monitoring and reporting of TVAN goals and objectives and submits a performance report at least quarterly to the Chief Nuclear Officer and Executive Vice President, TVA Nuclear that provides system performance and status.

B. Nuclear Assurance Nuclear Assurance responsibilities and requirements are contained in Section 4.1.6.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 18 of 113 4.1.5 Nuclear Operations (NO)

A. In addition to the responsibilities described in subsection 4.1.2, the Senior Vice President, NO, is responsible for managing the organization shown in Appendix H and ensuring that the QA requirements established by this Plan are either included or referenced (as appropriate) in related NO-sponsored program areas identified in the body of this Plan. Fire Protection is also a responsibility of the Senior Vice President, NO.

B. Implementing programs at licensed units, ensuring that the QA requirements of this Plan are appropriately established in licensed units Site procedures.

C. The plant technical review process and PORC.

4.1.6 Nuclear Assurance (NA)

A. The General Manager, NA, reports to the Nuclear Support Vice President. The General Manager, NA, has an independent reporting relationship to the Chief Nuclear Officer and Executive Vice President, TVA Nuclear on quality status and issues.

The quality organization has direct access to appropriate levels of management and sufficient independence and organizational freedom to be able to effectively assure conformance to quality assurance program requirements.

The General Manager, NA, administers quality assurance responsibilities through the Quality Assurance Manager (Corporate), Site Quality Managers, BFN Unit 1 Restart NA Manager, and the Evaluation and Analysis Group.

The General Manager, NA, is required to have a bachelor's degree in an engineering or related science, or equivalent related experience. The General Manager, NA, shall have at least 10 years experience in a senior managerial capacity with five years' experience in nuclear quality assurance related activities.

B. The Quality Assurance Manager (Corporate) reports directly to the General Manager, NA, and manages the development and maintenance of TVAN quality assurance programs to ensure compliance with regulations, commitments, and policies, including those Nuclear Assurance programs that govern activities performed by Site Quality organization personnel.

The Quality Assurance Manager manages TVA's review and qualification of suppliers to ensure final acceptance of all "safety-related material" for all nuclear plants to comply with applicable specifications and requirements. The Quality Assurance Manager manages the training programs for NA personnel, and manages the quality audit and vendor audit programs.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 19 of 113 C. The Site Quality Managers report directly to the General Manager, NA, and are responsible for the performance of the quality control and quality assurance functions at the site. The Site Quality Managers provide oversight of day-to-day plant activities important to safety (i.e., the QA organization routinely attends and participates in daily plant work schedule and status meetings to assure they are kept abreast of day-to-day work assignments throughout the plant and that there is adequate QA coverage).

The Site Quality Managers are required to have a bachelor's degree in an engineering or scientific discipline, or equivalent related experience.

They shall have at least nine years experience in plant design, construction, power plant operation or maintenance, including five years experience in QA-related activities.

D. The BFN Unit 1 NA Manager reports directly to the General Manager NA and is responsible for directing and managing the quality verification and NA oversight activities for Unit I restart.

The BFN Unit I NA Manager is required to have a bachelor's degree in an engineering or scientific discipline, or equivalent related experience.

He/she shall have at least nine years experience in plant design, construction, power plant operation or maintenance, including five years experience in QA-related activities.

E. The Evaluation and Analysis Group reports directly to the General Manager, NA, and provides senior assessment leadership and technical expertise to the quality assessment programs. This group manages the assessment programs associated with assessing operations, engineering/technical support, modifications, maintenance, security, chemistry, emergency preparedness, and radiological control programs.

In addition, this group manages assessment programs affiliated with assurance that TVA and contractor activities meet or exceed industry and regulatory standards.

F. Nuclear Assurance is responsible for:

1. Developing and administering the Nuclear Quality Assurance Plan and the NA organization procedures required to ensure that TVA activities provide the required degree of safety and reliability.
2. Providing oversight of TVA activities by auditing, inspecting, assessing and observing the conduct of activities at Corporate and nuclear plant sites to ensure that they provide the required high degree of safety and reliability and are carried out consistent with applicable laws, regulations, regulatory commitments, licenses, and other requirements. The depth and scope of oversight is dependent on the item's or subject's importance to safety and performance history.
3. Directing and managing NSRB support activities.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 20 of 113

4. Stopping work or further processing, delivery, or installation or taking other comparable actions when warranted to control and/or prevent the use of nonconforming materials or continuance of activities adverse to quality at Corporate and nuclear plant sites.
5. Establishing upper-tier QA requirements for QA training and for assessing the implementation and effectiveness of that training.
6. Developing and implementing the vendor audit and services QA program which includes auditing, source inspection, and surveillance of supplier activities. Developing and maintaining the Acceptance Suppliers List (ASL) of approved vendors.
7. Conducting overview of procured engineering services (offsite) including the review of procurement documents for QA requirements utilizing graded approach criteria, in-depth technical and/or performance based auditing, performing preaward surveys, and reviewing contractor QA programs.
8. Planning, conducting, and reporting the results of Corporate and site audits and following-up identified adverse conditions to ensure appropriate corrective action has been taken.
9. Reviewing and/or auditing QA programs of TVA non-nuclear organizations which support nuclear quality-related activities.
10. Developing, reviewing, and maintaining the Nuclear Quality Assurance Plan.
11. Verifying through assessing or other means that QA requirements are contained in applicable Site QA program procedures, and quality-related activities comply with QA program requirements.
12. Developing and implementing the Site quality control inspection program.
13. Implementing inspection activities associated with the ASME Section III Program at BLN (inactive) and assisting the responsible organization at the sites in the performance of ASME Section Xl NDE.
14. Reviewing the ASME IlIl QAM (BLN) - (inactive).
15. Managing development, maintenance, and improvements of site/corporate quality methodologies to evaluate quality programs and technical programs based on observations and trending.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 21 of 113

16. Analyzing technical and quality programs from many sources to develop recommendations for senior management action. This includes oversight and independent analysis of trending results.

Results are provided to senior management. Advising senior management relative to alternative solutions to technical and quality problems to improve the effectiveness and efficiency of implementation techniques.

17. Advising and interfacing with senior site and corporate management on matters pertaining to the assessment program to aid in the identification and resolution of items that could result in enforcement actions, reduction in power generation, or endangering the health and safety of the general public.

The NA organization is shown in Appendix H.

4.1.7 Procurement In addition to the responsibilities described in subsection 4.1.2, the Senior Vice President, Procurement is responsible for ensuring that the QA requirements established by this Plan are either included or referenced (as appropriate) in related Procurement-sponsored program areas identified in the body of this Plan.

4.1.8 Browns Ferry Unit 1 Restart In addition to the responsibilities described in Subsection 4.1.2, the Vice President, Browns Ferry Unit I Restart is responsible for managing the organization and ensuring that the QA requirements established and identified by this Plan are either included or referenced (as appropriate) in related restart sponsored program areas. Engineering, restart integration, cost and project management, maintenance and modifications, licensing, operational readiness, support, and testing are also responsibilities of the Vice President, Browns Ferry Unit 1 Restart. Appendix I provides a matrix of synonymous positions for the Restart Organization verses those specified in the NQA Plan.

5.0 NUCLEAR QA PROGRAM The General Manager, NA, develops this Plan to establish the requirements of the NQAP that encompass the General Management and General Regulatory Requirements in Sections 3.1 and 3.2 of this Plan. The program requirements apply to design, construction, testing, operation, maintenance, repair, replacement, and modification of TVA nuclear facilities.

TVAN and TVA non-nuclear organizations performing activities within the scope of the NQAP shall implement the program through written procedures and instructions.

TVA non-nuclear organizations providing services within the scope of the NQAP through an Intergroup Agreement shall develop QA programs that comply with nuclear requirements. These QA programs shall be assessed and/or audited by NA.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 22 of 113 5.1 Program Scope A. The requirements of the NQAP shall apply to activities associated with structures, systems, and components which are safety-related or controlled by 10 CFR 72, and shall take into account special equipment, environmental conditions, skills, or processes.

B. The requirements shall also apply to TVA identified quality-related programs and features which are important to the continued reliable operation of TVA's nuclear facilities. Organizations responsible for these programs and features shall determine the extent to which these requirements apply and develop and document applicable NQAP elements and the levels of verification required.

Technical requirements related to engineering design are specified by the Chief Engineer. NA shall review or assess these programs and features. The program procedures shall be included in NPS documents.

Programs and features for which the NQAP applies are listed below. Appendix C, "Guidelines for Determination of TVA-identified Quality-Related Classifications,"

was used to develop the list.

1. Radiological Control.
2. Emergency Preparedness.
3. Nuclear Plant Security.
4. Radioactive Material Shipment.
5. Special Nuclear Material Management.
6. Fire Protection.
7. Radwaste Management Systems, Structures, and Components.
8. Seismic Category I (L) Items.
9. Non safety-related Anticipated Transient Without Scram (ATWS)

Equipment.

10. Chemistry.
11. Safety Parameter Display System
12. 10 CFR 72 - NUREG/CR - 6407 Important To Safety Category C Components When using services outside TVAN, responsible organizations for the above programs and features shall specify the extent of applicable QA requirements.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 23 of 113 C. To facilitate proper application and implementation of the NQAP, the Site Vice President (delegated to the Site Engineering and Materials Manager) shall develop a Q-List for each nuclear unit. The Q-List shall document and classify structures, systems, and components consistent with their importance to safety.

5.2 Graded Approach The NQAP shall provide for the graded application and verification of QA requirements to quality-related items and activities.

A. The following criteria are to be considered when applying NQAP requirements:

1. The impact on safety of an item malfunction or failure.
2. The specification, design, fabrication complexity, or uniqueness of the item, and the environment under which the item must function.
3. The need for special controls and assessments of equipment, processes, and operational activities.
4. The degree to which functional compliance can be demonstrated by an inspection or test.
5. The quality history of the item or activity and its degree of standardization.
6. The intended life span during which the item must perform a quality-related function.
7. Requirements of applicable codes and standards.

B. The following factors are to be considered in the degree of QA verification required to ensure implementation of NQAP requirements:

1. New activities not previously performed or implemented.
2. Trend or previous histories of quality problems.
3. Activities critical to safety or having the most potential to impact safety.
4. Revisions of the procedures which have recently been implemented.
5. Activities that have not been assessed in the recent past or are performed infrequently.
6. Activities that are performed by new personnel, contractors, or technicians.
7. The requirements of applicable codes and standards that are mandated for the item or activity.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 24 of 113 5.3 Program Elements This section identifies or references the NQAP elements delineated through the ASME IlIl QAM (inactive) and implemented through TVAN procedures and instructions. The documents identified in Appendix B contain QA requirements applicable to the NOAP elements. The NQAP shall encompass the following elements:

A. Establishment and use of a comprehensive list of safety-related structures, systems, and components for each TVA nuclear plant unit and ISFSI identifying the critical plant features that will receive the highest level of QA program application.

B. Use of a graded approach in the application and verification of NQAP requirements. Quality-related items and activities shall be subjected to a level of QA controls and verification commensurate with their importance to nuclear safety.

C. Assignment of responsibilities to appropriate organizations and positions for implementation of the NQAP.

D. Preparation of NPS documents which provide specific guidance in planning, performing, assessing, and controlling activities affecting quality to ensure that quality-related activities are performed in accordance with applicable national codes and standards, regulatory requirements, licensing commitments, and management requirements.

E. Verification of the adequacy of quality-related structures, systems, and components by appropriate inspections, tests, and assessments; and of quality-affecting activities by periodic reviews, audits, and assessments to ensure the adequacy and effectiveness of the NQAP and its implementation.

F. Provisions for adequate indoctrination and training of personnel, and qualification or certification when required, prior to their performing activities which affect quality.

G. Provisions for special controls, processes, test equipment, tools, and skills necessary to attain the required quality.

H. Measures to control cleanness of facilities, material, and equipment; fire prevention; plant access; and equipment protection. Controls shall be applied to the extent necessary to ensure that only proper materials, equipment, processes, and procedures are utilized, and that the quality of items is not degraded through improper practices and techniques.

I. Prompt identification, documentation, evaluation, and correction of adverse conditions.

J. Generation and retention of adequate records to demonstrate compliance with NQAP requirements, applicable national codes and standards, and regulatory requirements.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 25 of 113 5.4 Program Documents The NOAP shall be documented by written procedures and instructions. The NQAP documents, required by this Plan and the ASME IlIl QAM are contained in the NPS.

Requirements for preparation, review, concurrence, and approval of NQAP documents are contained in NPS documents.

A. ASME IlIl QAM (inactive)

Associated with this Plan is the ASME IlIl QAM. The ASME IlIl QAM is a self-contained manual that prescribes specific QA requirements for the control of items and activities subject to the ASME Code Section III, Division 1. The ASME IlIl QAM satisfies the ASME Section III Code requirement to fully describe both the quality assurance program and the specific responsibilities applied to TVA's activities as an "N" certificate holder. The ASME III QAM is filed with the Authorized Inspection Agency in accordance with the requirements of ASME Code, Section 1II. Changes to the ASME IlIl QAM shall be coordinated with the Authorized Inspection Agency for review and acceptance prior to implementation.

B. Nuclear Quality Assurance Plan This Nuclear Quality Assurance Plan contains regulatory and management QA requirements and responsibilities that other NPS documents must address. This Plan and implementing documents meet the requirements of 10 CFR 50, Appendix A; 10 CFR 50, Appendix B; 10 CFR 72, Subpart G; and applicable ASME Section Xl requirements for a nuclear QA program. To ensure the nuclear program is fully integrated, additional implementing level details contained in requirements documents shall be included in procedures and instructions sponsored by implementing organizations.

C. Implementing Procedures The Nuclear Quality Assurance Plan establishes the quality assurance program requirements. The Nuclear Quality Assurance Plan places responsibilities on identified sponsors to develop specific elements of the quality assurance programs addressing specific requirements of source requirement documents.

Sponsors of NPS documents are required to identify the document as "quality related" if it contains quality assurance program requirements. Corporate NPS documents identified as quality related receive review and concurrence by NA personnel or others knowledgeable of QA requirements.

5.5 Program Changes Changes to the Nuclear Quality Assurance Plan shall be submitted to the NRC in compliance with 10 CFR 50.54 and 10 CFR 50.55.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 26 of 113 6.0 CONTROL OF DOCUMENTS AND RECORDS 6.1 Procedures and Instructions 6.1.1 General The QA program requires that quality-related activities shall be prescribed by documented procedures and instructions appropriate to the circumstances.

Activities shall be accomplished in accordance with these procedures and instructions.

The requirements of this section are applicable to the preparation, review, and approval of procedures and instructions (for example, this plan, NPS documents, ASME Ill QAM, etc.). Requirements for the preparation, review, and approval of drawings are in Section 7.0 of this Plan. Requirements for plant reviews are in Section 9.9 of this Plan.

6.1.2 Program Elements A. Content Procedures and instructions shall:

1. Describe quality-related activities in adequate detail for the intended user, and include quantitative or qualitative acceptance criteria sufficient for determining that the activities have been satisfactorily accomplished.
2. Describe significant interfaces between personnel and organizations that affect, or are affected by, quality-related activities.
3. Include or reference appropriate technical, QA, regulatory, and licensing requirements, including those in design output documents.

B. Review Procedures and instructions shall:

1. Receive a documented review for adequacy by a qualified reviewer other than the preparer.
2. Receive the review and concurrence of affected organizations outside the issuing organization prior to approval, unless concurrence has been established in a higher-level document.
3. Receive a review to ensure proper incorporation of QA requirements. These reviews are by NA personnel or others knowledgeable of QA requirements.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 27 of 113 C. Approval Procedures and instructions shall be approved for release by the sponsoring organization prior to use.

D. Procedural Control Procedures shall be issued for the identification and control of quality-related procedures, instructions, and their changes. The organizations responsible for preparing, reviewing, approving, and issuing procedures, instructions, and changes shall be specified.

E. Review of Operational Phase Procedures Operational phase Site procedures and instructions shall be reviewed to ensure that specific known changes in source documents or changes identified through usage are included as necessary and in a timely manner. The following mechanisms ensure that appropriate procedure reviews are conducted:

1. Plant modification program
2. Resolution of issues identified by NA, NRC, Licensing, and corrective action program
3. Technical specification and FSAR update reviews (including the contractor's dry cask storage system Certificate of Compliance licensing basis documents).
4. Source document program and process for administering Site procedures
5. Testing program F. Change Control
1. Changes to procedures and instructions shall be reviewed and approved prior to their implementation by the same organizations that performed the original review and approval, or by another organization assigned by appropriate management or designated in a controlling procedure or instruction.
2. Changes shall be reviewed by organizations having access to pertinent background information upon which to base their approval and having adequate understanding of the requirements and intent of the original document.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 28 of 113

3. Minor changes, such as inconsequential editorial corrections that do not affect the outcome, results, functions, processes, responsibilities, and requirements of the performance of procedures or instructions, do not require the same review as the original, but shall be reviewed and approved as defined in controlling documents.

6.1.3 Responsibilities A. The Senior Vice President, NO, is responsible for the development of programs to control procedures and instructions. The program elements in Section 6.1.2 and the related source requirements contained within the documents listed in Section 6.1.4 shall be addressed.

B. The General Manager, NA, shall:

1. Perform reviews or assessments of NPS documents that implement the NQAP and,
2. Verify through assessing or other means that reviews are conducted by personnel knowledgeable in QA requirements.

C. TVA organizations that work directly under the TVA NQAP are responsible for:

1. Implementing the requirements of the QA program through written procedures and instructions.
2. Ensuring reviews of NPS documents that implement the NQAP are conducted by personnel knowledgeable of QA requirements.

6.1.4 Source Requirement Documents The applicable source requirement documents and their exceptions are noted in Appendix B of this Plan. These establish mandatory controls which must be addressed in the development of programs for procedures and instructions.

6.2 Document Control 6.2.1 General The QA program requires that for activities affecting quality, measures shall be established to ensure that documents prescribing the activity, including changes, are approved for release by authorized personnel, reviewed for adequacy, and made available to personnel performing the prescribed activity prior to commencing work.

The requirements of this section are applicable to the distribution and control of documents after they have been approved for use.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 29 of 113 6.2.2 Program Elements A. Identification and Distribution

1. The types of documents to be controlled shall be identified.

Appendix G lists types of controlled documents and manuals.

2. Master document indexes shall be established and maintained for identifying all controlled documents and their revision status.
3. The distribution of documents shall be controlled and maintained to assist in preventing the use of obsolete or superseded documents.

B. Controlled Use

1. Quality related activities shall be performed in accordance with approved and controlled instructions, procedures, and drawings.
2. Organizations shall ensure through procedures or instructions that those participating in an activity are made aware of and use proper and current documents.

C. Control of Equipment Technical Information Administrative controls shall provide for control and distribution of equipment technical information (ETI) supplied to TVA.

6.2.3 Responsibilities The Senior Vice President, NO, is responsible for the development of programs to control documents. The program elements in Section 6.2.2 of this section and the related source requirements contained within the documents listed in Section 6.2.4 shall be addressed.

6.2.4 Source Requirement Documents The applicable source requirement documents and their exceptions are noted in Appendix B of this Plan. These establish mandatory controls which must be addressed in the development of programs and procedures for the control of documents.

6.3 QA Records 6.3.1 General The QA program established for the generation, collection, storage, maintenance, and retrieval of QA records requires that records be correctly identified, reviewed, stamped or otherwise authenticated, retained, and retrievable without undue delay.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 30 of 113 6.3.2 Program Elements A. Sufficient records and documentation shall be prepared and maintained to provide evidence of the quality of items or activities affecting quality.

QA records shall be legible, complete, and identifiable to the item involved.

B. Design specifications, procurement documents, procedures, and instructions shall specify the QA records to be generated, supplied, and maintained by or for TVA. Retention times shall be designated. Indexes shall be established to designate those types of QA records to be maintained.

C. Measures shall be established to maintain control of in-process QA documents prior to their completion.

D. Requirements and responsibilities shall be established consistent with applicable codes, standards, and procurement documents for record transmittal, receipt, retention, updating and supplementing of information, and maintenance of the records subsequent to the completion of work and record retrieval.

E. Permanent and temporary QA record storage facilities shall be established to store QA records to prevent infestation, deterioration, or destruction.

F. Measures shall be taken to preclude the entry of unauthorized personnel into QA record storage areas to ensure the integrity of the stored QA records.

G. Records shall be maintained in a manner that will allow access by the Authorized Inspection Agency representative.

6.3.3 Responsibilities The Senior Vice President, NO, is responsible for the development of a QA records program. The program elements in Section 6.3.2 and the related source requirements contained within the documents listed in Section 6.3.4 shall be addressed.

6.3.4 Source Requirement Documents The applicable source requirement documents and their exceptions are noted in Appendix B of this Plan. These establish mandatory controls which must be addressed in the development of programs and procedures for the control of records.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 31 of 113 7.0 DESIGN CONTROL 7.1 General The QA program requires that measures shall be established and documented to ensure that applicable specified design requirements, such as design bases, regulatory requirements, and codes and standards, are correctly translated into specifications, drawings, procedures, or instructions.

7.2 Program Elements 7.2.1 Basic A. Specific items, services, and activities subject to design control shall be identified (e.g., reactor physics analysis, stress and thermal analyses, computer code development and use, computer software, compatibility of materials, drawings, specifications, engineering procedures, and instructions).

B. Design activities shall be documented in sufficient detail to permit verifications and audits.

C. Measures shall be established and implemented to ensure that design output documents appropriately identify engineering requirements that apply to plant activities, and to ensure that plant personnel are made aware of engineering requirements that could affect the performance and scope of their responsibilities before those engineering requirements are implemented.

D. Measures shall be established and implemented to provide test requirements in design output documents for the following tests as appropriate:

1. Design qualification.
2. Product acceptance (proof).
3. Preoperational.
4. Construction.
5. Start-up.
6. Surveillance.
7. Functional.
8. Postmaintenance.
9. Postmodification.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 32 of 113 E. Measures shall be established and implemented to provide documented input to other organizations which may request input for their special tests.

F. Acceptance criteria shall be defined for verifications, inspections, and tests in appropriate design output documents.

G. Design output documents shall be utilized, as appropriate, for procurement activities.

H. The Q-List identified in Section 5.1.C of this Plan shall be developed using appropriate regulations, regulatory guides, and national codes and standards (such as 10 CFR 50, Appendix R; Regulatory Guides 1.26 and 1.29; and ASME Boiler and Pressure Vessel Code).

I. Measures shall be established to ensure the environmental qualification (EQ) of safety-related electrical and mechanical equipment is included, as appropriate, within the design basis.

J. Errors and deficiencies in approved design documents, including design methods (such as described in calculations) that could affect quality-related activities are documented and corrected. (Reference Section 10.0 of this Plan) 7.2.2 Design Inputs A. Design assumptions, design inputs, and deviations from approved design inputs shall be identified, reviewed, approved, and documented prior to declaring the structure, system, or component affected by the design operable.

B. Design inputs shall be correctly translated into design outputs.

C. Provisions shall be made to relate the final design to the source of design input.

7.2.3 Design Analysis A. The performance of design analysis shall be planned and controlled.

B. The suitability of application of materials, parts, equipment, and processes essential to the function of a structure, system, or component shall be reviewed to ensure that functional requirements are met.

7.2.4 Interface Control Internal and external design responsibilities and interface controls shall be established and defined to facilitate the preparation, review, approval, release, distribution, and revision of documents involving design interfaces. This process ensures that quality-related structures, systems, and components are compatible geometrically, functionally, and with plant processes and environments.

7.2.5 Design Output

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 33 of 113 A. Engineering requirements on plant activities (e.g., operation, maintenance, installation, modification, surveillance) shall be identified in design output documents.

B. Measures shall be established and documented to control the preparation, review, approval, issuance, and revision of design output documents. These measures shall include criteria and responsibilities to ensure that adequate technical and quality requirements are incorporated prior to issuance.

C. Drawings and specifications shall include, as appropriate, quantitative and qualitative acceptance criteria. These acceptance criteria shall be sufficient for determining that quality-related activities have been satisfactorily accomplished.

D. Drawings and specifications shall receive documented reviews and approvals (and concurrences as required) by responsible organizations prior to use.

E. After approval, drawings shall be controlled in accordance with the requirements of Sections 6.2 and 6.3 of this Plan.

F. Revisions shall be reviewed and approved by the same organizations that performed the original review unless another appropriate organization that has access to pertinent background information is designated in the appropriate NPS document or procurement documents.

7.2.6 Design Verification A. The translation of design inputs into design documents shall be verified and the verification documented.

B. Criteria for determining design verification methods shall be established, identified, implemented, and procedurally controlled. The responsibilities of the verifier, the areas and features to be verified, and documentation requirements shall be included.

C. Design verification shall be performed by individuals or groups other than those who performed the original design.

D. For nuclear units under a construction permit, design verification shall be complete prior to initial fuel loading.

E. For operating nuclear units, design verification shall be complete prior to reliance upon the component, system, or structure to perform its function.

Design outputs which are released prior to verification being completed shall be identified and tracked to ensure the component, system, or structure is not relied upon to perform its function until the verification is complete.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 34 of 113 F. When a verification test is used to verify the adequacy of a specific design feature in lieu of other verifying processes, the test shall include suitable qualification testing of a prototype unit under conditions that simulate, to the extent practical, the most adverse design condition. The prototype, component, and feature tests are performed as early as possible and prior to plant installation of the equipment or at least prior to the point where installation of the item would be relied upon to perform its function. In those cases where the most adverse design conditions can not be achieved in tests, suitable analysis shall be performed to extrapolate test results to design conditions.

7.2.7 Design Changes A. Design changes, including field changes and modifications, shall be identified. They are subject to design control measures commensurate with or better than those applied to the original design.

B. Design changes shall be reviewed and approved by the organization responsible for the original design unless another appropriate organization that has access to pertinent background information is designated in the appropriate NPS document or procurement documents.

C. Design changes that affect the supply of a quality-related item or service controlled by procurement documents shall not be returned to operation until: (1) the change is reflected in the appropriate change document such as a contract or purchase order change notice, (2) the change document has received the requisite reviews and approvals, and (3) the change document has been submitted to and accepted by the respective supplier.

D. Proposed modifications to quality-related structures, systems, and components shall be reviewed, approved, and controlled in accordance with applicable requirements of the Operating License and Section 9.9 of this Plan.

E. Design modifications shall be at least equivalent to the quality specified in the latest approved design basis.

F. Measures to control plant configuration and ensure that the actual plant configuration is accurately depicted on drawings and other appropriate design output documents and reconciled with the applicable design basis shall be established, documented, and implemented.

G. The design integrity shall be maintained during plant maintenance and modification processes, including temporary changes, and throughout the life of the plant.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 35 of 113 7.3 Responsibilities A. The Chief Engineer is responsible for the development of a design control program. The program elements in Section 7.2 and the related source requirements contained within the documents listed in Section 7.4 shall be addressed.

B. The Vice President, E&TS, is responsible for implementation of programs for maintaining design control at unlicensed units.

C. The Chief Engineer is responsible for implementation of programs for maintaining design control at licensed units and Corporate.

7.4 Source Requirement Documents The applicable source requirement documents and their exceptions are noted in Appendix B of this Plan. These establish mandatory controls which must be addressed in the development of programs and procedures for control of the design process.

8.0 PROCUREMENT AND MATERIAL CONTROL 8.1 Procurement Document Control 8.1.1 General The QA program requires that measures shall be established to ensure that control is applied to documents used to obtain materials, parts, components, spare and replacement parts, and services required to construct, test, modify, maintain, repair, or operate nuclear facilities, commensurate with their importance to safety.

8.1.2 Program Elements A. Procurement Document Planning The procurement process, as documented in TVAN procedures, shall identify each activity in the process, who accomplishes the activity, how, and when the activity is performed. The process shall be planned to integrate the following activities as a minimum:

1. Document preparation, review, and change control.
2. Selection of procurement sources.
3. Bid evaluations and award.
4. Purchaser control of supplier performance.
5. Verification activities of purchaser.
6. Control of nonconformances.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 36 of 113

7. Corrective actions.
8. Acceptance of item or service.
9. QA records.
10. Audit of procurement program.

B. Procurement Document Content In the preparation of procurement documents, responsible organizations shall as applicable:

1. Specify or reference applicable design basis technical requirements as defined by Engineering, such as regulatory requirements (including 10 CFR 50.49 and 10 CFR Part 21 as applicable); QA requirements; material and component identification requirements; drawings; specifications; inspection and test requirements (including acceptance criteria); calibration, handling, storage, packaging, and shipping requirements; and special process instructions. All technical requirements shall be prepared, reviewed, and released under the requirements established by Section 7.0 of this Plan.
2. For commercial-grade replacement items intended for safety-related use, Engineering shall determine critical characteristics and specify inspection and acceptance criteria to ensure that items dedicated after receipt are acceptable for use as replacement parts.
3. As appropriate, require that suppliers have a documented QA program that is approved by TVA and appropriate interfaces established.
4. As appropriate, require that NQAP requirements be imposed on subvendors and subcontractors in sub-tier procurement documents.
5. Identify the documentation to be prepared and/or maintained by the supplier and submitted to TVA for review and approval.
6. Identify records to be retained, maintained, and controlled by the vendor or contractor, and those documents and records that the vendors or contractors shall transfer to TVA prior to installation or use of an item or service as applicable.
7. Include provisions for right of access to the facilities and records of vendors, contractors, and sub-tier vendors and contractors for source surveillances and audits.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 37 of 113

8. Include requirements as defined by Engineering to ensure that suitable spare and replacement materials and components are purchased to the applicable requirements of the NOAP and: (1) specifications and codes equivalent to those specified for the original equipment, or those specifications and codes specified by approved design output; or (2) in cases where the original item or part is found to be commercially "off the shelf or without specifically identified quality assurance requirements, spare and replacement parts may be similarly procured but, at the very least, equivalent performance is ensured; or (3) in those where the QA requirements of the original item cannot be determined, a documented evaluation establishing the requirements and controls is conducted.
9. Include requirements for reporting nonconformances and for approving corrective actions and nonconformance dispositions.

C. Procurement Document Review and Approval The review and approval of procurement documents shall include a documented review to ensure that technical, quality assurance, and administrative requirements are included in procurement documents prior to their use.

D. Procurement Document Change Control Changes in procurement documents shall be subject to the same degree of control as was utilized in the original documents. Changes such as typographical corrections, quantity, or monetary changes do not require a review.

8.1.3 Responsibilities A. The Senior Vice President, Procurement, is responsible for the development of a procurement document control program. The program elements in Section 8.1.2 and the related source requirements contained within the documents listed in Section 8.1.4 shall be addressed.

B. The Senior Vice President, Procurement, is responsible for implementation of programs for maintaining procurement document control.

8.1.4 Source Requirement Documents The applicable source requirement documents and their exceptions are noted in Appendix B of this Plan. These establish mandatory controls which must be addressed in the development of programs and procedures for control of procurement documents.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 38 of 113 8.2 Control of Purchased Material, Equipment, and Services 8.2.1 General The QA program requires that measures shall be established to assure that purchased material, equipment, and services, whether purchased directly or through contractors, conform to the procurement documents.

8.2.2 Program Elements A. Evaluation and Selection of Suppliers

1. Evaluations of prospective suppliers shall be conducted and documented to demonstrate that their qualifications and capabilities are adequate to meet procurement document requirements. Supplier evaluations shall include supplier performance assessments as appropriate.
2. Evaluations and selection of procurement sources shall include, as appropriate, the use of historical quality performance data, source surveys or audits, or source qualification programs.
3. A list of approved suppliers shall be maintained.

B. Bid Evaluation and Award A documented system for reviewing and evaluating bids and correcting bid discrepancies shall be established to ensure suppliers' conformance to procurement document requirements.

C. Effectiveness Assessments

1. The effectiveness of the suppliers' control of quality shall be assessed through periodic audits and/or surveillances utilizing a graded approach consistent with the importance, complexity, and quantity of the items and services procured.
2. The assessments shall consist of, as appropriate, checks, reviews, verifications, examinations, and witnessing of activities related to the fabrication, testing, inspection, and shipment of material, including periodic assessments of suppliers' certificates of conformance.
3. Records, qualifications, and process specifications or procedures shall be documented and verified to be in accordance with contract requirements.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 39 of 113 D. Acceptance of Procured Services Procured services shall be accepted, as appropriate, by:

1. Technical verification of product/data produced.
2. Assessments and/or audit of the activity.
3. Review of objective evidence such as certifications.

E. Acceptance of Procured Items Procured items shall be accepted by receipt inspection and any combination of the following, as appropriate, based on the item's degree of complexity, uniqueness, and safety classification.

1. Source verification.
2. Preinstallation testing inspection.
3. Supplier certificate of conformance.
4. Post installation testing.

F. Receipt Inspection

1. Receipt inspection shall be performed utilizing graded approach criteria to ensure that material and equipment is properly identified to the purchase document and receiving documentation and meets requirements of procurement documents. When graded approach criteria are applied to receipt inspection activities, line verification will be required. The QA organization shall independently verify line organization performance to ensure adequacy of line verifications.
2. Deficiencies, such as damage, shall be documented and resolution of the deficiency shall be in accordance with approved documents.
3. Records, such as inspection and test records, shall be available at the Site prior to installation or use of the material or equipment.

G. Maintaining Disposition of Received Items

1. A quality control method for identifying the status of items (e.g.,

an inventory system, tagging, labeling, color code) shall be employed that indicates whether items received are acceptable or unacceptable for installation.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 40 of 113

2. Items may be installed prior to final disposition of a deficiency.

Nonconforming items shall be controlled in accordance with Section 10.2.1.

8.2.3 Responsibilities A. The Senior Vice President, Procurement, is responsible for the development of programs to control purchased material, equipment, and services. The program elements in Section 8.2.2 and the related source requirements contained within the documents listed in Section 8.2.4 shall be addressed.

B. The Senior Vice President, Procurement, is responsible for implementation of programs for maintaining control of purchased material, equipment, and services.

C. The General Manager, NA, is responsible for evaluation and selection of suppliers, acceptance of procured items, periodic assessments of suppliers utilizing graded approach criteria, and maintenance of an approved suppliers' list.

8.2.4 Source Requirement Documents The applicable source requirement documents and their exceptions are noted in Appendix B of this Plan. These establish mandatory controls which must be addressed in the development of programs and procedures for the control of purchased material, equipment, and services.

8.3 Identification and Control of Materials, Parts, and Components 8.3.1 General The QA program shall ensure that only correct and accepted items are installed and used, and that an item can be related to applicable drawings, specifications, or technical documents at any stage of construction, maintenance, or modification as required.

8.3.2 Program Elements A. Identification Identification of quality-related items shall be verified and documented prior to release for fabrication, assembly, shipping, and installation.

Identification requirements shall be specified in applicable design and procurement documents. Determination of identification requirements shall be based on the item importance to safety, quality, or potential hazards.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 41 of 113 B. Traceability Traceability of materials, parts, or components to specific manufacturing, installation, maintenance, and/or test records shall be provided as required by codes, standards, or specifications; and shall be accomplished through the recording of heat, batch, lot, part, or serial numbers, or other appropriate identification, either on the item or on records traceable to the item.

8.3.3 Responsibilities A. The Senior Vice President, Procurement, is responsible for the development of the material management program for identification and control of materials, parts, and components. The program elements in Section 8.3.2 and the related source requirements contained within the documents listed in Section 8.3.4 shall be addressed.

B. The Senior Vice President, Procurement, is responsible for implementation of programs for maintaining identification and control of materials, parts, and components.

8.3.4 Source Requirement Documents The applicable source requirement documents and their exceptions are noted in Appendix B of this Plan. These establish mandatory controls which must be addressed in the development of programs and procedures for the identification and control of items.

9.0 CONTROL OF PLANT ACTIVITIES 9.1 Inspection and Line Verification 9.1.1 General The QA program requires that inspection and line verification procedures and instructions include provisions for inspections and line verifications to ensure quality.

9.1.2 Program Elements A. Line Verification

1. Line verifications shall be performed and documented to substantiate and ensure that an activity or condition has been implemented and accomplished in conformance with specific requirements.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 42 of 113

2. Requirements for line verification identified by design output documents shall be included in implementing documents.
3. Qualification of personnel performing line verifications shall be contained in procedures and instructions developed by the organization performing the line verification.

B. Inspection Plans and Instructions Inspections shall be controlled by plans or instructions which implement requirements, assign responsibilities, and identify acceptance criteria derived from design output documents as appropriate.

1. Inspections to verify conformance to codes, standards, and design output shall be required for each operation. Factors used to determine the extent of inspections to be performed are listed in Section 5.2 of this Plan.
2. Inspection hold points, witness points, and notification points shall be used as required or needed to verify in-process or final achievement of quality. When graded approach criteria are applied to design/regulatory required inspection activities, line verification will be required. The NA organization shall independently verify line organization performance to ensure adequacy of line verifications.
3. Indirect control by assessment of processing methods, equipment, and personnel shall be specified when direct inspection is impossible or disadvantageous.
4. Instructions for activities such as sampling, assessments, and independent inspections shall be included.
5. Persons responsible for performing sampling, assessments, and independent inspections shall be specified.

C. Inspection Performance Inspections shall be performed by NA or other qualified individuals approved by NA utilizing graded approach criteria in accordance with controlled plans or instructions which specify attributes to be verified in accordance with requirements and acceptance criteria.

1. Inspections shall be performed by individuals delineated above other than those who performed or directly supervised the activity being inspected.
2. Personnel performing inspections shall be trained, qualified, and certified, as required, within their discipline in accordance with established requirements. The requirements criteria shall be approved by NA.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 43 of 113

3. M&TE used to perform inspections shall be controlled, calibrated, and maintained as required in Section 9.5 of this Plan. The identification of M&TE shall be documented.
4. Work shall not proceed beyond designated hold points prior to release by authorized personnel.

D. Results Records of inspection results and personnel performing the inspection shall be retained as required in Section 6.3 of this Plan.

1. Inspection records shall be identified as such and shall be retrievable.
2. Inspection records shall contain a description of the type of inspection, the date performed, inspection or verification of corrective action results, and identification of the inspector and data recorder as well as the person approving the inspection results including the date of approval.
3. Inspection records and/or data sheets shall include a statement attesting to the acceptability of results and provide for identifying the individual who performed the evaluation.
4. Periodic trending of inspection results shall be performed and reported to appropriate management.
5. Records shall be kept in sufficient detail to permit adequate evaluation of inspection activities.

9.1.3 Responsibilities A. The Vice President, E&TS, and the General Manager, NA, are responsible for including the applicable QA program elements in Section 9.1.2 and the related source requirements found in the documents listed in Section 9.1.4, within the inspection program. The General Manager, NA, reviews and approves the inspection program to ensure inclusion of QA requirements.

B. The Vice President, E&TS, and the Senior Vice President, NO, are responsible for including the program elements in Section 9.1.2 and the related source requirements contained within the documents listed in Section 9.1.4, as applicable, within the line verification program.

C. The Chief Engineer is responsible for providing qualitative/quantitative criteria in design output documents which are incorporated in implementing procedures.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 44 of 113 D. The Vice President, E&TS, is responsible for establishing and implementing programs for training and certification of personnel performing QC activities.

9.1.4 Source Requirement Documents The applicable source requirement documents and their exceptions are noted in Appendix B of this Plan. These establish mandatory controls which must be addressed in the development of programs and procedures for inspection.

9.2 Quality Assurance Assessments 9.2.1 General Assessments by NA are performed as a type of verification to ensure that observed quality-related activities are performed in accordance with requirements and desired results are achieved.

9.2.2 Program Elements A. Assessment procedures and instructions shall address assessment techniques.

B. Assessment frequencies shall be based on such factors as the status and safety significance of the activity or process, frequency of occurrence, degree and acceptability of previous experience, adverse trends, and testing or operation sequences.

C. The results of assessments shall be documented and reported to appropriate levels of management.

D. Records shall be maintained in sufficient detail to provide adequate documentation of assessed activities.

E. Follow-up verifications or additional assessments shall be conducted as necessary to ensure that required corrective action has been taken.

F. Assessments shall be performed in accordance with written procedures and instructions by qualified and appropriately trained personnel not having direct responsibility in the areas being assessed.

9.2.3 Responsibilities The General Manager, NA, is responsible for the development and implementation of the QA assessment program.

9.2.4 Source Requirement Documents None applicable.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 45 of 113 9.3 Control of Special Processes 9.3.1 General Those processes, as determined by the Engineering organization, which by their nature make a direct inspection either impossible or disadvantageous are controlled as special processes.

Special processes shall be controlled and accomplished in accordance with approved process control documents by qualified personnel using qualified written procedures.

9.3.2 Program Elements A. Processes which are to be controlled as special processes shall be documented in design output documents and maintained current. These processes shall include, but not be limited to: welding, forming and bending, heat treating, chemical cleaning, protective coatings, and NDE.

B. Measures shall be established, documented, and implemented, as appropriate, using specifications, procedures, and instructions to ensure that special processes are accomplished under controlled conditions and in accordance with applicable codes, standards, specifications, manufacturer instructions, or other special requirements. These measures shall include requirements for procedures, equipment, personnel, specifications, and control of consumable materials.

C. When a special process is not covered by existing codes or standards, or when an item's quality requirements exceed the requirements of existing codes or standards, any special requirements necessary for controlling, implementing, and documenting the special process shall be defined as appropriate.

D. Procedure, Equipment, and Personnel Qualification and Certification

1. Personnel performing special processes shall be qualified and, when required, certified in accordance with the applicable codes, standards, and any special requirements.
2. Qualification or certification of procedures, equipment, and personnel required by codes, standards, or any special requirements shall be performed.
3. Documentation shall be maintained for these qualifications and certifications. M&TE used in special processes shall be controlled in accordance with Section 9.5 of this Plan.

E. Results Results of examinations associated with special processes shall be documented and evaluated for acceptability. Documentation shall provide for identifying the individual who performed the evaluation.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 46 of 113 9.3.3 Responsibilities A. The Chief Engineer is responsible for development of programs for control of special processes. The program elements in Section 9.3.2 and the related source requirements contained within the documents listed in Section 9.3.4 shall be addressed.

B. The Manager, Inspection Services, is responsible for interpretation of NDE results when not achievable at the site level, and development and implementation of NDE methods and procedures. He is also responsible for the qualification or certification of procedures, equipment, and personnel.

C. The General Manager, NA, reviews and approves the inspection program for control of special processes to ensure inclusion of QA requirements.

He is also responsible for the development of upper-tier QA requirements for the NDE program (refer to Section 9.3.2).

D. The Chief Engineer is responsible for coordinating with appropriate organizations and determining which processes are to be controlled as special processes and for developing engineering requirements for NDE.

E. The Vice President, E&TS, and the Senior Vice President, NO, are responsible for the qualification or certification of special process procedures, equipment, and personnel for all areas other than NDE.

9.3.4 Source Requirement Documents The applicable source requirement documents and their exceptions are noted in Appendix B of this Plan. These establish mandatory controls which must be addressed in the development of programs and procedures for the control of special processes.

9.4 Test Control 9.4.1 General The QA program requires that controls shall be established to ensure that required testing is identified and performed in accordance with procedures which incorporate engineering requirements.

9.4.2 Program Elements A. The following types of tests, as a minimum, shall be included:

1. Design qualification tests.
2. Product acceptance (proof) tests prior to installation.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 47 of 113

3. Preoperational tests.
4. Construction tests.
5. Start-up tests.
6. Surveillance tests.
7. Functional tests.
8. Postmaintenance tests.
9. Postmodification tests.
10. Special tests.

B. Test Performance

1. Tests shall be accomplished in accordance with written and approved test procedures which include the requirements and acceptance criteria of technical specifications, drawings, specifications, codes, standards, regulatory requirements, and scoping documents as applicable.
2. Tests performed following plant repairs, replacements, maintenance, or modifications shall be conducted in accordance with the original design and testing requirements or approved documented alternatives. Tests shall be sufficient to confirm that the changes produce expected results and do not reduce safety of operations.
3. Test procedures or instructions include the following, as applicable:
a. Description of test objective.
b. Instructions for performing the test.
c. Test prerequisites such as calibrated instrumentation, adequate test equipment and instrumentation including their accuracy requirements, completeness of the item to be tested, suitable and controlled environmental conditions, provisions for data collection and storage, and qualified personnel.
d. Provisions to assure test prerequisites have been met.
e. Mandatory inspection hold points.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 48 of 113

f. Acceptance or rejection criteria.
g. Methods of recording, documenting, and reviewing test data and results.
h. Provisions for assuring that adverse conditions are corrected, or are evaluated and determined not to adversely impact testing, prior to the initiation of preoperational testing of the affected item.

C. Test Results Test results shall be documented in a suitable test results package that contains:

1. The identification of the item to which it applies.
2. The identification of instructions followed in performing the test.
3. Pertinent inspection and test data.
4. Significant dates and times.
5. Signature of inspector or tester.
6. Conditions encountered which were not anticipated, including identification of deviations or adverse conditions, and actions taken to resolve the condition.

D. Results Evaluation The technical acceptability of the results shall be evaluated by an appropriate authority to ensure that the test requirements have been satisfied.

E. Records of test results shall be retained in accordance with Section 6.3 of this Plan.

9.4.3 Responsibilities A. The Chief Engineer is responsible for the development of test control programs. The program elements in Section 9.4.2 and the related source requirements contained within the documents listed in Section 9.4.4 shall be addressed.

B. The Site Vice President (delegated to the Site Engineering and Materials Manager) is responsible for reviewing test results and specifying through design output documents the acceptance criteria for tests necessary to demonstrate an item's compliance with design parameters for initial acceptance and major modifications.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 49 of 113 C. The Vice President, E&TS, is responsible for the development and conduct of installation tests (construction phase) which incorporate engineering requirements.

D. The Site Vice President (delegated to the Site Engineering and Materials Manager) is responsible for the development of tests (operations phase) which incorporate engineering requirements and for the conduct of tests, including leak tests (operations phase). He is also responsible for documenting, evaluating, and determining acceptability of test results.

E. The General Manager, NA, is responsible for oversight of the test control program (i.e., test performance, test results and acceptability of tests).

9.4.4 Source Requirement Documents The applicable source requirement documents and their exceptions are noted in Appendix B of this Plan. These establish mandatory controls which must be addressed in the development of programs and procedures for the control of tests.

9.5 Control of M&TE and Installed Safety-Related I&C Devices 9.5.1 General Measures shall be established to control equipment which is used to conduct measurements or tests related to determining the functionality or quality of structures, systems, and components within the scope of the QA program.

9.5.2 Program Elements A. Requirements Common to M&TE and Installed Safety-Related I&C Devices

1. Procedures or instructions for administrative controls shall establish:
a. Controls for calibration, selection, identification, and utilization of M&TE and installed safety-related l&C devices.
b. The scope of the various safety-related calibration and control programs.
c. The types of equipment to be controlled.
2. Calibration procedures and instructions, as a minimum, shall include:
a. The identity of the item to be calibrated.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 50 of 113

b. Calibration equipment and reference standards to be used.
c. Checks, tests, measurements, and acceptance tolerances.
d. Sequence of operations.
e. Special instructions when necessary.
f. Recording of performer and applicable procedure or instruction.
9. Recording of as-found and as-left data.
3. Intervals shall be established for calibration and adjustments of M&TE and installed safety-related l&C devices. These intervals shall be based on required accuracy, purpose, degree of usage, stability characteristics, and other conditions which may affect the measurement or output data.
4. An index, listing, or log shall be procedurally maintained; and shall identify each piece of M&TE and installed safety-related l&C device within the calibration program.
5. Reference standards shall be traceable to nationally recognized standards or physical constants. When national standards do not exist, the basis for calibration shall be documented and approved by designated responsible management.
6. Prior to use, M&TE and installed safety-related l&C devices shall be identifiable and traceable to applicable calibration records.

B. Unique Requirements for M&TE Controls for M&TE shall include the following requirements. These requirements are in addition to those noted in Section 9.5.2.A.

1. M&TE shall be stored, calibrated, and used in environments that will not adversely affect its accuracy.
2. M&TE shall be identified to indicate the date of the last calibration, by whom it was calibrated, and when the next calibration is due.
3. Methods shall be established to identify previous usage of M&TE when found to be out of calibration. These methods shall require that inspections or tests be repeated or a documented evaluation be performed when the integrity of past measurements obtained with the suspect equipment or device cannot be demonstrated.
4. Calibration standards, including test stands, that are used as a standard (i.e., multiple M&TE) shall have an accuracy of at least

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 51 of 113 four times the required accuracy of the equipment being calibrated. When this is not possible, standards shall have an accuracy that ensures the equipment being calibrated will be within required tolerances. The basis of acceptance shall be documented and authorized by identified responsible management.

5. M&TE shall be conspicuously labeled, tagged, or otherwise controlled to ensure performance of required calibrations on or before the established due date.
6. M&TE which are consistently found out of calibration shall be identified as nonconforming, removed from service, and repaired or replaced.

C. Unique Requirements for Installed Safety-Related l&C Devices Controls for installed safety-related I&C devices shall include the following requirements. These requirements are in addition to those noted in Section 9.5.2.A.

1. The calibration of installed safety-related I&C devices that provide final measurements data or controls shall be against M&TE that have an accuracy equal to or better than the required accuracy of the devices being calibrated.
2. Installed safety-related l&C devices shall be controlled to ensure performance of required periodic calibrations.
3. Environmental qualification controls for 10 CFR 50.49 installed safety-related I&C devices shall be established in applicable design documents. These controls shall be maintained when installed safety-related I&C devices are opened in place or removed for calibration in a laboratory.
4. Installed safety-related I&C devices which are consistently found to be out of calibration shall be identified and repaired or replaced.

D. Unique Requirements for Installed Compliance I&C Devices Controls for installed compliance l&C devices shall include the following requirements. These requirements are in addition to those noted in Sections 9.5.2.A and 9.5.2.C.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 52 of 113

1. Methods shall be established to identify previous usage of installed compliance l&C devices when found to be out of calibration. These methods shall require that inspections or tests be repeated or a documented evaluation be performed when the integrity of past measurements obtained with the suspect equipment or device cannot be demonstrated.

9.5.3 Responsibilities A. The Senior Vice President, NO, is responsible for the development of controls for M&TE and installed safety related I&C devices. The program elements in Section 9.5.2 and the related source requirements contained within the documents listed in Section 9.5.4 shall be addressed.

B. The Site Vice President (delegated to the Site Engineering and Materials Manager) is responsible for providing qualitative/quantitative criteria in design output documents.

9.5.4 Source Requirement Documents The applicable source requirement documents and their exceptions are noted in Appendix B of this Plan. These establish mandatory controls which must be addressed in the development of programs and procedures for the control of M&TE and installed safety-related l&C devices.

9.6 Handling, Storage, and Shipping 9.6.1 General Measures shall be established such that items, including consumables, under the scope of the QA program are handled, stored, and shipped by qualified individuals in a manner to prevent deterioration, contamination, damage, or loss of identification in accordance with approved engineering and procurement documents.

9.6.2 Program Elements A. Marking Items and/or their containers shall be adequately marked so that the items may be properly identified, maintained, and preserved during shipping, receiving, and storage. Marking shall also indicate the presence of special environments or the need for special controls.

B. Packaging and Cleaning

1. Packaging shall be adequate to provide protection against effects such as corrosion and contamination which would lower the quality of items or cause deterioration beyond specified limits.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 53 of 113

2. Special coverings, special equipment, and special protective environments shall be provided and maintained, as required, by procurement documents and vendor instructions determined to be applicable by the responsible engineer.
3. Cleaning operations shall be performed, as required, prior to coating, packaging, storing, or installing items.

C. Shipping and Handling Special protection required for shipping shall be provided and maintained, as specified, by procurement documents or vendor instructions.

Specified instructions and precautions for handling shall be followed.

D. Storage

1. Methods of controlling stored items, including shelf life, shall be established to minimize the potential for damage or deterioration during storage.
2. Appropriate facilities shall be provided for storage of items requiring special environmental conditions.
3. Periodic assessments of storage areas and stored items shall be performed and documented to verify compliance with storage requirements.
4. Proper maintenance shall be provided for stored items, where necessary to prevent deterioration.

9.6.3 Responsibilities A. The Senior Vice President, Procurement, is responsible for the development of program controls for handling, storing, and shipping. The program elements in Section 9.6.2 and the related source requirements contained within the documents listed in Section 9.6.4 shall be addressed.

B. The Senior Vice President, Procurement, is responsible for implementation of programs for handling, storage, shipping, and issuance of materials.

C. The Vice President, E&TS, is responsible for establishing storage, handling, and shipping requirements and preventive maintenance requirements during storage.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 54 of 113 9.6.4 Source Requirement Documents The applicable source requirement documents and their exceptions are noted in Appendix B of this plan. These establish mandatory controls which must be addressed in the development of programs and procedures for the control of handling, storage, shipping, cleaning, and preservation of items.

9.7 Inspection, Test, and Operating Status 9.7.1 General Measures shall be established and documented to ensure that the operating status is current and the acceptability of items is known throughout fabrication, storage, construction, installation, operation, maintenance, and modification.

9.7.2 Program Elements A. Inspection and Test Status

1. The status of inspections and tests shall be identified either on the items or in documents traceable to the items to ensure that required inspections and tests are performed and to preclude inadvertent bypassing.
2. The status of inspections and tests shall be maintained through the use of indicators such as tags, markings, shop travelers, routing cards, stamps, inspection records, or other suitable means.
3. The authority for application and removal of tags, markings, labels, and stamps shall be specified.
4. Deletions or alterations of required inspections, tests, and other critical operations shall be controlled through appropriate changes to applicable procedures. These changes shall be handled in accordance with Section 6.1.2.F of this Plan.

B. Operating Status

1. The operating status of items (including temporary alterations) shall be indicated by status indicators such as tags on valves and switches to prevent inadvertent operation.
2. Plant instructions that require items to be removed from service for maintenance, testing, or modification shall require designated personnel permission and the completion of the appropriate clearance (hold order or approved plant procedures) before commencement of the activity.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 55 of 113 9.7.3 Responsibilities A. The Senior Vice President, NO is responsible for the development of controls to maintain inspection, test, and operating status. The program elements in Section 9.7.2 and the related source requirements contained within the documents listed in Section 9.7.4 shall be addressed.

B. The Site Vice President (delegated to the Site Engineering and Materials Manager) is responsible for establishing applicable inspection and test acceptance criteria to ensure the acceptability of items is maintained.

C. The Vice President, E&TS is responsible for the implementation of programs for maintaining inspection, test, and operating status at unlicensed units.

D. The Senior Vice President, NO is responsible for implementation of the programs for maintaining inspection, test, and operating status at licensed units.

9.7.4 Source Requirement Documents The applicable source requirement documents and their exceptions are noted in Appendix B of this Plan. These establish mandatory controls which must be addressed in the development of programs and procedures for the control of inspection, test, and operating status.

9.8 Control of Maintenance 9.8.1 General The nuclear maintenance program, including corrective and preventive maintenance, shall ensure that quality-related structures, systems, and components are maintained (including appropriate equipment qualification maintenance) at a level sufficient to perform their intended functions.

9.8.2 Program Elements A. Preventive Maintenance A preventive maintenance program prescribing the frequency and type of maintenance activities to be performed shall be established and maintained.

B. Procedures and Instructions Maintenance shall be carried out in accordance with procedures or instructions to ensure quality at least equivalent to that specified in the approved design basis or approved alternatives. Procedures or instructions shall be written to the level of detail that is normally expected of the user group. Training, experience, and the technical complexity of the work are factors which should be considered in determining the level of detail the procedure or instruction should contain. Guidelines shall be established for the use of these procedures or instructions.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 56 of 113 C. Maintenance Preplanning Maintenance shall be preplanned to include as appropriate:

1. Review of work-initiating documents to ensure quality requirements have been addressed.
2. Evaluation of the use of special processes, equipment, and materials including potential hazards to personnel and equipment and ALARA considerations.
3. The potential for common-mode failures when working on similar multiple or redundant systems and components.
4. Documented approval by designated personnel to release equipment or systems for maintenance.
5. Inspection and testing, as appropriate, to ensure a suitable level of confidence. This includes postmaintenance testing commensurate with the maintenance performed to ensure that the equipment is capable of being returned to service, that the original deficiency (if any exists) has been corrected, and that no new deficiency has been created.

D. Malfunctions The cause of malfunctions shall be evaluated and documented in accordance with TVA's nuclear corrective action program.

E. Trending The Maintenance Program shall establish the parameters for trending maintenance activities and describe the methods for evaluating and documenting adverse trends.

9.8.3 Responsibilities A. The Senior Vice President, NO is responsible for the development of the nuclear maintenance program. The program elements in Section 9.8.2 and the related source requirements contained within the documents listed in Section 9.8.4 shall be addressed.

B. The Vice President, E&TS is responsible for the implementation of the nuclear maintenance program during construction phase activities.

C. The Senior Vice President, NO is responsible for the implementation of the nuclear maintenance program during operations phase activities.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 57 of 113 9.8.4 Source Requirement Documents The applicable source requirement documents and their exceptions are noted in Appendix B of this Plan. These establish mandatory controls which must be addressed in the development of programs and procedures for the Nuclear Maintenance Program.

9.9 Plant Reviews 9.9.1 General The plant staff organization provides reviews of day-to-day activities to ensure they are conducted in a safe manner. Qualified Reviewers provide for reviews of procedures, procedure changes, and proposed changes to structures, systems, and components that affect nuclear safety in their area of expertise.

The PORC is a multidisciplined committee responsible for providing an oversight review of documents required for the safe operation of the plant. PORC advises the Plant Manager on matters related to nuclear safety.

9.9.2 Plant Reviews A. Activities which affect nuclear safety shall be conducted as follows:

1. Proposed changes or modifications to plant nuclear safety-related structures, systems, and components shall be reviewed in accordance with approved written procedures. Such modifications shall be reviewed by an individual/group other than the individual/group which designed the modification, but who may be from the same organization as the individual/group which designed the modification. Proposed modifications to plant nuclear safety-related structures, systems, and components shall be approved by the Plant Manager, or designee, prior to implementation.
2. Written procedures shall be established, implemented, and maintained covering the following activities:
a. The applicable procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978 and in accordance with Appendix B of this Plan;
b. The emergency operating procedures which implement NUREG-0737 and NUREG-0737, Supplement 1, as stated in Generic Letter 82-33;
c. Security Plan implementation;
d. Radiological Emergency Plan Implementation;

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 58 of 113

e. Offsite Dose Calculation Manual implementation;
f. Fire Protection Program Implementation;
9. Radiation Protection Program;
h. Process Control Program Implementation (radwaste packaging and shipping);
i. In-Plant Radiation Monitoring;
j. Quality Assurance Program for effluent and environmental monitoring, using the guidance contained in Regulatory Guide 4.15, December 1977, or Regulatory Guide 1.21, Revision 1, 1974 and Regulatory Guide 4.1, Revision 1, 1975; and
k. ISFSI activities as required by 10 CFR 72 .
3. Procedures required by Section 9.9.2.A.2, procedures and programs required by site-specific technical specifications, other procedures which affect plant nuclear safety, and changes (other than editorial or typographical changes) thereto, shall be prepared and reviewed in accordance with approved administrative procedures prior to implementation except as specified in Section 9.9.2.A.6.

Procedures or procedure changes shall be reviewed by a qualified individual knowledgeable in the subject matter other than the preparer. The reviewer may be from the same or different organization. Procedures not reviewed by PORC shall be approved by the responsible management in accordance with established program requirements. Procedures reviewed by PORC shall be approved by the Plant Manager, or designee.

4. Qualified Reviewers responsible for reviews performed in accordance with Section 9.9.2.A.3 shall be designated and qualified. Qualifications of qualified reviewers shall be as specified in written procedures. Such reviews shall include a determination of whether additional cross-disciplinary review is necessary. If deemed necessary, such review shall be performed by review personnel of the appropriate discipline.
5. Procedures and intent changes to these procedures within the scope of 10 CFR 50.59 or 10 CFR 72.48 shall be reviewed to determine whether a license amendment is required.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 59 of 113

6. Temporarily approved changes to procedures of Section 9.9.2.A.2 shall be made in accordance with ANSI N18.7-1976/ANS 3.2, as modified in Appendix B of this Plan. Such changes shall be documented, reviewed, and approved in accordance with Sections 9.9.2.A.3 and 9.9.2.A.4 within 14 days and in accordance with approved administrative procedures.

B. Plant Operations Review Committee (PORC)

Each plant shall have a PORC which shall function to advise the Plant Manager in matters related to nuclear safety. This advisory function shall be performed by the PORC acting in a formal meeting periodically and as situations demand. PORC shall be organized and shall conduct business as described below. The Chairman and members shall be appointed in writing by the Plant Manager. PORC members shall meet the experience requirements of ANSI N18.1-1971 and ANSI/ANS 3.1-1981 as endorsed by Regulatory Guide 1.8, Revision 2, April 1987, "Qualification and Training of Personnel for Nuclear Power Plants," as outlined in Appendix B of this plan. This applies to the correlated ANSI N18.1-1971 and ANSI/ANS 3.1-1981 Manager or Supervisor position for the represented organization. (Operations representatives who hold or who have held SRO licenses at the station are considered qualified.)

1. Composition The composition of PORC shall be as follows:

Chairman: Operations Manager Member: Operations representative(s)

Member: Maintenance and Modifications representative(s)

Member: Radiological and Chemistry Control (RADCHEM) representative(s)

Member: Engineering representative(s)

2. Alternates Alternate chairmen and members shall be appointed in writing by the Plant Manager.
3. Meeting Frequency The PORC shall meet at least once per calendar month and as convened by the PORC Chairman or designated alternate.
4. Quorum The PORC shall consist of the Chairman or designated alternate and three of the four functional area representatives.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 60 of 113

5. Reporting The PORC reports to the Plant Manager on its activities and findings. The meeting minutes shall serve as the official correspondence from PORC to the Plant Manager. PORC recommendations shall be recorded in the minutes and submitted to the Plant Manager.
6. Functions
a. Advise the Plant Manager on matters related to nuclear safety;
b. Recommend to the Plant Manager approval or disapproval of items considered under Section 9.9.2.B.7; and
c. Provide written notification to the Site Vice President and the NSRB of safety-significant disagreements between the PORC and the Plant Manager within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The Plant Manager shall have responsibility for resolution of such disagreements.
7. Responsibilities The PORC shall be used to conduct, as a minimum, reviews of the following. The PORC may delegate the performance of reviews, but shall maintain cognizance over and responsibility for them, e.g., subcommittees.
a. The applicable administrative procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978;
b. The emergency operating procedures which implement NUREG-0737 and NUREG-0737, Supplement 1, as stated in Generic Letter 82-33;
c. Physical Security Plan;
d. Radiological Emergency Plan;
e. Offsite Dose Calculation Manual;
f. Process Control Program (radwaste packaging and shipping);
9. Additional PORC reviews specifically required by site-specific technical specifications or the plant's licensing basis;

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 61 of 113

h. Proposed changes to TS; Technical Requirements Manual; their bases; amendments to the Operating License; and
i. Selected 10 CFR 50.59 evaluations.
j. Selected 10 CFR 72.48 evaluations.

9.9.3 Records The PORC shall maintain written minutes of PORC meetings that, at a minimum, document the results of its activities. Copies shall be provided to the Site Vice President. At a minimum, the PORC minutes shall include results of the activities conducted under the provisions of Section 9.9.

10.0 ADVERSE CONDITIONS 10.1 General Measures shall be established to ensure that items that do not conform to requirements are controlled to prevent their inadvertent installation or use. Adverse conditions, including nonconforming items or nonhardware problems such as failure to comply with operating license, technical specifications, or procedures, shall be identified, evaluated, corrected, tracked, trended, and when required, reported to appropriate levels of management. Procedures or instructions implementing the corrective action program shall establish the criteria for documenting and tracking adverse conditions.

10.2 Program Elements 10.2.1 Control of Nonconforming Items A. Organizations responsible for items determined to be nonconforming during receipt inspection, construction, maintenance, modifications, or operations shall identify (physical identification) and segregate the nonconforming items from acceptable items to prevent further processing, delivery, installation, or inadvertent use. When segregation is not practical, tagging, marking, or other means of identification is acceptable.

B. In cases where a nonconforming item is needed for use prior to correcting the nonconformance, a conditional release request document is required. The conditional release request document requires appropriate reviews and approvals. In addition, for equipment to be energized, operated, or pressurized an evaluation and justification is required.

10.2.2 Corrective Action For Adverse Conditions A. TVAN organizations and onsite non-TVAN service organizations performing quality-related activities at nuclear facilities shall promptly identify and resolve adverse conditions.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 62 of 113 B. Minor deficiencies which may be brought into compliance within an acceptable timeframe shall be corrected on the spot in accordance with established instructions.

C. Adverse conditions shall be dispositioned by organizations with defined responsibility and authority and shall be corrected in accordance with documented plans.

D. Disposition actions for nonconforming items may be accept-as-is, repair, rework, scrap, or return to vendor. Dispositions of accept-as-is or repair shall be reviewed and approved by Corporate or Site Engineering or, for nuclear fuel-related items, Nuclear Fuels. Reworked or repaired, and replaced items shall satisfy the original inspection and test requirements or acceptable alternatives.

E. The cause of significant adverse conditions shall be determined and corrective action taken to preclude recurrence.

F. Significant adverse conditions shall be reported to appropriate levels of management.

G. The satisfactory completion of corrective actions shall be verified and documented by the appropriate organization.

H. Independent verification of corrective action implementation is performed as specified within the corrective action program.

10.2.3 Escalation of Adverse Conditions Commensurate with their importance to quality or safety, adverse conditions which are not being effectively or timely resolved shall be escalated to appropriate levels of management in a timely manner.

10.2.4 Tracking Procedures describing the corrective action program shall establish the requirements for those adverse conditions which shall be tracked.

10.2.5 QA Trending Trend analysis shall be performed on adverse conditions and quality indicators associated with QA verification activities. Trend results shall be used to advise management of the quality status, identify adverse trends that need increased management attention, and compare quality of performance among organizations. The trend analysis program shall be described in procedures or instructions and shall include the following items as a minimum.

A. Identify the quality indicators associated with QA verification activities to be trended.

B. Specify the process of data handling such as gathering, collecting, sorting, grouping, and coding.

C. Specify the process to be used in analyzing data and trend determination.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 63 of 113 D. Describe the actions to be taken when an adverse trend is identified.

E. Describe the type, distribution, and frequency of issue of trend results reporting.

10.2.6 Stop Work Work shall be stopped under any of the following conditions:

A. Work is proceeding in violation of approved and controlling documents.

B. A condition which clearly indicates that cessation of an activity is the only means available to protect the health and safety of the public and/or plant personnel.

C. An activity, which if continued, will require extensive rework or repair for corrective action.

D. An activity, which if continued, may jeopardize nuclear safety.

E. A condition that represents continual failure to comply with technical or administrative controls.

10.3 Responsibilities A. The Senior Vice President, NO, is responsible for the development of the corrective action program. The program elements in Section 10.2 and the related source requirements contained within the documents listed in Section 10.4 shall be addressed. The General Manager, NA, reviews and approves the corrective action program.

B. Line managers are responsible to stop any work within their areas of responsibility when a continuation of activities could meet the criteria of Section 10.2.6.

C. NA is responsible to issue a formal Stop Work Order, as required, if a line manager fails to act on a stop work condition. Stop Work Orders shall remain in effect until proper evaluation can be made and adequate corrective action can be applied.

D. The Senior Vice President, NO, is responsible to establish and maintain trend analysis procedures for adverse conditions and the quality indicators generated by QA verification activities such as audits, assessments, inspection, and vendor audits and surveillances. The General Manager, NA, is responsible for oversight and independent analysis of trending.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 64 of 113 10.4 Source Requirement Documents The applicable source requirement documents and their exceptions are noted in Appendix B of this Plan. These establish mandatory controls which must be addressed in the development of programs and procedures for the corrective action program.

11.0 INDOCTRINATION, TRAINING, QUALIFICATION, AND CERTIFICATION 11.1 General Personnel performing quality-related activities shall receive indoctrination and training, as necessary, to ensure that adequate proficiency is achieved and maintained.

11.2 Program Elements 11.2.1 Indoctrination and Training A. Personnel performing quality-related activities shall receive training related to administrative controls and the purpose, scope, and implementation of the NQAP.

B. For personnel performing quality-related activities, proficiency shall be maintained and demonstrated through activities such as annual performance evaluation, retraining, reexamining, or recertifying.

C. Training of employees performing quality-related activities shall be conducted, as appropriate, when new programs or procedures affect the scope of their work and whenever changes in their duties or responsibilities occur.

D. The scope, method, and objectives of formal training for quality-related activities shall be documented.

E. Records documenting the date, attendance, content, instructor, and duration of training sessions shall be prepared and maintained to demonstrate individual qualification and training program implementation for employees performing quality-related activities.

11.2.2 Qualification and Certification Qualification and certification programs shall be established and maintained to include the following:

A. Certification of personnel, as needed, to perform inspections, tests, examinations, special processes, or lead audits prior to performance of the activity. Certifications shall delineate the functions personnel are qualified to perform and the criteria used for qualification.

B. Personnel qualification criteria for applicable inspection, test, or examination techniques, audits, special processes, and capabilities necessary to perform the activity safely and in compliance with applicable requirements.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 65 of 113 C. A method to assess the performance of certified individuals and the qualifications of employees performing quality-related activities, to determine their initial and continued acceptability for performing their duties and to provide an assessment of the current level of qualification and certification.

D. Development and maintenance of qualification and certification records and documents in accordance with applicable commitments and regulatory requirements.

11.3 Responsibilities A. The Senior Vice President, NO is responsible for the development of the program for indoctrination and training.

B. Other TVAN Vice Presidents are responsible for delineating training requirements in their applicable areas of responsibility and providing these requirements to the Senior Vice President, NO.

C. The Vice President, Nuclear Support, through Nuclear Human Resources, is responsible for establishing a position qualification documentation and validation program.

D. Vice Presidents and General Managers are responsible for implementing the indoctrination and training program and, as appropriate, developing a certification program and implementing the certification requirements in their area of responsibility.

E. The program elements in Section 11.2 and the related source requirements contained within the documents listed in Section 11.4 shall be addressed in the development and implementation of indoctrination, training, qualification, and certification activities.

11.4 Source Requirement Documents The applicable source requirement documents and their exceptions are noted in Appendix B of this Plan. These establish mandatory controls which must be addressed in the development of programs and procedures for the indoctrination, training, qualification, and certification program.

12.0 AUDITING 12.1 General Measures shall be established to implement a comprehensive audit program which consists of internal audits, including TVAN and other TVA organizations, which support the nuclear program and contractor/supplier audits to determine and assess the adequacy and effectiveness of the QA program.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 66 of 113 12.2 Program Elements A. An audit plan shall be prepared identifying the audits to be performed and their frequencies and schedule.

B. Audits shall include: a determination of the effectiveness of QA program elements; evaluation of work areas, activities, processes, and items; review of documents and records; review of audit results with responsible management; follow-up on corrective action taken for deviations identified during the audit; and escalation to appropriate senior management of any safety significant disagreement between the auditing organization and the organization or function being audited.

C. Audits shall be performed in accordance with written procedures or checklists by qualified, certified, and appropriately trained personnel not having direct responsibilities in the areas being audited.

D. Audited organizations shall provide access to facilities, documents, and personnel needed to perform the audits. They shall take necessary action to correct deviations identified by the audit in a timely manner.

E. Internal Audits

1. The scope of an audit shall be determined by considering such factors as work areas, activities, processes, or items and the specific organizations involved.
2. The auditing organizations shall ensure that audit procedures and instructions adequately cover applicable elements of the NQAP.
3. Audits of Design and Construction Phase units and the Fitness for Duty Program are in accordance with the Code of Federal Regulations.
4. Audits of operational phase units shall be performed with oversight by the NSRB. Except as noted in f, g, h, m, and n below, audit frequencies shall be biennially. These audits shall encompass:
a. The conformance to provisions contained within the Technical Specifications and applicable license conditions.
b. The performance, training and qualifications of the plant staff.
c. The results of actions taken to correct deficiencies occurring in site equipment, structures, systems, components, or method of operation that affect nuclear safety.
d. The performance of activities required by the Nuclear Quality Assurance Program to meet the criteria of Appendix B, 10 CFR Part 50 and 10 CFR Part 72, Subpart G.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 67 of 113

e. Any other activities and documents considered appropriate by the NSRB or the Chief Nuclear Officer and Executive Vice President, TVA Nuclear.
f. The fire protection programmatic controls including the implementing procedures at least once per 24 months.
9. An independent fire protection and loss prevention program inspection and audit shall be performed at a maximum interval of 24 months utilizing either qualified offsite license personnel or an outside fire protection firm.
h. An inspection and audit of the fire protection and loss prevention program shall be performed by an outside qualified fire consultant at intervals no greater than three years.
i. The Radiological Environmental Monitoring program and the results thereof.
j. The performance of activities required by the Nuclear Quality Assurance Program to meet the criteria of Regulatory Guide 4.15, December 1977, or Regulatory Guide 1.21, Rev. 1,1974, and Regulatory Guide 4.1, 1975.
k. The Offsite Dose Calculation Manual and implementing procedures.

I. The Process Control Program and implementing procedures for solidification of wet radioactive wastes.

m. The site Radiological Emergency Plan and implementing procedures in accordance with the Code of Federal Regulations.
n. The site Physical Security/Contingency Plan and implementing procedures in accordance with the Code of Federal Regulations.
5. Audit reports, including recommendations to the management of the organization being audited, shall be maintained.

F. Contractor/Supplier Audits

1. Audits of selected suppliers shall be conducted to verify implementation and adequacy of specified QA requirements.
2. Contractors/suppliers to be audited shall be selected on the basis of the importance of their products or services to safety, status of contract activity, historical performance of the supplier, and potential QA problems that may be discovered during source surveillance inspection activities or earlier audits.
3. Audit schedules shall be prepared and audits shall be conducted in accordance with the schedules.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 68 of 113

4. Audit reports shall be prepared and reviewed by the audit team, approved by management, and transmitted to the supplier and appropriate management within TVA.

12.3 Responsibilities A. The General Manager, NA, is responsible for the development of the audit program. The program elements in Section 12.2 and the related source requirements contained within the documents listed in Section 12.4 shall be addressed.

B. NA is responsible to conduct audits, including audits of selected suppliers, to verify implementation and adequacy of specified QA requirements.

12.4 Source Requirement Documents The applicable source requirement documents and their exceptions are noted in Appendix B of this Plan. These establish mandatory controls which must be addressed in the development of programs and procedures for the control of audits.

13.0 COMPUTER SOFTWARE AND DATA 13.1 General The program elements in Section 13.2 of this Plan apply to application software meeting the criteria of Appendix E of this Plan, whether procured or developed at TVA. The controls established shall be commensurate with the importance of the application software to nuclear safety.

13.2 Program Elements A. Controls shall be established for the development of application software and associated documentation, including requirements specification, design specifications, coding conventions, and user documentation.

B. Controls shall be established for changes to application software and associated software documentation.

C. Software documentation shall be controlled in accordance with Section 6.2 of this Plan.

D. Software documentation specified as QA records shall be controlled in accordance with Section 6.3 of this Plan.

E. Documentation shall be provided for application software describing the correct usage.

F. A central list of application software which meets the criteria of Appendix E of this Plan, with appropriate levels of classification shall be established and maintained.

Involved personnel shall be trained on the intent and purpose of the list.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 69 of 113 G. Prior to implementation, application software shall be verified to demonstrate that the system requirements are satisfied in the system design, implemented in the computer code, validated through documented tests, and the test results independently reviewed.

H. Controls shall be established to verify the accuracy and integrity of data input into automated computer databases.

I. For currently active application software developed or purchased prior to October 16, 1986, only the requirements of Section 13.2.B, E, and F apply. In addition, this application software shall be validated through documented tests and test results independently reviewed.

13.3 Responsibilities The Chief Engineer is responsible for the development of controls for computer software and data. The program elements in Section 13.2 and the criteria of Appendix E of this Plan shall be addressed.

13.4 Source Requirement Documents The applicable source requirements documents and their exceptions are noted in Appendix B of this Plan. These establish mandatory controls which must be addressed in the development of programs and procedures for the control of computer software and data.

14.0 REFERENCES

14.1 Regulations 10 CFR 20, "Standards for Protection Against Radiation."

10 CFR 21, "Reporting of Defects and Noncompliance."

10 CFR 50, "Domestic Licensing of Production and Utilization Facilities."

10 CFR 50.49, "Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants."

10 CFR 50.54, "Conditions of Licenses."

10 CFR 50.55, "Conditions of Construction Permits."

10 CFR 50.55a, "Codes and Standards."

10 CFR 50.55(e), "Conditions of Construction Permits."

10 CFR 50.59, "Changes, Tests, and Experiments."

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 70 of 113 10 CFR 50, Appendix A, "General Design Criteria for Nuclear Power Plants."

10 CFR 50, Appendix B, "Quality Assurance Requirements for Nuclear Power Plants and Fuel Reprocessing Plants."

10 CFR 50, Appendix R, "Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979."

10 CFR 50.62, "Requirements for Reduction of Risk From Anticipated Transients Without Scram (ATWS) Events for Light-Water-Cooled Nuclear Power Plants."

10 CFR 50.72, "Immediate Notification Requirements for Operating Nuclear Power Reactors."

10 CFR 50.73, "Licensee Event Report System."

10 CFR 50.120, "Training and Qualification of Nuclear Power Plant Personnel."

10 CFR 55, "Operators' Licenses."

10 CFR 70, "Domestic Licensing of Special Nuclear Material."

10 CFR 71, Subpart H, "Quality Assurance (Packaging and Transportation of Radioactive Material)."

10 CFR 72, Subpart F, 'General Design Criteria."

10 CFR 72, Subpart G, "Quality Assurance (Licensing Requirements for the Independent Storage of Spent Nuclear Fuel and High-Level Radioactive Waste)."

10 CFR 72, Subpart K, 'General License for Storage of Spent Fuel at Power Reactor Sites."

10 CFR 72, Subpart I, "Training and Certification of Personnel."

10 CFR 72.48, "Changes, Tests, and Experiments. "

10 CFR 73.55, " Requirements for Physical Protection of Licensed Activities in Nuclear Power Reactors Against Radiological Sabotage."

10 CFR 73.71, "Reporting of Safeguards Events."

10 CFR 74, "Material Control and Accounting of Special Nuclear Material."

10 CFR 75, "Safeguards on Nuclear Material - Implementation of US/IAEA Agreement."

10 CFR 100, "Reactor Site Criteria."

14.2 Regulatory Guidance Refer to listing in Appendixes B and C of this Plan.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 71 of 113 14.3 TVA Licensing Submittal Documents Browns Ferry Nuclear Plant Technical Specifications, Administrative Controls Section.

Sequoyah Nuclear Plant Technical Specifications, Administrative Controls Section.

Watts Bar Nuclear Plant Technical Specifications, Administrative Controls Section.

14.4 QA Manuals ASME Section III Quality Assurance Manual (ASME IlIl QAM)-(inactive).

14.5 Other INPO 84-010, 'Vendor Equipment Technical Information Program (VETIP)," March 1984.

NRC Certificate of Compliance for the Holtec International HI-STORM 100 Cask System, Docket No. 72-1014.

NRC letter from H. J. Thompson, Jr., dated April 16, 1985, "Quality Assurance Guidance for ATWS Equipment That Is Not Safety Related," Generic Letter 85-06 (A02 850422 044).

NRC letter from D. G. Eisenhut dated April 24, 1986, "Implementation of Fire Protection Requirements," Generic Letter 86-10 (A02 860512 005).

NUREG 0800, Section 9.5.1, Branch Technical Position, CMEB 9.5-1 (formerly BTP ASB 9.5-1), Rev. 2, July 1981, "Fire Protection for Nuclear Power Plants."

Appendix A to Branch Technical Positions APCSB 9.5-1, August 23, 1976.

15.0 DEFINITIONS The terms and definitions identified in this section are important in order to have a consistent understanding of requirements of the NQAP. Regulatory Guide 1.74, which endorses ANSI N45.2.10, contains terms and definitions applicable to the nuclear industry. This section identifies acceptable alternatives to these definitions with an asterisk(*).

Adverse Conditions Deficiencies including nonconforming material, parts, or components; failures; malfunctions; deviations; hardware problems involving noncompliance with licensing commitments, specifications, or drawing requirements; abnormal occurrences; and nonhardware problems such as failure to comply with the operating license, technical specifications, licensing commitments, procedures, instructions, or regulations.

Assessment An evaluation of the adequacy and effectiveness of quality programs, processes, ongoing tasks or activities, or management controls to identify opportunities for improvement, performance problems, or verify resolution of problems.

  • Audit

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 72 of 113 A documented activity performed in accordance with written procedures or checklists to verify, by examination and evaluation of objective evidence, that applicable elements of the NQAP have been developed, documented, and effectively implemented in accordance with specified requirements. An audit should not be confused with assessment or inspection for the sole purpose of process control or product acceptance.

Basic Component Refer to 10 CFR 21 for definition of basic component.

Commercial-Grade Items Refer to 10 CFR 21 for definition of commercial grade items.

Construction Tests Those tests which are performed on safety-related and other plant components and systems on nuclear units which may satisfy prerequisites to the preoperational test program. Construction tests include pressure and other integrity tests; component and piping system cleaning and flushing; and equipment checkout, initial operation, and adjustments.

Corrective Action The action taken to correct an adverse condition. Corrective action includes interim measures and corrective and preventive actions.

Dedication Refer to 10 CFR 21 for definition of dedication.

Emergency Preparedness A program which ensures the preparation and implementation of plans and procedures to provide, in the event of an emergency, protective measures for health and safety of TVA personnel and the public.

Environmental Protection A program that provides controls, mainly in association with Environmental Protection Agency (EPA) requirements, for nonradiological environmental monitoring and compliance activities. These include hazardous and nonradiological waste material (solid, liquid, and gas) which could be released to the environment.

Features Refers to either individual structures, systems, and components specifically called out by the scope of this Plan (such as seismic Category 1 [L] items) or structures, systems, and components that may be integral to, or associated with, the programs identified in Section 5.13.B of this Plan.

Fire Protection

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 73 of 113 A program that provides controls necessary for the protection of the life and health of TVA plant personnel and the public, to limit damage of property, and to minimize loss of generating capacity resulting from fire or explosion.

Functional Test The manual operation or initiation of a system, subsystem, or component to verify that it functions within design tolerances (e.g., the manual start of a core spray pump to verify that it runs and that it pumps the required volume of water.)

Graded Approach A methodology of applying a grading criteria based on an item's impact on safety, quality history, and other factors such that determination can be made as to the type and degree of QA program requirements which need to be applied. Refer to Section 5.2.

Handling The act of physically moving items by hand or by mechanical means but not including transport modes.

Hold Point A designated stopping place during or following a specific activity at which inspection or examination is required before further work can be performed.

Important to Safety (10 CFR 72)

A system, structure, or component condition/function required to store spent nuclear fuel safely; to prevent damage to spent nuclear fuel or high-level waste container during handling and storage, and to provide reasonable assurance that spent nuclear fuel can be received, handled, packaged, stored and retrieved without undue risk to the health and safety of the public.

Independent Offsite Safety Review Safety reviews performed by the Nuclear Safety Review Board (NSRB) which provide additional assurance that TVA licensed nuclear plants are operating without undue risk to the health and safety of plant personnel and the public.

Independent Spent Fuel Storage Installation (ISFSI )

A complex designed and constructed for the interim storage of spent nuclear fuel and other radioactive materials associated with spent fuel storage. (Refer to 10 CFR 72.3). It is comprised of the Facility, Storage Units, and Ancillary Equipment. An ISFSI that is located on the site of another facility licensed under 10CFR Part 72 or a facility licensed under IOCFR Part 50 (e.g., an operating nuclear power plant) and that shares common utilities and services with such a facility or is physically connected with such other facilities may still be independent.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 74 of 113

  • Inspection A phase of quality control performed by certified inspection personnel or other qualified individuals approved by NA that, by means of examination, observation, and/or measurement determines the conformance of materials, supplies, components, parts, appurtenances, systems, processes, or structures to predetermined quality requirements.

Installed Compliance Instrumentation and Control (I&C) Devices Process instruments which are used to determine or verify compliance with plant technical specification requirements for parameters such as flows, pressures, temperatures, levels, voltages, and currents.

Item Any level of unit assembly, including structure, system, subsystem, subassembly, component, part, or material.

Line Verification A routine verification by a qualified individual who is in the work-performing organization who did not perform or directly supervise the activity to be verified. Examples: second-party verification where a participating craftsman verifies that work and/or testing has been accomplished.

Measuring and Test Equipment (M&TE)

Equipment or devices used to calibrate, measure, gauge, examine, compare, test, inspect, monitor, or control in order to acquire data to determine compliance with design, specification, licensing, or other established requirements. M&TE includes both laboratory and portable instruments, gauges, tools, fixtures, test or analytical test stands, reference and transfer standards, nondestructive examination equipment, etc., where data obtained will be used to determine acceptability or be the basis for design or engineering evaluations.

Nonsafety-Related Anticipated Transient Without Scram (ATWS)

Special features that, as referenced in 10 CFR 50.62, fall into a category of items which could be related to an expected operational transient (such as loss of feedwater, loss of condenser vacuum, or loss of offsite power to the reactor) which is not accompanied by the reactor trip system shutting down the reactor.

Notification Point A specific preestablished point within a selected activity where work may proceed after contacting and receiving concurrence from the organization responsible for the notification point.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 75 of 113 Nuclear Plant Security A program which provides controls to ensure continued operability of security equipment and the integrity of nuclear plant security. This includes prevention of sabotage, safeguard information and material, plant access, and physical security events.

Operational Phase That period of time during which the principal activity is associated with normal operation of the plant. This phase of plant life is considered to begin formally with receipt of the operating license onsite and ends with commencement of plant decommissioning. In addition, there are certain preoperational activities (for example, testing, training, maintenance) proceduralized in accordance with operations NQAP requirements and initiated by the operations staff prior to receipt of the operating license which are considered to be operational phase activities at the time these activities begin.

Postmaintenance Tests Testing performed after completion of maintenance to verify the operational/functional acceptability of components/systems upon completion of maintenance.

Postmodification Tests Tests performed after completion of a plant modification to demonstrate conformance with as-designed requirements and to determine the effect of the modification on the overall system.

Preoperational Tests Tests identified in a facilitys Safety Analysis Report and performed on any system or plant feature for the purpose of proving its ability to perform its designed function.

Procurement Documents Contractually binding documents that identify and define the requirements that items or services must meet in order to be considered acceptable by the purchaser.

Programs Programs which administer and control activities and associated features as identified in Section 5.1 .B of this Plan that require control based on regulatory requirements or TVA commitments.

Quality Assurance Records Those records which furnish documentary evidence of the quality of items and of activities affecting quality. A document is considered to be a QA record when the document has been completed.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 76 of 113 Quality-Related Quality-related is a term which encompasses quality assurance program requirements that describe activities which affect structures, systems, and components. These requirements provide reasonable assurance that the facility can be operated without undue risk to the health and safety of the public. In addition to safety-related structures, systems, components, and activities, the term "quality-related' encompasses the broad class of plant features covered (not necessarily explicitly) in the General Design Criteria of 10 CFR 50, Appendix A, that contribute in an important way to the safe operation and protection of the public in all phases and aspects of facility operation (i.e., normal operation and transient control as well as accident mitigation).

Radioactive Material Shipment A program that provides controls for handling and/or shipping of radioactive material (NRC-licensed packages only).

Radwaste Management Systems, Structures, and Components Special features containing radioactive materials (i.e., liquids, gases, or solids) that, by design or operating practice, provide a means of processing prior to final disposition.

Reference Standards Standards (primary, secondary, and working standards where appropriate) used in a calibration program. These standards establish the basic accuracy limits for the calibration program.

Reportable Events Any of those conditions specified in 10 CFR 50.73.

Safety-Related Structures, Systems, and Components Those items that are necessary to ensure:

1. The integrity of the reactor coolant pressure boundary.
2. The capability to shutdown the reactor and maintain it in a safe condition.
3. The capability to prevent or mitigate the consequences of an incident which could result in potential offsite exposures comparable to those specified in 10 CFR 100.

Seismic Category l(L)

Special features that apply to nonsafety-related systems, structures, and components which provide structural integrity in preventing damage to a safety-related system, structure, and component in case of a failure and/or damage during a safe shutdown earthquake (SSE).

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 77 of 113 Significant Adverse Condition A documented adverse condition that is determined to be a QA programmatic deficiency.

Criteria for significance are specified in the corrective action program.

Special Nuclear Material Management A program which provides for special nuclear material (SNM) control and accountability as required by 10 CFR 70, 74, and 75. This program includes SNM inventories and system reviews, inspections, records management, and DOE/NRC inventory and transfer reports.

Special Tests A test that is (a) an engineering test including qualification testing for design verification or evaluation of components, structures, or systems, (b) a general test that is not specifically related to plant systems or features, such as the material testing and product testing that is normally performed by a testing lab, or (c) tests or experiments not described in the facilities Safety Analysis Report which may affect the operation of systems described therein (reference 10 CFR 50.59 and 10 CFR 72.48).

Startup Tests Those tests as identified in the Final Safety Analysis Report that commence after receipt of an operating license allowing fuel loading and testing at ranges through zero power, power escalation, and 100% warranty run. Startup tests prove that the unit has been properly designed and constructed and will meet all licensing requirements and specific contractual criteria.

  • Storage The act of holding items at the construction or operating Site in an area other than its permanent location in the plant.

Surveillance Tests Periodic tests to verify that structures, systems, and components continue to function or are in a state of readiness to perform their functions.

Test Record Drawings A set of as-constructed drawings which depict the configuration of a system as tested.

Test Scoping Documents Documents which include descriptions of each test to be performed including safety precautions to be followed, specific identification of test objectives, the means of performing the test, prerequisites that must be completed, environmental conditions required for testing, justification for a proposed degree of simulation less than full simulation, and specific acceptance criteria or a description of the means of determining acceptance criteria from functional testing requirements.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 78 of 113 Test Deficiency Any condition during which the equipment or system being tested: (1) fails to operate (e.g., pump will not operate, no control room annunciation), (2) operates in a suspected adverse manner (e.g., motor operates but smokes, questionable vibration), or (3) operates outside limits of documented acceptance criteria (e.g., inadequate flow, slow valve closure time).

Trend Analysis Evaluation of data that has been compiled or grouped onto charts, diagrams, reports, or other formats such that the prevailing tendency of selected parameters can identify areas that need improving and areas of past successes.

  • Verification An act of confirming, substantiating, and ensuring that an activity or condition has been implemented and accomplished in conformance with specific requirements. This includes line verifications.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 79 of 113 APPENDIX A COMPARISON MATRIX OF QUALITY ASSURANCE PLAN REQUIREMENTS WITH THOSE OF 10 CFR 50, APPENDIX B, 10 CFR 72, SUBPART G, AND SELECTED ANSI STANDARDS 10 CFR 50, APPx B 10 CFR 72, ANSI N45.2 - 1971 ANSI N18.7 - 1976 Criterion NQA Plan Subpart G Section NQA Plan Section NQA Plan 1 4.0;4.1 72.142 2.0 5.0 3.1 4.1;5.0 11 5.0 72.144 3.0 4.0;4.1 3.2 4.0;4.1 III 7.0 72.146 4.0 7.0 3.3 11.0 IV 8.1 72.148 5.0 8.1 3.4 4.0;11.0 V 6.0;7.0;9.9 72.150 6.0 6.0;7.0;9.9 4.0 4.1.3.B.5;5.3;6.0 VI 6.0;7.0;9.9 72.152 7.0 6.0;7.0;9.9 4.1.3.C.7.b;9.9;12.0 ViI 8.2 72.154 8.0 8.2 5.1 5.0 Vill 8.3 72.156 9.0 8.3 5.2.1 4.0 IX 9.3 72.158 10.0 9.3 5.2.2 6.0 X 9.1 72.160 11.0 9.1 5.2.3 6.0 xi 9.4 72.162 12.0 9.4 5.2.4 6.0 XII 9.5 72.164 13.0 9.5 5.2.5 6.0 XIII 9.6 72.166 14.0 9.6 5.2.6 6.0;9.7 XIV 9.7 72.168 15.0 9.7 5.2.7 6.0;9.8 XV 10.0 72.170 16.0 10.0 5.2.8 6.0;9.1 ;9.4 XVI 10.0 72.172 17.0 10.0 5.2.9 5.1;6.0 XVII 6.3 72.174 18.0 6.3 5.2.10 4.1.2;6.0 XVIII 12.0 72.176 19.0 12.0 5.2.11 6.0;10.0 5.2.12 6.0;6.3 5.2.13 6.0;8.0;9.6 5.2.14 6.0;10.0 5.2.15 6.0 5.2.16 6.0;9.5 5.2.17 6.0;9.1 5.2.18 6.0;9.3 5.2.19 6.0;9.4 5.3 6.0 5.3.1 6.0 5.3.2 6.0 5.3.3 6.0 5.3.4 6.0 5.3.5 6.0;9.8 5.3.6 6.0;5.1 5.3.7 6.0;9.5 5.3.8 6.0;5.1 5.3.9 6.0;5.1 5.3.10 6.0;9.1 ;9.4

0 0 )> 0 D DIC O  !~iZzU Oa5 (ft0; E~ _>

CD O W D

  • 0 = _.2CDQ N, N - OaX a '0 Procdurcm

> SECTIO NO FtA CD

= _

O. Con tro co § .

o 3 CU j0co 0.

.0 .q .3 0_~ .! Records CD 8 03 CL I CD 00

,D X Control CAQ 3 CD in 8N 9& X Proceuresen CA . _ _" _p ^_ PoEdurpenadSerie DocumentCotl Domesig t W (ft Co

= 0 x 0 X N X N Control IdniiainadCnrlo 0

o, >.a)

CA, MatProcuPrentsadCmoet c ctO 3 m 0

CD

.0 00c 0

G_ zC

,o (n C

_ cnCOou CA peilPrcseet oto 0 17-C C-D) 0

- x iL i> aCx .4

'o Inspectionf P hse Equipment,and Serseratin U0 - C:

0. 0. °°X aEqipent, eaned S& ervices Ow Z I-Control Iad of 0 jD3

.. Manteal Prces OMccol g X x N I~ndentificajtionandCotolo R x m x Cf _

_ Iesnsetiona

3. - >z ;0

~nx !A(n ( Ispectia Proesse, C)3 m

Leteification, a devices x ~ a N!'Tes 0) 2- -.O a.

O.cnl 0

-4 x a x H n li CoAntogf U) z x

FL X

w Controle Controft

~~Inspectrntion, and Te Int Test ing 0*

CX ID O.

v° 0.

03W X CandeSitions CD a 'O

, a Qualification, and Certification ozV x Auditing co O.

C la 0 CD.<

co co b o w Computer 5,  ;; o4l 0'

0 Software and Data z0 Tr _{

CD ~:r-CD ID )CO_

6 Definitions Co >

ID Qa-0) 0.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 81 of 113 APPENDIX B Page 2 of 23 REGULATORY GUIDE CONFORMANCE STATUS TABLE 1 C) 0 5) 0 AS 2N0 -C 0 0 0.-4

'akgn Shppng 0 (CC C)

Sects. 0 z Uo0o (L . : 0 .C r 0 e, 2) 9)- 9E- .2 2. i0' E =6*(6.- t gC.L 0 SORer Hadln Nuer of Itrn2185 fo 7.4 . 24 82. .c. 9 5. 9.6 Co2struction Phase)'

Reg Guid 1.3 R/2 ANSI. N4..317 XQ X XC/ X ) ~

Power 2.1.2.20403.3 0lants' Iandlngurfnienfon n ulearnc 2.1 2 8 2.5 .4,2 2.5 6 Powernlnts (During the 2.'E 25,7.0 Reg. Guide 1.38 1.38i R/O R/2 Maugst1972 ANSI N45.2.24-1972, ANStIN45.2 .4-1972, X X X X X X X X X X X X X X X

'nsaclation. Sipig, andts Sinpecion,.

PIsackagingIneectts.an Teceting.Requraerrendsfo Testiing.Returae entsfo Sects. Se.

Sc. Sect.

Sect. Sect. Set.2Scs 5et.2Scs Sect. Sect. Sect.

Ianstlimngotation aNduEletrc 2.1 23 8 2. 2.4.5.1 2.5 2.

EuPmwerlnts (During the 2.3 61.7 Construction ofhNucear Power ConstnuctionofNudear Poe GHuenerating Goenerating Stationsth Duationg' th

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 82 of 113 APPENDIX B Page 3 of 23 REGULATORY GUIDE CONFORMANCE STATUS TABLE 1 Co 0 M) 60 A'>

0, 0 U v~~~ o -CE3L z 2 UJ I.- M 0 0 co oA O 6 TA gCO .

0upenetr UOCMEN SOW2r Om.

D riwDm -\

, (DO .F. 0 a

co0CA 0( V)00) Q0 V Z *M O 0 ) r_, rC (DM EnC 0 0 0 M Am MOC 4 Installation, Ipi and 7 2 4 Cm am >

Apri t-m TIJi6 of 5,6 M 00 Cne 2.2 ANS N45 LO)

2. 17 <0 .SO < ow o SOURCE REQUIREMENT 6.1.4 6.2.4 6.3.4 7.4 8.1.4 8.2.4 8.3.4 9.1.4 9.3.4 9.4.4 9.5.4 9.6.4 9.7.4 9.8.4 10.4 11.4 12.4 13.4 15.0 DOCUMET Reg. Guide 1.94 R11 AprIl 1976 ANSI N45.2.5-1974 X X X X X X X X X X Supplementary Quality

'Assurance Requirements for Sect. Sect. Sect. Sect. Sects. Sect. Sects.

Installation. Inspection, and 2.1 2.2 7 7 2.3.4. 2.5 3.4,5 Testing of Structural Conrete 2.2 5,6 and Structural Steel During the Construction Phase of Nuctear Power Ptants Reg. Guide 1.58 R/R Septenber 1980 ANSIIASME N45.2.6-1978 X X X X IQualifications of Inspection.

Exanination, and Testing Sect.

Personnel for Nuclear Power 6 Plants' Reg. Guide 1.1 16 R10-R June 1976 ANSI N45.2.8 -1975. X X X X X X X X X X X

'Supplernentary Quality Assurance Requirements for Sects. Sect. Sect. Sect. Sects. Sect. Sects. Sects. Sects.

Installation.lInspection, and 2.1 2.2 7 7 23.3, 2.8 2.5 4-2 3.1 Testing of Mechanical 2.2 4.5 5.1 3.541 Equipment and Syslems for45 the Construction Phase of B Nuclear Power Plats

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 83 of 113 APPENDIX B Page 4 of 23 REGULATORY GUIDE CONFORMANCE STATUS TABLE 1

-L 00 W

Q.NSIM XO 00orag0 Power 197 XCC 72 Xa Sects mu)im DOCMENC Lt M and 2.9 Maintenance CS)a of

.0 0

.at C

C)

ANSI N452.12-1972 X X X Reg. Guide 1.8841 Octobery 1976

  • QualityAssuranceRerdsfr 42,.

SoURC E RuPoQr er T 6.1.4 6.2.7 6 .4 7_ .. .. .. .. .. .. .. .. .. .. 04 1. 124 1 3.6 1 5 ANSI N45.2 .11-1974 X X X X Reg. Guide 1.74 1

'Reqtuirements fozrColletiongo "Quality AssuranceTem Reg.

Reg.Guide Guide1.64 R/2 1.144R Jutnber1976 Seebeuaey 1980 N45.2 .1- 1974 ANSI N45.2.102- 19777 X X Quality AssuranceRror426

'Quality Assurance Terorms f Nuclear Power Plants' . .

forQuclear PowerPantse

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 84 of 113 APPENDIX B Page 5 of 23 REGULATORY GUIDE CONFORMANCE STATUS TABLE 1 C

CL 0 C) 2i 0. ->

0 4)C -o C fl V) MC)

Ro cm c1a dt

.0 ra r P 10 a.e .- S Re. R*

EE a .0i g_~

0.4 25 c 0213 IE 8 i2 w c 9 0a0 )O5 I -o G~ 0 0~0cw 21) .S. 0. -o o U CLI 0~ <6 0E  :

<3 0U0 SOURCE REQUIREMENT 6.1.4 6.2.4 6.3.4 7.4 8.1.4 8.2.4 8.3.4 9.1.4 9.3.4 9.4.4 9.5.4 9.6.4 9.7.4 9.8.4 10.4 11.4 12.4 13.4 15.0 DOCUMEN Reg. Guide 1.123 R11 July 1977 ANSI N45.2.13.1976 X X X X X X X Quality Requirements for Control of Procurement of Sect. Sect. Sect. Sects. Sect.

ItemsandServices for Nuclear P1 2 3.0 7 7.4 Power Plants 10 Reg. Guide 1.146 RIO August 1980 ANSI N45.2.23-1978 X X

'Aualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants' Reg. Guide 1.152 Novemrber 1985 ANSI/iEEE. ANS.7-4.3.2 - x 1982.

'Application Criteria for Sects.

Progra.... ble Digital 6 Conmputer 7 Systems in Safety Systems of Nuclear Power Generating Stations'

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 85 of 113 APPENDIX B Page 6 of 23 REGULATORY GUIDE CONFORMANCE STATUS TABLE 1 75 cu m

XX 0 2 l o; c VeU -

2 *g E - 1CC)6 OC ( 2C 1 wm

' in in 1 7t R**.r-C -c a) g2 1

.C C-aa 00 a ' OC C SOURCE RE ~ ET6.1.4 6.2.4 6.3.4 7.4 8.1.4 8.2.4 8.3.4 9.1.4 9.3.4 9.4.4 9.5.4 9.6.4 9.7.4 9.8.4 10.4 11.4 12.4 13.4 15.0 1CF21X X X 10 CFR 50 X X X X X X X X X X X X X X X X X Appenidix B Cuit. Cr11. Cult. Crii. Crit. Crit. Cr11. Cr11. Cr11. Cr1t. Cr11. Cr1t. Cr1t. Cr11. Crit Cr11.

100 V CF = =73=

VI 50 XVlI =

III =

IV =

ViI Vill =X =

IX =

xi =

XII =

XIII =

XIV XV II xviII

_ _ _ _ _ _ _ _ _ _XVI 10 CF 50120 X IO CFR 50.49 X X X 10 G CF 72 Subar X X X X X7.7m IO CFR 50.55a X IOCFR 50O55e X 10 CFR 50.59 X X 10CFR 72.48 10 CFR 50.72 X 10OCFR 50.73 X 10 CFR 50.120 X X

10 CFR 72. Subpart G X X X X X X X X X X X K 72.170 X X 72.15072127.4 72.146 72.148 72.154 72.156 72.160 72.158 72.162 72.184 72.166 72.168 72.172 72.144 72.176 ___

10CFR 73.71 IXI I-I I-I I-I Tj

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 86 of 113 APPENDIX B Page 7 of 23 REGULATORY GUIDE CONFORMANCE STATUS TABLE 1 8

0 . (l0

-ot0

'aoE

.Eo>

( to.- .1=r z 2oc (

C C C  ?

0 = (U VU C U. £F~ -c a- C 2 - 'D ... ( O .U t CL - g0 .CC A)MCSdo. 0I X Z CoC M ' -0 uO - UV 0(

f-n 00 )

0_

0.U 0 U00 00E W 2 ~lUC>a)U 0i o

-U r0 c

~ rc (

-0.

0 Cao

<c. *0 M

.sa 00E 0 0

_0 SOURCE REOUIREMENT 6.1.4 6.2.4 6.3.4 7.4 8.1.4 8.2.4 8.3.4 9.1.4 9.3.4 9.4.4 9.5.4 9.6.4 9.7.4 9,8.4 10.4 11.4 12.4 13.4 15.0 DOCUMEN ASME Sectd.i X X X X X X X X X X X X X X X X DIV. 1, .

NCA 4000 OQualityAssurance' ASME Sect. V. X

'Nondestructive Examination' ASME Sect. IX X

  • Weldiug and Brazing Qualifications' ASME Sect. XI, X X X X X X Rules for Inservice Inspection of Nuclear Power Plante AWS. X

'Structural Welding Code D1.1' AISC. X

'Specification for the Design.

Fabrication, and Erection of Structural Sleet for Buildings7

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 87 of 113 APPENDIX B Page 8 of 23 REGULATORY GUIDE CONFORMANCE STATUS TABLE 1 CL CD V) >

C 0 a) 0

-co Ca a) C 0n Cn 0edion)

NUTAC Ro

_-d o Genenc teEet ot( tSaler

'D 0 8 Uc 0:'Sedio0

.E ..02 i :3 222( a00D) (e 194 2 3 E! a(

'Standar - _X . 0 a . Q i an . _ *C 0 EA CT 0 a L r A0 i) 0 ~ a0 j)

~ 0 00:

a.. a 'D 3 0 4i)

-E . -L C) Oft 0 00(L DCIO 0.0 OW 'DM .S.3 C)

Oco i- OaW M~

M( .s 0 ~ 'a

< 0> 0(0 E < 0 SOURCE REOUIREENT 6.1.4 6.2.4 6.3.4 7.4 8.1.4 8.2.4 8.3.4 9.1.4 9.3.4 9.4.4 9.5.4 9.6.4 9.7.4 9.8.4 10.4 11.4 12.4 13.4 15.0 DOCUMEN

'ASNT X SNT-TC..IA-1984

'Personcnel Qualification and Certification In Nondestructive Testing' Plant Technical Specifications X (AdrCinistraTive Controls Section)

NUTAC Report on Genenic Letter 83-28. 'Required X X X X Actions Based on Generic Irrp4ications of Salem ATWS Events. 'Section 2.2.2 Vletter from L.M. Mills to H. Rt.

Denton dated Septerrber 17.

1984)

'ANSI/ASNT CP.189-1991 Certification of Nondestructive Testing Personnel'

  • NOTE: In accordance with ASME Code,Section XI, Division 1, 1995 Edition with Addenda through 1996 (19951A96), Article IWA, Paragraph IWA, 2310,

'Personnel performing nondestructive examination (NDE) shall be qualified in accordance With ANSIIASNT CP-189 ...Certifications based on SNT-TC-1A are valid until re-certification is required. Re-certification shall be in accordance with...ANSI/ASNT CP-189...'

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 88 of 113 APPENDIX B Page 9 of 23 Table 2 REGULATORY GUIDE CONFORMANCE STATUS NRC Regulatory Guide 1.8 - "Personnel Selection and Training," Revision 2,4/87, endorses ANSI N18.1-1971 and ANSI/ANS 3.1-1981.

The Nuclear Quality Assurance Program (NOAP) follows this Guide with the following alternatives:

1. TVA will meet the requirements of Regulatory Guide 1.8, Revision 2 (4/87) for all new personnel qualifying on positions identified in regulatory position C.1 after January 1,1990. Personnel qualified on these positions prior to this date will still meet the requirements of Regulatory Guide 1.8, Revision 1-R (5/77). As specified in regulatory position C.2, all other positions will meet the requirements of ANSI/ANS N18.1-1971.
2. Section 4.3.2 - There may be occasions where TVA will utilize a composite crew (multidiscipline) during operations phase activities to efficiently perform a task. As such, a foreman may not have the experience required in one of the disciplines he supervises. In these instances, the foreman will meet the requirements of ANSI N18.1 in at least one of the disciplines, and additional technical support, procedure support, and/or discipline support will be available to the foreman for the task period.
3. In lieu of the training guidelines endorsed by Regulatory Guide 1.8, Revision 2, specified in Regulatory Position sections C.1.b and C.1.f, TVA shall comply with the requirements of 10 CFR 55.31 (a) (4) and 10 CFR 55.59 as they apply to training programs based on a Systems Approach to Training (SAT) as defined in 10 CFR 55.4 and using a plant-referenced simulator as required by 10 CFR 55.45.
4. TVA uses the methodology for equating education and experience contained in ANSI 3.1-1987 for guidance to evaluate equivalent related experience for a degree.
5. In addition to the training guidelines in subsections 5.3.2, 5.3.3, 5.3.4, and 5.5 of ANSI N18.1-1971, TVA shall comply with the requirements of 10 CFR 50.120 as it applies to training programs based on a systems approach to training.
6. In lieu of the one year of experience in the implementation of the quality assurance program for Site Quality Managers (ANSI/ANS 3.1-1981, Section 4.4.5.b), TVA requires five years experience in QA-related activities.

NRC RegulatorV Guide 1.28 - 'Quality Assurance Program Requirements (Design and Construction),"

Revision 3, 8/85, allows continued implementation of ANSI N45.2-1971 as previously committed.

The NQAP follows this Guide.

NRC Regulatory Guide 1.30 - "Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment," 8/72, endorses ANSI N45.2.4-1972.

The NQAP follows this Guide with the following alternatives:

1. ANSI N45.2.4 states that the Appendixes are not a part of the standard, therefore, TVA does not consider the Appendixes to be mandatory.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 89 of 113 APPENDIX B Page 10 of 23 Table 2 REGULATORY GUIDE CONFORMANCE STATUS

2. Section 2.1, "Planning" - The intent of this section shall be met in different forms depending on magnitude and scope of work.
3. During the operational phase, tests are performed as determined by the site engineering organization, modification, or maintenance engineers, as appropriate, based upon the equipment or system functions that could be impacted by the work performed.
4. TVA's alternative to the tagging of in-plant process instruments for calibration status (ANSI N45.2.4, Section 6.2.1) is that each item of process control instrumentation is uniquely identified with an instrument number. This number is utilized in an instrument maintenance record so that the current calibration status and data attesting to the status of each item are documented along with the identification of the person performing the calibration. In addition, this record system provides a mechanism for evaluating equipment performance and adjusting calibration frequencies to ensure quality performance.
5. Section 6.2.2 - For modifications, TVA interprets this section as not requiring that an entire system be retested after modifications. Testing will be performed on equipment that has or could be impacted by the modification in accordance with applicable design and testing requirements to verify that operability requirements are met and that interfacing components and equipment functions have not been degraded.
6. TVA implements the requirements of N45.2.4 Sections 5.1 and 6.1 with a performance-based graded QA verification program consisting of quality control inspection, line verification, and quality assessments.

NRC Regulatorv Guide 1.33 - "Quality Assurance Program Requirements (Operations)," Revision 2, 2/78 endorses ANSI N18.7-1976/ANS 3.2.

The NQAP follows this Guide with the following alternatives:

1. ANSI N18.7-1976 references certain other standards to which TVA takes exception. TVA's exception and appropriate alternatives to the other standards are listed in this Appendix in the appropriate location.
2. Section 5.2.2 - The guidelines of this section are accepted with the following interpretations:
a. Temporary changes which clearly do not change the intent of the approved procedure shall as a minimum be approved by two members of the plant management staff, at least one of whom holds a Senior Reactor Operator License on the unit affected or as defined in Section 9.9 of this Plan, the FSAR, or appropriate plant procedures.
b. For facilities holding a construction permit where system(s) and/or components have been released to the operations organization, temporary changes to procedures, as described above, shall as a minimum be approved by two members of the plant management staff, at least one of whom shall be a designated member of the plant operations management staff.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 90 of 113 APPENDIX B Page 11 of 23 Table 2 REGULATORY GUIDE CONFORMANCE STATUS

3. Section 5.2.13.1 - The statement that changes made to procurement documents be subject to the same degree of control as was used in the preparation of the original documents is applied consistent with the requirements of ANSI N45.2.1 1, paragraph 7.2. Minor changes to documents, such as inconsequential editorial corrections or changes to commercial terms and conditions, may not require that the revised document receive the same review and approval as the original documents..
4. Section 5.2.15 - The guidelines of this section are accepted with the following alternatives:
a. Minor changes to documents are processed as delineated in Section 6.1.2.F.3 of this Plan.
b. TVA has programmatic controls in place that make a biennial review process unnecessarily duplicative. These programmatic controls ensure procedures are periodically reviewed and maintained current when pertinent source material is revised; the plant design changes; and/or any deficiencies occur. TVA has determined that this approach better addresses the purpose of the biennial review process and that, from a technical and practical standpoint, is better suited to ensure the validity of operational phase site procedures and instructions.
5. Section 5.2.17 - The statement that deviations, their cause, and any corrective action completed or planned shall be documented will apply to significant deviations. Other identified deviations will be documented and corrected. This interpretation is consistent with Appendix B to 10 CFR 50, Criterion XVI, "Corrective Action."
6. TVA will comply with regulatory position C.4 except that audit frequencies are specified in NQA Plan Section 12.2.E.
7. Section 4.3.4.4.c - The independent review body implements this section by reviewing reportable events that are reported to the NRC in accordance with 10 CFR 50.73.

NRC Regulatorv Guide 1.37 - "Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants," 3/73, endorses ANSI N45.2.1-1973.

The NQAP follows this Guide with the following alternatives:

1. The phrase "when applicable" used in Regulatory Guide 1.37, paragraph C.2, leaves open to interpretations which specific requirements and recommendations contained in ANSI N45.2.1-1973 are applicable to and achievable during the construction or operation phase. The interpretation of "when applicable" will be made with appropriate concurrence in a written procedure before its application.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 91 of 113 APPENDIX B Page 12 of 23 Table 2 REGULATORY GUIDE CONFORMANCE STATUS

2. The second sentence of paragraph C.3 should be amended to read:

"The water quality for final flushes of fluid systems and associated components during the operations phase shall be at least equivalent to the quality required for normal operation. This requirement does not apply to dissolved oxygen or nitrogen limits nor does it infer that other additives normally in the system water will be added to the flush water."

3. Temporary ink markings placed by the fabricator as mill marks may remain on components that operate at temperatures greater than 1400 F (normal or accident) and have a 40-year integrated 6

radiation dose less than 10 rads.

4. Control of halogen, sulfur, or low-melting metal contents is not required for abrasive tools such as grinding wheels, cutoff wheels, sanding paper, and flapper wheels. Use of abrasive tools on corrosion-resistant alloys shall be followed by cleaning with an approved solvent. Particulate residue shall be removed by vacuum, brush, dry wiping cloth, or air, with special attention to crevices.
5. Temporary tape and markings (ink and paint) may remain on components that operate at temperatures less than 140'F (normal or accident).
6. Section 2.1, "Planning - For operations phase activities, the required planning is frequently performed on a generic basis for application to many systems and component installations. This results in standard procedures for cleaning, inspection, and testing which meet the requirements of the standard. Individual plans for each item or system are not normally prepared unless the work operations are unique; however, standard procedures are reviewed for applicability in each case. Cleaning procedures are limited in scope to those actions or activities which are essential to maintain or achieve required quality. This is consistent with Section 5.2.17, paragraph 5, of ANSI N18.7-1976, which provides for examination, measurement, or testing to ensure quality or indirect control by monitoring of processing methods.
7. TVA intends to conform to the cleanness requirements of Section 3.1 of ANSI N45.2.1-1973 with the exception of permissible particle sizes for cleanness Classes B and D. In these cases, TVA will conform to the requirements of ANSI N45.2.1-1980, Section 3.2.2.1(b), which states, "There shall be no particles larger than 1/32 inches by 1/16 inches long (0.8 mm by 1.6 mm)" for cleanness Class B, and Section 3.2.4.4 which states, "Particles no larger than 1/16 inch by 1/8 inch long (1.6 mm by 3.2 mm) on a 14-mesh (1.4 mm, ASTM E-11, "Specification for Wire Cloth Sieves for Testing Purposes) or finer filter, or the equivalent" for cleanness Class D.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 92 of 113 APPENDIX B Page 13 of 23 Table 2 REGULATORY GUIDE CONFORMANCE STATUS NRC Regulatory Guide 1.38 - "Quality Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants," Revision 2, 5/77 endorses ANSI N45.2.2-1972.

The NQAP follows this Guide with the following alternatives:

1. Storage requirements at the site are determined by the responsible engineering unit. This determination involves an evaluation of the complexity of the item and its importance to safety.

The various types of storage are provided (yard, warehouse, humidity controlled, etc.) but the classification levels of N45.2.2 are not necessarily employed.

2. In accordance with ASME QA Case 78-N45.2.2-01-0, welding electrodes hermetically sealed in metal containers may be stored under conditions described for level C items unless other storage requirements are specified by the manufacturer. Storage conditions for level C items may also apply to bare wire and consumable inserts unless specified otherwise by the manufacturer.
3. Austenitic stainless steel and nickel alloy items may have markings applied directly to the bare metal surfaces provided the requirements of TVA internal procedures, which control the chemical content of the marking materials, are met.
4. Tubing and piping materials shall have end caps or plugs while in storage unless specified otherwise by engineering specification. End caps or plugs are not mandatory on tube or pipe fittings provided the requirements of TVA internal procedures to store under cover with protection from the elements are met. These materials are required to be in a visually clean condition and free of visually detectable defects prior to installation.
5. Section 6.4.1 - TVA will meet this section through periodic inspection of randomly selected stored items by QC inspection personnel certified to ANSI N45.2.6. The criteria and factors regarding frequency and degree are established in Section 5.2A and B of this Plan.
6. TVA takes exception to ANSI N45.2.2, Section 5.2.1. TVA's alternative is that shipping damage inspection shall be done before unloading if evidence of possible shipping damage would be lost in unloading, such as when the item is secured to the carrier, covered by tarpaulin, accompanied by a visible impact recorder, or when the contract requires any of the above. Personnel performing preliminary visual observations (prior to unloading) per Section 5.2.1 need not be qualified to ANSI N45.2.6. Item inspections per Section 5.2.2 are performed by personnel qualified to ANSI N45.2.6. The item inspections also ensure that no damage has occurred during shipping.
7. Section 6.4.2(8) - TVA will follow either vendor recommendations for preventive maintenance, an engineering evaluation, or engineering requirements documents delineating appropriate maintenance requirements, for items in storage. Engineering evaluations and engineering requirement documents will consider vendor recommendations.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 93 of 113 APPENDIX B Page 14 of 23 Table 2 REGULATORY GUIDE CONFORMANCE STATUS

8. Section 6.5 (last sentence) - During a period of installed storage or extended layup after release of an item from permanent storage, vendor recommendations for preventive maintenance, or an engineering evaluation or an engineering requirements document delineating appropriate maintenance requirements will be followed. Engineering evaluations and engineering requirement documents will consider vendor recommendations.
9. TVA's alternative to the requirements of Section 6.6 of ANSI N45.2.2 is that Procurement will maintain written records of pertinent information such as storage location and receipt inspection results and will take necessary action to provide packaging for items not suitably packaged for storage. Written records of personnel access to nuclear stores are kept for entry during times when nuclear stores personnel are not on duty. All other times, the storeroom is locked and admittance is controlled by stores personnel.
10. TVA does not utilize specific levels for classification of items (ANSI N45.2.2, Section 2.7);

however, the specific requirements identified in the Standard are used as a guide with respect to protecting the equipment.

11. TVA does not utilize specific levels for packaging (ANSI N45.2.2, Section 3.2). All purchased items have been properly packaged. Additionally, periodic storage inspections are conducted to ensure protective measures specified in the Standard to prevent damage or deterioration are complied with and are imposed until the item or component is issued for use. Purchased items undergo receiving inspection using the graded approach. This inspection verifies that items have been properly packaged for shipment and will ensure that any special protective measures specified in the Standard to prevent damage, deterioration, or contamination will be imposed until the item or component is issued for use.
12. TVA takes exception to the requirement (ANSI N45.2.2, Section 6.2.4) that salt-tablet dispensers in any storage area shall not be permitted. TVA Procurement stores salt-tablet dispensers in sealed containers for use outside of the storage area only.
13. Sections 7.3.2 and 7.4.2 - Use of hoisting equipment beyond its rated load is acceptable when specifically approved with technical justification by engineering.
14. Section 5.2.2(1) Physical Properties - QC Inspectors, Engineers, or other technically competent individuals assure that physical properties conform to specified requirements and that chemical and physical test reports meet the requirements.
15. Section 2.4 - Off-site inspection, examination or testing is audited by personnel who are qualified in accordance with ANSI N45.2.23 rather than ANSI N45.2.6 as stated in the ANSI Standard.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 94 of 113 APPENDIX B Page 15 of 23 Table 2 REGULATORY GUIDE CONFORMANCE STATUS NRC Regulatory Guide 1.39 - "Housekeeping Requirements for Water-Cooled Nuclear Power Plants,"

Revision 2, 9/77 endorses ANSI N45.2.3-1973.

The NQAP follows this Guide with the following alternative:

The zone designations of Section 2.1 of N45.2.3 and the requirements associated with each zone are not consistent with the requirements for an operating plant. Instead, TVAN procedures or instructions for housekeeping activities which include the applicable requirements outlined in Section 2.1 of N45.2.3 and which take into account radiation control considerations, security considerations, fire protection considerations, and personnel and equipment safety considerations are developed on a case basis.

NRC Reculatory Guide 1.58 - "Qualification of Nuclear Power Plant Inspection, Examination and Testing Personnel," Revision 1, 9/80 endorses ANSI N45.2.6-1978.

The NQAP follows this Guide with the following alternatives:

1. TVA complies with Regulatory Position C.1 of this Regulatory Guide, as follows:
  • Operations, maintenance, and modification testing personnel are qualified to Regulatory Guide 1.8 (ANSI N18.1) as endorsed in Appendix B of this Plan.
  • Quality control inspection personnel are qualified to ANSI N45.2.6.
2. Certifications may not correspond to the levels established in N45.2.6. Inspection, examination, and testing personnel may be classified by disciplines (mechanical, civil, electrical, instrumentation, hanger, etc.) and certified by procedure to perform the functions identified in N45.2.6, Tables I, L-l, and L-lI.
3. Medical eye examinations for inspection, testing, and examination personnel are made in accordance with TVA eye examination requirements.
4. ASNT recommended practice SNT-TC-1 A-1 984 will be used to qualify and certify nondestructive examination personnel after February 26,1990. Personnel qualified prior to this date will still meet the requirements of SNT-TC-lA-1980. In ASME Section XI applications, SNT-TC-lA as modified by ASME Section Xi will be used. ANSI/ASNT CP-1 89, 1991 is acceptable for qualification of personnel performing nondestructive examination of primary containment. Certifications based on SNT-TC-1A are valid until recertification is required.
5. TVA complies with Regulatory Position C.2 as follows: For containment leak rate testing personnel, TVA as a minimum will meet the qualification requirements of ANSI N45.2.6 as endorsed by Regulatory Guide 1.58, Revision 1.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 95 of 113 APPENDIX B Page 16 of 23 Table 2 REGULATORY GUIDE CONFORMANCE STATUS NRC Regulatory Guide 1.64 - "Quality Assurance Requirements for the Design of Nuclear Power Plants,"

Revision 2, 6/76, endorses ANSI N45.2.11-1974.

The Nuclear Quality Assurance Plan follows this Guide with the following alternative to Regulatory Position C.2:

If in an exceptional circumstance, the engineer's supervisor is the only person technically qualified to perform the review, the design verification review will be conducted by the supervisor, provided that:

1. The other provisions of this Regulatory Guide and ANSI N45.2.1 1, Section 6.1 are satisfied.
2. The justification is individually documented and approved in advance by the supervisor's management.
3. NA&L will audit the use of supervisors as design verifiers to guard against abuse.

NRC Regulatory Guide 1.74 - "Quality Assurance Terms and Definitions," 2/74, endorses ANSI N45.2.10-1973.

The NQAP follows this Guide with applicable alternatives noted in Section 15 of this Plan.

NRC Regulatory Guide 1.88 - "Collection, Storage, and Maintenance of Nuclear Power Plant Quality Assurance Records," Revision 2, 10/76, endorses ANSI N45.2.9-1974.

Requirements of Regulatory Guide 1.88 (and the alternatives listed below) apply to 10 CFR 72 required records including: Records required by 10 CFR 72 must be maintained in duplicate storage.

The NQAP follows this guide with the following alternatives:

Section 2.2.1 - TVA may also define lifetime QA records to be "life of the nuclear liability policy, plus the subsequent 10 years during which claims may be covered by the policy." This definition is consistent with ANI/MAELU Information Bulletin 80-1A, Revision 2, and the requirements of our nuclear insurer.

Section 5.4.3 - In order to preclude deterioration, manufacturer's packaging and storage recommendations for special process records will be considered.

Section 5.6 - TVA will provide two-hour minimum fire-rated protection for QA records and utilize one of the following alternatives as single storage facilities:

1. A fire-resistive vault or file room that meets the applicable requirements of ANSI N45.2.9-1974 with the following exceptions:
a. Records will be afforded the protection of a two-hour rated facility.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 96 of 113 APPENDIX B Page 17 of 23 Table 2 REGULATORY GUIDE CONFORMANCE STATUS

b. Records will be stored in fully enclosed cabinets.
c. Structure, doors, frames, and hardware shall be designed to fully comply with a minimum two-hour rating.
d. Pipes or penetrations will be allowed for fire protection, lighting, temperature, humidity control, or communications.
e. Work not directly associated with records storage or retrieval will be prohibited in the facility.
f. Smoking and eating/drinking will be prohibited throughout the records facility.
2. One-hour fire-rated cabinets if the following conditions are met:
a. The records are recreatable, OR
b. Are contained within a facility of fire-resistive construction with adequate smoke detection or fire-suppression systems: OR
c. Are within a facility with a fuel loading less than 25 pounds/square foot as defined by NFPA 232-1980.

QA records may be temporarily stored for 60 days or less in steel file cabinets or drawers if the following conditions are met:

1. The records are recreatable, OR
2. Are contained within a facility of fire-resistive construction with adequate smoke detection or fire-suppression systems: OR
3. Are within a facility with a fuel loading less than 25 pounds/square foot as defined by NFPA 232-1980.

For storage of film and other processed records, humidity and temperature controls shall be provided to maintain a stable environment. Recommendations by the manufacturer will be considered in determining an acceptable range of tolerance.

In addition to the records specified in Appendix A to ANSI N45.2.9-1974, the following records and retention times are applicable to WBN:

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 97 of 113 APPENDIX B Page 18 of 23 Table 2 REGULATORY GUIDE CONFORMANCE STATUS

1. Licensee Event Reports required by 10 CFR 50.73 (3 years).
2. Records of changes made to the procedures required by NQA Plan Section 9.9.2.B.7.a for WBN only (3 years).
3. Records of surveillance activities, inspections, and calibrations required by the Technical Specifications and the Fire Protection Program (5 years).
4. Records of sealed source and fission detector leak tests and results (5 years).
5. Records of annual physical inventory of all sealed source material of record (5 years).
6. Records of reactor tests and experiments (lifetime).
7. Records of inservice inspections performed pursuant to the Technical Specifications (lifetime).
8. Records of quality assurance activities required by the NQA Plan not listed in items 1 through 5 above and which are classified as permanent records by applicable regulations, codes, and standards (lifetime).
9. Records of 50.59 screening reviews and evaluations performed for changes made to equipment pursuant to 10 CFR 50.59 (lifetime). Records of 50.59 screening reviews and evaluations performed for changes made to procedures or tests and experiments pursuant to 10 CFR 50.59 (5 years).
10. Records of the reviews required by NQA Plan Sections 9.9.2 and 4.1.3.B (lifetime).
11. Records of the service lives of all hydraulic and mechanical snubbers required by Technical Requirement (TR) 3.7.3, "Snubbers," including the date at which the service life commences, and associated installation and maintenance records (lifetime).
12. Records of secondary water sampling and water quality (lifetime).
13. Records of analyses required by the Radiological Environmental Monitoring Program that would permit evaluation of the accuracy of the analysis at a later date (these records should include procedures effective at specified times and QA records showing that these procedures were followed (lifetime).
14. Records of reviews performed for changes made to the Offsite Dose Calculation Manual and the Process Control Program (lifetime).
15. Records of steam generator tube surveillance (lifetime).

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 98 of 113 APPENDIX B Page 19 of 23 Table 2 REGULATORY GUIDE CONFORMANCE STATUS In addition to the records specified in Appendix A to ANSI N45.2.9-1974, the following records and retention times are applicable to SQN:

1. Licensee Event Reports required by 10 CFR 50.73 (five years).
2. Records of surveillances activities, inspections and calibrations required by the Technical Specifications (five years).
3. Records of changes made to the procedures required by NQA Plan Section 9.9.2.A.2 for SQN only (five years).
4. Records of sealed source and fission detector leak tests and results (five years).
5. Records of annual physical inventory of all sealed source material of record (five years).
6. Records of gaseous and liquid radioactive material released to the environs and the resulting calculated dose to an individual member of the public (lifetime).
7. Records of reactor tests and experiments (lifetime).
8. Records of in-service inspections performed pursuant to the Technical Specifications (lifetime).
9. Records of 50.59 screening reviews and evaluations performed for changes made to equipment pursuant to 10 CFR 50.59 (lifetime). Records of 50.59 screening reviews and evaluations performed for changes made to procedures or tests and experiments pursuant to 10 CFR 50.59 (5 years).
10. Records of analyses required by the radiological environmental monitoring program (lifetime).
11. Records of secondary water sampling and water quality (lifetime)
12. Records of the service life monitoring of all safety-related hydraulic and mechanical snubbers, required by Technical Specification 3.7.9, including the maintenance performed to renew the service life (lifetime).
13. Records for Environmental Qualification which are covered under the provisions of Paragraph 2.c (12) (b) of License No. DPR-77 (lifetime).
14. Records of reviews performed for changes made to the OFFSITE DOSE CALCULATION MANUAL and the PROCESS CONTROL PROGRAM (lifetime).
15. Records required by 10 CFR 72 (retained for the life of the Storage Cask License).
16. Records of screening reviews and evaluations performed for changes made to spent fuel storage cask design, procedures, tests or experiments pursuant to 10 CFR 72.48 (retained for the life of the Storage Cask License) .

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 99 of 113 APPENDIX B Page 20 of 23 Table 2 REGULATORY GUIDE CONFORMANCE STATUS In addition to the records specified in Appendix A to ANSI N45.2.9-1974, the following records and retention times are applicable to BFN. These records shall be kept in a manner convenient for review.

1. Reportable Events
2. Checks, inspections, tests and calibrations of components and systems, including such diverse items as source leakage.
3. Records of 50.59 screening reviews and evaluations performed for changes made to equipment pursuant to 10 CFR 50.59 (lifetime). Records of 50.59 screening reviews and evaluations performed for changes made to procedures or tests and experiments pursuant to 10 CFR 50.59 (5 years).
4. Records of screening reviews and evaluations performed for changes made to the facility, spent fuel storage cask design, procedures, tests or experiments pursuant to 10 CFR 72.48 (retained for the life of the Storage Cask License).
5. Test results in units of microcuries for leak tests.
6. Record of annual physical inventory verifying accountability of sources on record .
7. Records of gaseous and liquid radioactive waste released to the environs, and the resulting calculated dose to individual, MEMBERS OF THE PUBLIC
8. Reactor coolant system inservice inspection.
9. Records required by 10 CFR 72 (retained for the life of the Storage Cask License).
10. Design fatigue usage evaluation.

Monitoring and recording requirements below will be met for various portions of the reactor coolant pressure boundary (RCPB) for which detailed fatigue usage evaluation per the ASME Boiler and Pressure Vessel Code Section III was performed for the conditions defined in the design specification. In this plant, the applicable codes require fatigue usage evaluation for the reactor pressure vessel only. The locations to be monitored shall be:

1. The feedwater nozzles
2. The shell at or near the waterline.
3. The flange studs.

Transients that occur during plant operations will be reviewed and a cumulative fatigue usage factor determined.

For transients which are more severe than the transients evaluated in the stress report, code fatigue usage calculations will be made and tabulated separately.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 100 of 113 APPENDIX B Page 21 of 23 Table 2 REGULATORY GUIDE CONFORMANCE STATUS In the annual operating report, the fatigue usage factor determined for the transients defined above shall be added and a cumulative fatigue usage factor to date shall be reported. When the cumulative usage factor reaches a value of 1.0, an inservice inspection shall be included for the specific location at the next scheduled inspection (3-1/3-year interval) period and 3-1/3-year intervals thereafter, and a subsequent evaluation performed in accordance with the rules of ASME Section XI Code if any flaw indications are detected. The results of the evaluation shall be submitted in a Special Report for review by the Commission.

11. Reviews performed for changes made to the Offsite Dose Calculation Manual and the Process Control Program.

Except where covered by applicable regulations, items I through 5 above shall be retained for a period of at least five years and items 6 through 9 shall be retained for the life of the plant. A complete inventory of radioactive materials in possession shall be maintained current at all times.

NRC Regulatorv Guide 1.94 - 'Quality Assurance Requirements for Installation, Inspection, and Testing of Structural Concrete and Structural Steel During the Construction Phase of Nuclear Power Plants,"

Revision 1, 4/76, endorses ANSI N45.2.5-1974.

The NQAP follows this Guide with the following alternatives:

1. The qualification requirements for quality control (QC) inspectors are stated in our position on Regulatory Guide 1.58 in this table.
2. Testing frequency and QC acceptance criteria for concrete construction is described in the Safety Analysis Report for each plant.
3. Burning of bolt holes is acceptable when specifically approved by engineering.
4. The installation method for high strength bolting may be either the automatic cutoff impact wrench method, turn-of-nut method, or direct tension indicator method.
5. Torque wrench inspection of completed connections installed by the turn-of-nut method shall not be required but may serve to resolve disagreements concerning the results of inspection of bolt tension.
6. Torque wrench inspection of the load indicator washer type of direct tension indicator shall not be required.
7. Bolts shall be considered long enough if the bolt point is flush with or outside the face of the nut.
8. When specified by the design output document, TVA's alternative for visual welding acceptance criteria will be NCIG-01, May 7, 1985, Revision 2, 'Visual Weld Acceptance Criteria for Structural Welding of Nuclear Power Plants."
9. For modifications or repairs to structures within the scope of N45.2.5-1974, plant management shall refer to the Site Engineering organization for any design analyses.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 101 of 113 APPENDIX B Page 22 of 23 Table 2 REGULATORY GUIDE CONFORMANCE STATUS

10. Verification of preweld activities, including fit-up, will be verified through a graded QC inspection program, unless 100 percent inspection is specified in design output documents.
11. Much of N45.2.5 applies to construction and preoperational testing. As a result, many of the listed tests are not appropriate in an operational plant. In lieu of this, TVA utilizes the appropriate engineering organizations to establish the need for specific tests or test procedures during the operational phase, and the guidance provided in ANSI N45.2.5-1974 is considered for applicability.
12. TVA implements the requirements of N45.2.5 Section 3, 4, and 5 with a performance-based graded QA verification program consisting of quality control inspection, line verification, and quality assessments.

NRC Regulatory Guide 1.116 - Quality Assurance Requirements for the Installation, Inspection, and Testing of Mechanical Equipment and Systems," 6176, endorses ANSI N45.2.8-1975.

The NQAP follows this Guide with the following alternatives:

1. QA programmatic/administrative requirements included in the Regulatory Guide shall apply to construction, maintenance, and modification activities. Technical requirements associated with maintenance and modifications shall be the original requirements or better (e.g., code requirements, material properties, design margins, manufacturing processes, and types of inspection requirements).
2. Much of N45.2.8 applies to construction and preoperational testing. As a result, many of the listed tests are not appropriate in an operational plant. In lieu of this, TVA utilizes the appropriate engineering organizations to establish the need for specific tests or test procedures during the operational phase and the guidance provided in ANSI N45.2.8-1975 is considered for applicability.
3. TVA implements the requirements of N45.2.8 Sections 4.4 and 5.1 with a performance-based, graded QA verification program consisting of quality control inspection, line verification, and quality assessments.

NRC Regulatory Guide 1.123 - Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants," Revision 1, 7/77, endorses ANSI N45.2.13-1976.

The NQAP follows this Guide with the following alternative:

Section 4.2 - In the special case of 'commercial grade items: the supplier may not be evaluated by one of the methods identified; however, the procurement documents shall contain acceptance requirements (special receipt inspection requirements, special tests, or functional tests) specific to the item being procured. The acceptance (dedication) of commercial grade items intended for safety-related applications meets the intent of EPRI NP-5652 as accepted by the NRC.

Section 7.5 - Personnel responsible for performing verification activities are qualified in accordance with ANSI N45.2.6 or ANSI N45.2.23 as applicable.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 102 of 113 APPENDIX B Page 23 of 23 Table 2 REGULATORY GUIDE CONFORMANCE STATUS NRC Regulatory Guide 1.144 - "Auditing of Quality Assurance Programs for Nuclear Power Plants,"

Revision 1, 9/80, endorses ANSI N45.2.12-1977.

The NQAP follows this Guide with the following alternatives:

1. Paragraph 2.3 - Technical specialists who assist in performing audits in their area of special expertise will perform their audit duties under the supervision of a certified lead auditor.
2. TVA implements the requirements of Regulatory Guide paragraph C.3.a and Sections 3.4 and 3.5 of ANSI N45.2.12 with a performance-based, graded QA audit program. Real time adjustments are made to the audit scope, depth, and frequency based on an item's or subject's importance to safety and performance history. Real-time adjustments allow emphasis to be placed in areas where performance is weak and decrease emphasis where performance is evaluated to be good.
3. Section 4.5.2 - NA will have a certified lead auditor or a manager of the auditor either conduct the required follow-up or attest to the acceptability of the follow-up conducted by audit personnel.

NRC Regulatorv Guide 1.146 - "Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants," 8/80, endorses ANSI N45.2.23-1978.

The NQAP follows this Guide with the following alternative:

1. In addition to the State agencies and technical societies recognized by ANSI N45.2.23, Section 2.3.1.3, TVA may grant two points for professional competency to those individuals licensed as either a Reactor Operator (RO) or Senior Reactor Operator (SRO) by the NRC.
2. Replace Section 2.3.4 of ANSI N45.2.23 with the following:

"Prospective Lead Auditors shall demonstrate their ability to effectively implement the audit process and effectively lead an audit team. This process is described in written procedures which provide for evaluation and documentation of the results of this demonstration. A prospective Lead Auditor shall participate in at least one nuclear quality assurance audit within the year preceding the individuals effective date of qualification."

NRC Regulatory Guide 1.152 - "Criteria For Programmable Digital Computer System Software in Safety-Related Systems of Nuclear Power Plants," November 1985, endorses ANSI/IEEE-ANS-7-4.3.2-1982.

The NQAP follows this Guide consistent with Section D of the Guide, with the following alternative:

For programmable digital computer system software installed in safety-related protection systems, TVA will follow this guide for the verification and validation of program elements specified in Sections 13.2.G and 13.2.H of the Nuclear Quality Assurance Plan.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 103 of 113 APPENDIX C Page 1 of 4 GUIDELINES FOR DETERMINATION OF TVA IDENTIFIED QUALITY-RELATED CLASSIFICATIONS

1.0 INTRODUCTION

The guidelines for classifying components, systems, and activities as quality-related depend on the relationship of the terms quality-related and safety-related as discussed in 2.0 and 3.0 below.

The guidelines are contained in Section 4.0 of this Appendix.

2.0 QUALITY-RELATED Quality-related (QR) is a term which encompasses quality assurance program requirements that describe activities which affect structures, systems, and components. These requirements provide reasonable assurance that the facility can be operated without undue risk to the health and safety of the public. In addition to safety-related structures, systems, components, and activities, the term "quality-related" encompasses the broad class of plant features covered (not necessarily explicitly) in the General Design Criteria of 10 CFR 50, Appendix A, that contribute in an important way to the safe operation and protection of the public in all phases and aspects of facility operation (i.e., normal operation and transient control as well as accident mitigation).

Quality-related is more encompassing than the term safety-related. Appendix D shows the scope of the NQAP. All quality-related items and activities are not necessarily safety-related. Appendix D illustrates the programmatic relationships.

3.0 SAFETY-RELATED Use of the term safety-related (or variations thereof) and the methodology for classifying items and activities as safety-related has been established in the General Design Criteria and Safety Analysis Report for TVA's Browns Ferry, Sequoyah, Watts Bar, and Bellefonte Nuclear Plants.

The term safety-related as used in this Appendix, this Plan and in NQAP documents is generic in nature.

Items and activities classified as safety-related are subject, without exception, to the requirements of 10 CFR 50, Appendix B. All safety-related items and activities are also quality-related.

4.0 GUIDELINES Some items and activities are classified as quality-related but not safety-related. However, because some items and activities classified as quality-related are considered important to the continued reliable operation of TVA's nuclear facilities, TVA shall apply the requirements of all or selected parts of the NQAP to such items and activities.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/3112004 Page 104 of 113 APPENDIX C Page 2 of 4 4.1 Structures, systems, and components shall be classified as quality-related but not safety-related if they fit one or more of the following categories:

A. Contain radioactive material and have not been identified as safety-related.

B. Are required byANS 3.2/ANSI N18.7-1976, "Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants," and are not identified as safety-related (e.g., plant security system).

C. Are fire protection features that provide protection for safety-related structures, systems, or components.

D. Are structures, systems, and components that have environmental or operability requirements important to the safe operation of the unit (as specified in the Plant Technical Specifications).

E. Are structures, systems, and components that could impact reliability and operability goals recommended by TVAN management and approved by the Chief Nuclear Officer and Executive Vice President, TVA Nuclear.

4.2 Those components or systems designated as Seismic Category l(L) (Class II for BFN) in nuclear plant FSARs shall be classified as quality-related. Seismic Category l(L) is the nonsafety-related portion of Seismic Category I. (Refer to Appendix D.)

4.3 Additional components or systems, not identified in the FSARs as NNS or Seismic Category l(L,)

can be designated as quality-related but not safety-related. Such additional components or systems could include the following:

A. Plant security system.

B. Plant radiological controls and radwaste systems.

C. Other structures, systems, and components which have special environmental or operability requirements.

D. Structures, systems, or equipment designated by TVAN management as requiring some level of quality control because of their importance to plant reliability or operability.

4.4 Items to which one or more of the following regulatory documents are applicable should be considered for classification as quality-related.

A. Regulatory Guide 1.143, "Design Guidance for Radioactive Waste Management Systems, Structures, and Components Installed in LightWater-Cooled Nuclear Power Plants."

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 105 of 113 APPENDIX C Page 3 of 4 B. 10 CFR 71, Subpart H, "Quality Assurance (Packaging and Transportation of Radioactive Material)."

C. Regulatory Guide 1.29, "Seismic Design Classification."

D. 10 CFR 73.55, "Requirements for Physical Protection of Licensed Activities in Nuclear Power Reactors Against Radiological Sabotage."

E. 10 CFR 50.62, "Requirements for Reduction of Risk From Anticipated Transients Without Scram (ATWS) Events for Light-Water-Cooled Nuclear Power Plants."

F. 10 CFR 50, Appendix R, "Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979."

G. ANS 3.2/ANSI N18.7-1976, "Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants."

H. Regulatory Guide 1.33, Revision 2, February 1978, "Quality Assurance Program Requirements (Operation)."

I. NRC letter from H. J. Thompson, Jr., dated April 16, 1985, "Quality Assurance Guidance for ATWS Equipment That is Not Safety Related," Generic Letter 85-06, (A02 850422 044).

J. NRC letter from D. G. Eisenhut dated April 24, 1986, "Implementation of Fire Protection Requirements," Generic Letter 86-10 (A02 860512 005).

K. NUREG 0737, "Clarification of TMI Action Plan Requirements."

L. NUREG 0800, Section 9.5.1, Branch Technical Position, CMEB 9.5-1 (formerly BTP ASB 9.5-1), Revision 2, July 1981, "Fire Protection for Nuclear Power Plants."

M. 10 CFR 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel and High-level Radioactive Waste.

4.5 New systems (or items being added as a result of approved modifications) shall be classified on the same basis as the existing components or systems.

4.6 Classification of components or systems as quality-related but not safety-related shall be performed in accordance with approved corporate or site engineering procedures or at TVAN management direction.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 106 of 113 APPENDIX C Page 4 of 4 5.0 Classification of Dry Cask Storage System The Dry Cask Storage System is engineered to provide safe storage of spent fuel on the ISFSI pad. These components will be designated as important to Safety (ITS) classification category A, B, C in accordance with NUREG/CR-6407. For procurement purposes, 10 CFR 21 will apply to 10 CFR 72 ITS category A and B components. For on site activities 10 CFR 72 ITS Category A and B components will be treated as safety-related under TVAN's existing QA Program. Similarly, 10 CFR 72 ITS Category C components will be treated as quality-related but not safety-related.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 107 of 113 APPENDIX D Page 1 of I SCOPE OF NUCLEAR QUALITY ASSURANCE PROGRAM This diagram displays the relationship of safety-related to quality-related items and activities. Examples of these items and activities are shown. It is not intended to show each specific item and activity within the scope of the Nuclear QA Program.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 108 of 113 APPENDIX E Page 1 of I COMPUTER SOFTWARE The requirements of Section 13.0 apply to application software which performs any of the following:

1. Directly operate safety-related plant equipment.
2. Generates design output for the design of safety-related or quality-related functions, structures, systems, or components.
3. Used by control room personnel, without further verification, to make plant operating decisions affecting:
a. The integrity of the reactor coolant pressure boundary.
b. The capability to shutdown the reactor and maintain it in a safe condition.
c. The capability to prevent or mitigate the consequences of accidents that could result in potential offsite exposure comparable to the 10 CFR 100 guidelines.
4. Perform calculations, the results of which are used, without further verification to operate, maintain, inspect, or test safety-related or quality-related structures, systems, and components.
5. Performs engineering calculations, the results of which are used, without further verification to support the design of safety-related and quality-related structures, systems, and components.
6. Generates output used to procure safety- or quality- related items.
7. Maintains, controls, or distributes information to be used without further verification in the procurement, design, operation, and maintenance of safety-related or quality-related structures, systems, and components.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 109 of 113 APPENDIX F Page 1 of 1 DEFERRED PLANT EQUIPMENT POLICY

Background

TVA's integrated resource plan - Energy Vision 2020 - identifies the need for a flexible range of options and alternatives required to meet, among other things, the Tennessee Valley region's base-load power supply needs through the year 2020. Until the decision on generating options to meet future load forecast are finalized, maintaining BLN Units 1 & 2 and WBN Unit 2 in a deferred status is consistent with TVA's need to maintain a flexible range of generating options. In the event TVA plans to reactivate construction at any of these units, NRC will be notified by letter as specified in Generic Letter 87-15.

Policy Equipment age will be an important factor in determining suitability for use in the event of construction restart of deferred units. Some other factors include age degradation due to design life, outdated or obsolete equipment, design improvements, and economic feasibility to replace rather than preserve indefinitely the equipment under the lay-up program. For these reasons, TVA may terminate lay-up preventative maintenance on selected equipment without further notification to NRC by entering the equipment into the corrective action program as deferred equipment. This allows the equipment to be abandoned in place as deferred equipment rather than stored in place until further decision is made regarding plant construction restart. Deferred equipment is not tagged since work controls on deferred units do not allow equipment to be placed in service at operating units without further evaluation and equipment disposition. Any deferred equipment shall be prohibited from use in nuclear safety-related applications unless compliance is fully restored in accordance with implementing procedures.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 110 of 113 APPENDIX G Page 1 of 1 TYPES OF CONTROLLED DOCUMENTS AND MANUALS

1. Design Specifications and Drawings
2. Safety Analysis Reports for the 10 CFR 50 Reactor Power Facilities
3. Program Manuals
4. Plant Instructions
5. Radiological Protection Plan
6. Nuclear Engineering Procedures Manual
7. Site Engineering Project Manuals
8. ASME Section III Quality Assurance Manual
9. Nuclear Procedures System Manuals
10. As-built Documents
11. Computer Programs
12. Nonconformance Reports
13. Nuclear Quality Assurance Plan
14. System Descriptions
15. Topical Report
16. Safety Analysis Reports for the 10 CFR 72 ISFSI Facilities

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 111 of 113 APPENDIX H Page 1 of 2 TVA NQAP ORGANIZATION CHARTS BOARD OF DIRECTORS CHAIRMAN PRESIDENT EXECUTIVE AND VICE PRESIDENT, CHIEF OPERATING OFFICER ADMINISTRATION I

CHIEF NUCLEAR OFFICER SENIOR AND VICE PRESIDENT EXECUTIVE VICE PRESIDENT, PROCUREMENT TVA NUCLEAR ENGINEERING AND TECHNICAL SERVICES VICE PRESIDENT NUCLEAR SUPPORT VICE PRESIDENT NUCLEAR OPERATIONS SENIOR VICE PRESIDENT BROWNS FERRY UNIT 1 RESTART VICE PRESIDENT

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 112 of 113 APPENDIX H Page 2 of 2 TVA NQAP ORGANIZATION CHARTS CHIEF NUCLEAR OFFICER

__________________ _ AND EXECUTIVE VICE PRESIDENT.

TVA NUCLEAR I I I

I NUCLEAR SUPPORT VICE PRESIDENT ENG TEC. INEERING AND VIc NICAL SERVICES NUCLEAR OPERATIONS SENIOR VICE PRESIDENT L BROWNS FERRY UNIT I RESTART VICE PRESIDENT L X NUCLEAR SECURITY

] BELLEFONTE NUCLEAR PLANT MAINT. MANAGER BROWNS FERRY NUCLEAR PLANT VICE PRESIDENT I I CONCERNS RESOLUTION

] CHIEF ENGINEER BROWNS FERRY NUCLEAR PLANT VICE PRESIDENT I

NUCLEAR BUSINESS SERVICES ] NUCLEAR FUELS MANAGER SEQUOYAH NUCLEAR PLANT VICE PRESIDENT

~NUCLEAR_ STEAM GENERATOR AND REACTOR WATTS BAR PROJECTSNULA PRESSURE VESSELS NUCLEAR PLANT CAPITAL TECHNOLOGY VICE PRESIDENT I _ CONTROLS MANAGER I__ NUCLEAR INSPECTION SERVICES ASSURANCE MANAGER RADIOLOGICAL AND CHEMISTRY SERVICES CORPORATE NUCLrAP. IICEN.SIN. I MANAGER Independent reporting to the Chief Nuclear Officer and Executive Vice President. TVA Nuclear, on quality status and issues.

NUCLEAR QUALITY ASSURANCE PLAN TVA-NQA-PLN89-A REV. 14 - 08/31/2004 Page 113 of 113 APPENDIX I Page 1 of I BFN UNIT 1 RESTART ORGANIZATIONAL MATRIX I

NQA Plan Sections Responsible 5.1.B 5.1.C 6.1.3.A 7.3 9.1.3.B 9.3.3.A 9.3.3.0 9.4.3.A 9.4.3.B 9.5.3.B 9.7.3.A 9.7.3.B 9.7.3.0 9.8.3.C 10.3.A 11.3.B 13.3 Position From NQA Plan Senior VP Nuclear VP U-1 VP U-1 VP U-1 VP U-1 VP U-1 VP U-1 VP U-1 Operations Restart Restart Restart Restart Restart Restart Restart VP, Engineering VP U-1 and Technical Restart Services Site VP VP U-1 VP U-1 VP U-1

. Restart Restart Restart _

Chief Engineer U-1 U-1 U-1 U-1 U-1 U-1 Restart Restart Restart Restart Restart Restart Engr. Engr. Engr. Engr. Engr. Engr.

MgrMgr

_ Mgr Mgr Site Engineering U-1 U-1 U-1 U-1 and Materials Restart Restart Restart Restart Manager Engr. Test Test Engr.

Mgr . Mgr Mgr Mgr Line Managers All U-1 All U-1 Line Line Mgrs. Mgrs.

Positions identified in the above matrix have the same responsibilities as those in the corresponding section of the NQA Plan for the Unit 1 Restart organization.

ENCLOSURE 3 TVA NUCLEAR ORGANIZATION DESCRIPTION

Topical Report TVA-NPOD89-A Rev. 13 ORGANIZATION DESCRIPTION LIST OF REVISIONS REVISION 0 June 1, 1989 REVISION 1 August 13, 1990 REVISION 2 April 18, 1991 REVISION 3 April 17, 1992 REVISION 4 December 27, 1993 REVISION 5 December 16, 1994 REVISION 6 June 29, 1995 REVISION 7 June 27, 1997 REVISION 8 August 25, 1999 REVISION 9 August 25, 2000 REVISION 10 August 24, 2001 REVISION 11 August 26, 2002 REVISION 12 August 22, 2003 REVISION 13 August , 2004

Topical Report TVA-NPOD89-A Rev. 13 CONTENTS List of Figures ............................................. iii Abstract . .................................................... iv Introduction .......... ........................................ v 1.0 Corporate Organization ........................................ 1 1.1 TVA Nuclear . .................................................. 1 1.2 Chief Nuclear Officer and Executive Vice President .... ........ 1 1.3 General Managers, Materials Management Services and Contracts . 2 1.4 Vice President, Operations Support ............................ 2 1.5 Vice President, BFN Unit 1 Restart ........................... 4 2.0 Vice President, Engineering and Technical Services ......... ..11 2.1 Corporate Engineering .11 2.2 Civil/Structural Engineering .12 2.3 Mechanical/Nuclear Engineering .12 2.4 Electrical/Instrumentation and Control Engineering ... ....... .12 2.5 Nuclear Materials Technology/Codes ........................... 13 2.6 Inspection Services .......................................... 13 3.0 Senior Vice President, Nuclear Operations .................... 15 3.1 General Manager, Process Methods ............................. 15 3.2 Manager, Plant Operational Reliability ....................... 15 3.3 Manager, Plant Process Reliability ........................... 16 3.4 Manager, Computer Engineering ................................ 16 3.5 Vice President, Browns Ferry Site ............................ 18 3.6 Vice President, Sequoyah Site ................................ 26 3.7 Vice President, Watts Bar Site .............................. 34 4.0 Vice President, Nuclear Support .............................. 42 4.1 Manager, Business & Project Services ......................... 42 4.2 Manager, Emergency Services .................................. 42 4.3 Manager, Nuclear Assurance and Licensing ..................... 43 4.4 Manager, Bellefonte Maintenance .............................. 44 ii

Topical Report TVA-NPOD89-A Rev. 13 LIST OF FIGURES Figure 1-1 TVA Corporate Organization .................................. 7 Figure 1-2 TVA Nuclear ................................................. 8 Figure 1-3 Browns Ferry Nuclear Plant Unit 1 Restart ................... 9 Figure 1-4 Operations Support ......................................... 10 Figure 2-1 TVAN, Engineering and Technical Services ................... 14 Figure 3-1 TVAN, Nuclear Operations ................................... 17 Figure 3-2 Browns Ferry Nuclear Plant, Site Vice President ............ 24 Figure 3-3 Browns Ferry Nuclear Plant, Plant Manager .................. 25 Figure 3-4 Sequoyah Nuclear Plant, Site Vice President ................ 32 Figure 3-5 Sequoyah Nuclear Plant, Plant Manager ...................... 33 Figure 3-6 Watts Bar Nuclear Plant, Site Vice President ............... 40 Figure 3-7 Watts Bar Nuclear Plant, Plant Manager ..................... 41 Figure 4-1 TVAN, Nuclear Support ...................................... 45 iii

Topical Report TVA-NPOD89-A Rev. 13 ABSTRACT The TVA Nuclear (TVAN) Organization Description (TVA-NPOD89-A) includes organization descriptions for Browns Ferry (BFN), Sequoyah (SQN), Watts Bar (WBN), and Bellefonte Nuclear (BLN) Plants. This report contains the senior management, technical support and operating organization descriptions, and organization charts that meet the "content" guidance of NRC's Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants - LWR Edition, Rev. 3 (November 1978).

Qualifications requirements and training descriptions specified in the standard format document will continue to be addressed in each plant's Final Safety Analysis report. The detailed TVA nuclear assurance organization and program description is contained in the TVAN Quality Assurance Plan (TVA-NQA-PLN89-A) and is not repeated herein.

iv

Topical Report TVA-NPOD89-A Rev. 13 INTRODUCTION The original purpose of the TVAN Organization Description TVA-NPOD89-A was to establish a controlled, single source document and a disciplined process for communicating organization structure and position descriptions to the Nuclear Regulatory Commission (NRC). TVA-NPOD89-A will be referenced in future revisions of our license applications including the Safety Analysis Reports, Technical Specifications, the Nuclear Quality Assurance Plan, and other documents that may refer to the TVAN organization. This topical report will be revised as necessary to reflect major organizational changes. Since this topical report encompasses multiple plants, subsequent updates to the topical report will be filed on a yearly basis to ensure that TVA meets the refuel cycle criterion of 10 CFR 50.71(e) for each unit at each site.

v

Topical Report TVA-NPOD89-A Rev. 13 TENNESSEE VALLEY AUTHORITY (TVA) 1.0 Corporate Organization TVA is an agency of the federal government whose major policies, programs, and organization are determined by a full-time, three-member Board of Directors. Members of the Board are appointed by the President and confirmed by the Senate for nine-year terms. The Board of Directors is assisted by TVA's Executive Committee, which shapes long-term business strategies, recommends major program initiatives, and guides the day-to-day operations. The Corporate organization is shown in Figure 1-1.

1.1 TVA Nuclear (TVAN)

The TVAN organization is responsible for nuclear plant engineering and design, construction, operation, quality assurance, and compliance with regulatory requirements. TVAN plans and manages the nuclear program to meet the requirements of TVA's power program consistent with safety, environmental, quality, and economic objectives. The general organization of TVAN is shown in Figure 1-2.

1.2 Chief Nuclear Officer and Executive Vice President, TVAN (CNO &

EVP)

The CNO & EVP is the senior nuclear manager with direct authority and responsibility for the management, control, and supervision of TVA's nuclear power program and for the execution of nuclear programs, policies, and decisions that the Board of Directors approves or adopts. The CNO & EVP reports directly to the President and Chief Operating Officer (COO). The President and COO reports directly to the TVA Board of Directors.

The CNO & EVP is responsible for the overall safety, efficiency, and economy of nuclear operations. The CNO & EVP establishes management and operating policies and procedures related to TVA's nuclear program and is responsible for personnel, planning, scheduling, licensing, engineering and design, construction, operation, quality assurance, training, maintenance, technical, and administrative matters related to this program. The CNO & EVP coordinates the activities and functions of TVAN with other TVA organizations in order to carry out TVA's corporate policy and to meet corporate goals and objectives. This position is responsible for all aspects of TVA's interface and relations with the NRC and other entities with jurisdiction over or interest in TVA's nuclear program.

The CNO & EVP is responsible for the development and implementation of an effective radiological emergency preparedness program; directing shutdown of nuclear facilities when deemed appropriate; and the development of long-range, strategic plans for all TVAN programs, activities, and facilities.

1

Topical Report TVA-NPOD89-A Rev. 13 The CNO & EVP is assisted in carrying out these responsibilities by the Senior Vice President, Nuclear Operations; Vice President, BFN Unit 1 (Ul); Vice President, Engineering and Technical Services; and the Vice President, Nuclear Support. The Vice Presidents' functions are described in the following sections.

Concerns Resolution has direct access to the CNO & EVP on employee concerns. This provides the Concerns Resolution Program sufficient independence and freedom to ensure that concerns are properly addressed.

Nuclear Assurance & Licensing (NA&L) has direct access to the CNO &

EVP and the appropriate levels of management. This organization has sufficient independence and organizational freedom to be able to effectively ensure conformance to quality assurance program requirements.

Additionally, the Vice President, Operations Support (OS), provides support to the CNO & EVP in the areas of HR Operation, Safety, Technical Training, Work Force Planning, Work Force Information Management, and Program Support. The Vice President, OS, reports to the President and Chief Operating Officer. Functions are discussed below in paragraph 1.4.

1.3 General Managers, Materials Management Services and Contracts The General Manager, Materials Management Services and the General Manager, Contracts, report directly to the Senior Vice President, Procurement, and report functionally to the Site Vice Presidents.

These managers provide procurement, contracts, and material management direction and support.

1.4 Vice President, Operations Support (OS)

The Vice President, OS, reports to the President & Chief Operating Officer and is responsible for the general management of HR Operations, Safety, Technical Training, Work Force Planning, Work Force Information Management, and Program Support for these activities. The Vice President, OS, has five principal reports and administers responsibilities through them. These principal reports are as follows:

HR Operations Senior Manager COO Safety Senior Manager Employee Technical Training and Organizational Effectiveness Senior Manager Work Force Planning Manager Work Force Information Management Manager See Figure 1-4 for the OS organization chart.

2

Topical Report TVA-NPOD89-A Rev. 13 1.4.1 Human Resource (HR) Operations Senior Manager The HR Operations Senior Manager leads a strategic and consolidated HR Program delivery service for the COO organization. This manager is responsible for developing, coordinating, directing, and managing a viable HR Program for the COO organization, which includes TVAN. This manager implements these services for TVAN through two regional HR Service Managers who maintain a staff providing HR services including compensation, staffing, employee relations, benefits, manpower planning, and Equal Employment Opportunity/Affirmative Actions Programs. The HR Service Managers for Nuclear Generation and COO Corporate provide support for the nuclear sites and nuclear corporate organizations.

In conjunction with the Work Force Planning Manager, the HR Service Manager is responsible for managing the work force planning function to ensure proper staffing and skill requirements to meet business needs. This manager is also responsible for: (1) ensuring an active succession planning process is in place, (2) continually monitoring and making strategic recommendations for replacement planning, and (3) ensuring development activities are identified for progression candidates' needs. In addition, this manager develops and implements a vision for cultural change at respective site levels in support of the TVAN vision and Business Plan. This manager also directs the development and implementation of programs to ensure fair treatment of employees to support the desired performance changes as well as regulatory or legal requirements. This position ensures employees concerns and complaints are addressed in a timely fashion while administering employee relations program (positive discipline, work policies, etc.).

1.4.2 COO Safety Senior Manager The COO Safety Senior Manager manages, directs, and designs strategic direction of health and safety processes for the COO organization. This manager implements these functions through four regional COO Safety Managers who maintain staffs which support the manager in directing activities to ensure the effectiveness of TVAN's Industrial Safety Program. These positions are responsible for implementing regulatory requirements and commitments applicable to the program, conducting accident investigations, program evaluations, implementation of policy, performance assessments and reporting, and providing and documenting training for nuclear personnel.

3

Topical Report TVA-NPOD89-A Rev. 13 1.4.3 Employee Technical Training and Organizational Effectiveness Senior Manager The Technical Training Manager is responsible for sharing best practices and standardization of training processes across TVA and for providing interventions that increase organizational effectiveness. Specific TVAN training functions are described in respective sections of this report for each site.

1.4.4 Work Force Planning Manager The Work Force Planning Manager manages the work force planning process. In conjunction with HR Services Managers, this manager establishes process standards for assessing business and customer needs, forecasting recruitment needs, profiling staffing availability, trending and analyzing data, and analyzing labor costs to support line managers in decision making.

1.4.5 Work Force Information Management Manager The Work Force Information Management Manager is responsible for defining the standards for information management flow and reporting.

1.4.6 Program Support Personnel These positions establish and manage a strategic and consolidated approach to program development and implementation of HR Program initiatives.

1.5 Vice President, BFN U1 Restart The Vice President, BFN U1 Restart reports directly to the CNO &

EVP. This manager provides general management and oversight of all activities for the BFN U1 restart including engineering, modifications, operations, maintenance, site support, operations and maintenance recovery support, and training, to ensure safe and efficient recovery of the BFN U1. The Vice President U1 Restart also ensures thorough and complete coordination and integration with the BFN operating units in compliance with TVAN policies and procedures, plant technical specifications, and federal, state, and local regulations. The Vice President has five principal reports and administers responsibilities through them. These reports are:

BFN U1 Plant Restart Manager Engineering Restart Manager Maintenance and Modifications Restart Manager Cost and Project Management Restart Manager Project Support Restart Manager 4

Topical Report TVA-NPOD89-A Rev. 13 The Site Nuclear Assurance (NA) and Site Licensing and Industry Affairs Managers have a functional reporting relationship to the Vice President, BFN U1 Restart. See Figure 1-3 for the BFN U1 Restart organization chart.

1.5.1 BFN U1 Plant Restart Manager The BFN Ul Plant Restart Manager is responsible for managing the BFN Ul restart activities including system turnover, operational readiness, and radiation controls. The U1 Plant Restart Manager ensures efficient integration and coordination with the BFN operating units in compliance with TVAN policies and procedures, plant technical specifications, and federal, state and local regulations. Manages restart activities to avoid adverse impacts on the operating units.

1.5.2 Engineering Restart Manager The Engineering Restart Manager is designated as the Design Authority for U1 restart activities. The Engineering Restart Manager is responsible for management of the BFN U1 Restart project to provide engineering for the establishment of the design basis, analytical methods, engineering design, systems engineering, restart test, technical support, components test and inspection functions on the project. Specifically, this manager is responsible for managing activities necessary for design basis reconciliation, design criteria development, analytical basis/restart programs developed and worked to closure, within budget, on schedule, in accordance with federal and state regulations and TVA policies and procedures, and in a manner to maintain technical integrity and fidelity with BFN U2 and U3.

1.5.3 Maintenance and Modifications Restart Manager The Maintenance & Modifications Restart Manager is responsible for managing the BFN U1 Maintenance and Modifications organization to provide modifications, facilities, predictive, corrective, and preventive maintenance technical support to ensure safe and efficient restart of BFN U1 in accordance with TVAN policies and procedures, plant technical specifications, and federal, state, and local regulations.

1.5.4 Cost and Project Management Restart Manager The Cost and Project Management Restart Manager is responsible for managing the development of schedules, performance analysis, budget, project management, plant interfaces, and accounting services at the site to support the BFN U1 Restart activities, ensuring that managed activities are conducted in accordance with all applicable TVA policies, programs, and procedures, and federal, state, and local regulations.

5

Topical Report TVA-NPOD89-A Rev. 13 1.5.5 Project Support Restart Manager The Project Support Manager Restart is responsible for establishing and managing all project support and technical services for the BFN U1 Restart. This includes drawing improvement and Cad drafting, engineering records, administration support/Corrective Action Program (CAP)/Self Assessment Program/EIP, integration task management, methods/processes/procedures development and maintenance, Information Services, and acquisition and inventory/contracts management. This manager ensures that all managed activities are conducted in accordance with regulatory requirements and TVA policies and procedures.

1.5.6 Site Nuclear Assurance (NA)

The Manager, Site NA, provides oversight of quality activities associated with the operation of BFN.

Responsibilities are described in detail in TVA's Nuclear Quality Assurance Plan (TVA-NQA-PLN89-A). This position reports to the Manager, Corporate NA&L 1.5.7 BFN Site Licensing and Industry Affairs The Manager, BFN Site Licensing and Industry Affairs, provides licensing services associated with the operation of BFN. This position serves as the primary interface with the NRC for site-related matters. This position reports to the Manager, Corporate NA&L.

This manager is responsible for developing the vision and strategy for the site in the areas of the NRC, Institute of Nuclear Power Operations (INPO), Nuclear Energy Institute (NEI), and other industry interfaces. This manager is also responsible for managing the site Operating Experience Review Program and ensuring that the technical, programmatic evaluations, and in-depth analyses of in-house occurrences at TVA facilities and other industry sites which impact nuclear safety and reliability are completed and addressed as appropriate to prevent the recurrence of events.

6

Topical Report TVA-NPOD8 9-A Rev. 13 TENNESSEE VALLEY AUTHORITY CORPORATE ORGANIZATION President & Chief Operating Officer Vice Pren71 OperaonSu Figure 1-1 7

Topical Report TVA-NPOD8 9-A Rev. 13 TVA NUCLEAR l

Procurement Senior Vice President Sequoa I

1 l 1  !

I Materials Management Services &

Figure 1-2 Contracts General Manager 8

Topical Report TVA-NPOD8 9-A Rev. 13 BFN U1 RESTART ORGANIZATION VP U1 Restart Corporate Nuclear Assurance &

Licensing F- UPlnRetr Cot&PoetProect Suppor Maint. & Mods. Nuclea Eng. Restart Mgr.UPlantRestart Mgmt. Restart Restart Mgr. Restart Mgr.sngAs Figure 1-3 9

Topical Report TVA-NPOD8 9-A Rev. 13 OPERATIONS SUPPORT Vice President Operations Support e Tecnical Training & Work Force Information Work Force Planning, ram Suppor ational Effeciveness Management Manager Manager Figure 1-4 10

Topical Report TVA-NPOD89-A Rev. 13 ENGINEERING AND TECHNICAL SERVICES 2.0 Vice President, Engineering and Technical Services (E&TS)

The Vice President, E&TS, reports directly to the CNO & EVP and is responsible for establishing and directing all plant support activities for TVAN. This includes the responsibility for offsite independent reviews and audits. The Vice President, E & TS, serves as the Chairman of the Nuclear Safety Review Board (NSRB) and is responsible for developing and implementing procedures consistent with TVAN policy and NRC requirements to conduct independent nuclear safety assessments and reviews of TVA's nuclear plants. Individual safety review boards are in place for the BFN, SQN, and WBN. These boards are composed of senior TVA managers and advisors to the Chairman who are not employed by TVA. The Chairman directs independent safety reviews of TVA's nuclear plants and manages the activities of the NSRB. The functions of the NSRB are delineated in TVA Nuclear Quality Assurance Plan (TVA-NQA-PLN89-A). The Chairman or designee chairs each meeting of the NSRB, approves and transmits minutes of NSRB meetings, and issues reports consistent with the NSRB charter.

The Vice President, E&TS, has six principal reports and administers responsibilities through them. These principal reports are as follows:

Manager, Corporate Engineering Manager, Civil/Structural Engineering Manager, Mechanical/Nuclear Engineering Manager, Electrical/Instrumentation and Control (I&C) Engineering Manager, Nuclear Materials Technology & Codes Manager, Inspection Services See Figure 2-1 for the E&TS organization chart.

2.1 Manager, Corporate Engineering The Manager, Corporate Engineering, reports to the Vice President, E&TS, is the TVAN design authority, and is responsible for managing the activities of the nuclear engineering services for TVA Nuclear facilities ensuring that managed activities are conducted in accordance with appropriate regulations, TVA policies and procedures, and in a manner to maintain technical integrity of TVAN's facilities and to safeguard the health and safety of the general public, the environment, and TVA employees. This Manager is the design basis authority for all TVAN sites and is responsible for the following functions:

A. Configuration Management B. Design Basis Management and Control C. Design Change Control D. 10CFR50.59 Evaluations E. Design Input Control F. Design Output Control G. Design Verification 11

Topical Report TVA-NPOD89-A Rev. 13 H. Calculation Control I. Use and Control of Design Standards and Guides J. Equipment Reliability and Performance Programs K. Site Support In addition to implementing the key functions listed above, the Site Engineering Manager is also responsible for the following key site program elements:

A. System Health Monitoring and Equipment History and Trending B. Support for Maintenance: Surveillance Testing and Maintenance Rule Monitoring C. Technical Evaluations for Procurement of Materials and Services D. Probabilistic Safety Assessment E. Support for Testing: Post-Modification, Component and System F. ASME Section XI Program Support and Interface with Authorized Inspection Agency G. Environmental and Seismic/Structural Qualification H. Maintain Corrosion Control Program I. Functional Evaluations J. Evaluate industry operating experiences and maintain participation in related industry programs which benefit multiple sites K. Review final or updated safety analysis report and technical specification changes 2.2 Manager, Civil/Structural Engineering The Manager, Civil/Structural Engineering manages the activities of Civil, Engineering Mechanics, and Metallurgical organizations to provide engineering services to TVA nuclear facilities. The primary responsibility is to maintain the site(s) design basis, plant configuration control and allocate design margins on safety related structure, system and components; ensure activities are conducted in accordance with appropriate regulations and TVA policies and procedures in a manner to maintain technical integrity of TVA's facilities; and to safeguard the health and safety of the general public, environment, and TVA employees.

2.3 Manager, Mechanical/Nuclear Engineering The Manager, Mechanical Engineering manages the activities of the Mechanical/Nuclear organization to provide engineering services to the TVA nuclear facilities. This position ensures managed activities are conducted in accordance with appropriate regulations and TVA policies and procedures, in a manner to maintain technical integrity of TVA facilities, and to safeguard the health and safety of the general public, the environment, and TVA employees. Primary responsibility is to maintain the site design basis, plant configuration control, and allocate the design margins on safety-related systems. The position manages design activities necessary to ensure plant design basis is maintained and ensures the nuclear and mechanical program proceeds in an effective and efficient manner.

12

Topical Report TVA-NPOD89-A Rev. 13 2.4 Manager, Electrical/I&C Engineering The Manager, Electrical/I&C Engineering manages the activities of the Electrical/I&C Engineering Departments to provide engineering services for TVA nuclear facilities to include the Electrical and I&C functions, ensuring that managed activities are conducted in accordance with appropriate regulations and TVA policies and procedures and in a manner to maintain technical integrity of TVA's facilities and to safeguard the health and safety of the general public, the environment, and TVA employees.

2.5 Manager, Nuclear Materials Technology & Codes The Manager, Nuclear Materials Technology & Codes directs and manages a dedicated technical group that develops strategic plans for addressing materials degradation. This group will focus on materials related issues associated with the preservation of Nuclear Steam Supply System (NSSS) and Balance of Plant components. Effective management of materials issues ensures that TVA's nuclear facilities are operated reliably, safely and efficiently in compliance with technical specifications, regulatory commitments, and within the design bases as defined in the Final Safety Analysis Report.

2.6 Manager, Inspection Services The Manager, Inspection Services, directs and manages the activities and resources of the Inspection Services organization to provide the resolution of technical problems, technical support, and requested nondestructive examination/quality control (NDE/QC) inspections of TVAN's power plants through the utilization of skilled examiners and level III overviews to ensure conformance with applicable ASME Codes, regulatory agency, and TVA guidelines and requirements. This manager provides NDE/QC technical support to address problems or special assignments such as new technical development or technology transfer. This manager also supports NDE/QC training and training development of specialized NDE/QC techniques. In addition, this manager represents TVA in NDE/QC matters with ASME, American National Standards Institute, American Welding Society, NRC, Electric Power Research Institute (EPRI), INPO, etc.

13

Topical Report TVA-NPOD8 9-A Rev. 13 TVA NUCLEAR ENGINEERING AND TECHNICAL SERVICES Engineering & Technical Services Vice President Nuclear Materials Corporate Civil/Structural Mechanical/Nuclear l Electicalll&C Technology & Codes Engineering Engineering Engineering Engineering Manager Manager Manager Manager Manager l I .l Engineering Support Mechanical/Nuclear Electdcal/l&C Design Civil/Structural Design Manager Manager Manager Manager License Renewal Nuclear Design Projects Site Engineering Program Manager Project Manager Managers Figure 2-1 14

Topical Report TVA-NPOD89-A Rev. 13 NUCLEAR OPERATIONS 3.0 Senior Vice President, Nuclear Operations The Senior Vice President, Nuclear Operations, reports to the CNO &

EVP and is responsible for the safe, efficient, and reliable operation of TVAN operating sites and reviews and concurs in plant staffing and organizational matters. This position ensures that managed activities are conducted in accordance with appropriate federal regulations and TVA policies and procedures.

The Senior Vice President, Nuclear Operations, has seven principal reports and administers responsibilities through them. These principal reports are as follows:

Vice President, BFN Vice President, SQN Vice President, WBN General Manager, Process Methods Manager, Plant Operational Reliability Manager, Plant Process Reliability Manager, Computer Engineering See Figure 3-1 for the Nuclear Operations organization chart.

3.1 General Manager, Process Methods The General Manager, Process Methods, is responsible for coordination of Process Methods' efforts for the TVAN organization.

The Process Methods organization's charge is to bring TVAN's focus on process improvement and peer team support to a higher level.

Process Method's focus on process improvement and peer team support is a key to adding depth and vision to our process improvement initiatives.

3.2 Manager, Plant Operational Reliability The Manager, Plant Operational Reliability is responsible for managing the TVAN Plant Operational Reliability Department to ensure critical TVAN equipment supports safe, reliable, and economic generation. This Manager establishes and has chief accountability for the TVAN Equipment Reliability Program; provides authoritative decisions and recommendations on behalf of TVAN regarding critical issues related to equipment reliability; consults and ensures resolution of issues with senior management level personnel, company officers and policy-making representatives 15

Topical Report TVA-NPOD89-A Rev. 13 from regulatory and industry organizations. The Manager is accountable for ensuring Business Plan Goals for generation, forced loss rate, and operating capacity are not impacted by equipment degradation or failure.

3.3 Manager, Plant Process Reliability The Manager, Plant Process Reliability, manages the TVAN Plant Process Reliability Department that include critical TVAN processes for Welding, Meteorological/Environmental, Radiological Control, Chemistry, and other areas as assigned. This Manager provides leadership and direction to achieve high reliability and standardization of TVAN processes to support both outage and non-outage operations at TVAN sites; provides authoritative decisions and recommendations on behalf of TVAN regarding critical issues related to his/her area of responsibility; consults and ensures resolution of issues with senior management level personnel, company officers and policy-making representatives from regulatory and industry organizations.

3.4 Manager, Computer Engineering The Manager, Computer Engineering, manages the organization which is responsible for supporting real-time computer systems for TVAN's quality-related programs and plant process monitoring and control applications. This support includes the definition and analysis of system requirements, the establishing of system performance criteria, system design and implementation, system integration and interfaces with plant systems and equipment, installation and testing, maintenance and modification, and configuration control activities. This manager implements a software quality assurance program which establishes the requirements and processes for the development, maintenance, and modification of real-time computer system software; establishes the infrastructure necessary to support real-time computer systems development and maintenance; establishes programmatic requirements and technical guidance for system development, modification, operation, maintenance, and configuration management functions for TVAN's real-time computer systems; establishes strategic direction and tactical plans for the application of real-time computer system technologies to TVAN's process monitoring/control systems, quality-related programs, and plant simulators. This manager provides technical oversight of TVAN's plant simulators to maintain fidelity of plant system models, simulator certification, and regulatory compliance.

16

Topical Report TVA-NPOD8 9-A Rev. 13 TVA Nuclear Nuclear Operations llNuclear Operations SR Vice President Sequoyah Watts Bar Proceq Vice President Vice President Gener, Plant Process Reliability Computer Engineering Manager Manager Figure 3-1 17

Topical Report TVA-NPOD89-A Rev. 13 BFN NUCLEAR PLANT 3.5 Vice President, BFN Site The Vice President, BFN Site, is responsible and accountable for activities at the site, including operations, modifications, maintenance, support, and engineering services. The Vice President, BFN Site, manages activities associated with BFN and determines the nature and extent of onsite and offsite support services required to support assigned site operations in accordance with TVAN policy and procedures. The Vice President, BFN Site, is responsible for the quality of work activities.

The Vice President, BFN Site, has two principal direct reports and administers responsibilities through them. These principal reports are as follows:

Manager, Engineering and Site Support Plant Manager The Site NA and Site Licensing and Industry Affairs Managers have a functional reporting relationship to the Vice President, BFN Site.

See Figure 3-2 for the BFN organization chart.

3.5.1 Engineering and Site Support The Manager, Engineering and Site Support, provides general programmatic management and direction for assigned organizations to ensure that necessary services are provided to support safe, reliable operations and are responsive to site schedules, priorities, and requirements.

This includes directing the development and management of Site Engineering, Nuclear Site Security, Site Emergency Preparedness, Project Management, Site Support and providing technical support to Operations, Maintenance, Modifications, Radiological Control, Chemistry, and the Plant Manager, in accordance with all federal, state, and local regulations.

a. Site Engineering The Manager, Site Engineering, is responsible for the development and management of Engineering Design, System Engineering, Engineering Support, Technical Support, Components Test and Inspection, Document Control and Records Management functions at the site.
b. Project Management The Manager, Project Management, is responsible for cost engineering functions including estimating, forecasting, trending/scope control, data analysis, and reporting. The Project Management Manager is responsible for ensuring 18

Topical Report TVA-NPOD89-A Rev. 13 technical and programmatic cost requirements of the site organizations (including contractors), site senior management, and TVA executive management are quantified, integrated, and supported by established processes to a high degree of consistency and reliability. The Project Management Manager also has responsibility for corporate employees assigned to the site who are responsible for the site's Information Services.

c. Site Support The Manager, Site Support, directs the work of corporate employees assigned to the site who are responsible for financial activities to provide the overall accounting, budget, and business reporting processes for all areas of activity at the site. In addition, the Site Support Staff is responsible for the development, implementation, and oversight of site analysis and reporting systems to report key indicators, compile data that can be utilized to reduce costs, and increase overall site effectiveness and efficiency. Additionally, the Site Support Staff is responsible for maintaining the site's CAP, which identifies and corrects problems and adverse conditions in a manner consistent with the nature of the conditions and its importance to plant safety or plant reliability.
d. Nuclear Site Security The Manager, Nuclear Site Security, is responsible for the management and direction of the Site Security Program to ensure security at the nuclear site and compliance with TVA and NRC requirements.
e. Site Emergency Preparedness The Manager, Site Emergency Preparedness is responsible for the site's Emergency Preparedness Program to ensure safety of TVA employees and the general public in the event of an accident at the nuclear facility.

3.5.2 Site Concerns Resolutions The Site Representative, Concerns Resolution, provides site employees with a means for reporting their concerns to a high-level within TVA's nuclear organization if, for any reason, the employees do not believe that their supervisors would properly respond to expressing concerns.

This position reports to the Corporate Manager, Concerns Resolutions, which provides the Concerns Resolution Program with sufficient independence and freedom to ensure that concerns are properly addressed.

19

Topical Report TVA-NPOD89-A Rev. 13 3.5.3 Site Nuclear Assurance (NA)

The Manager, Site NA, provides oversight of quality activities associated with the operation of BFN. Responsibilities are described in detail in TVA's Nuclear Quality Assurance Plan (TVA-NQA-PLN89-A). This position reports to the Manager, Corporate NA&L.

3.5.4 BFN Site Licensing and Industry Affairs The Manager, BFN Site Licensing and Industry Affairs, provides licensing services associated with the operation of BFN. This position serves as the primary interface with the NRC for site-related matters. This position reports to the Manager, Corporate NA&L.

This manager is responsible for developing the vision and strategy for the site in the areas of the NRC, INPO, NEI, and other industry interfaces. This manager is also responsible for managing the site Operating Experience Review Program and ensuring that the technical, programmatic evaluations, and in-depth analyses of in-house occurrences at TVA facilities and other industry sites which impact nuclear safety and reliability are completed and addressed as appropriate to prevent the recurrence of events.

3.5.5 Plant Manager The primary responsibility and authority for ensuring safe, reliable, and efficient plant operations in conformance and compliance with all federal, state, and local laws and regulations are vested in the Plant Manager. The Plant Manager is responsible for ensuring that hardware and software modifications or revisions, made subsequent to the original design or construction of the project, are authorized and carried out in accordance with procedures and instructions.

This position is responsible for ensuring that established acceptance criteria are satisfied before plant systems or components are returned to normal operation. The Plant Manager appoints the chairman and the members of the Plant Operations Review Committee (PORC). The Plant Manager is responsible for ensuring that adequate and complete records and reports are developed and maintained and that plant personnel are appropriately trained and qualified for their jobs.

The Plant Manager administers the principal areas of responsibility through the following managers:

Manager, Maintenance and Modifications Manager, Radiological Protection Manager, Chemistry/Environmental Assistant Plant Manager Manager, Outage & Scheduling Manager, Operations Manager, Training 20

Topical Report TVA-NPOD89-A Rev. 13 See Figure 3-3 for the Plant Manager's organization chart.

a. Maintenance and Modifications The Manager, Maintenance and Modifications, is responsible for planning, directing, and managing the plant's maintenance program to ensure that equipment and systems are maintained in accordance with operability and reliability engineering practices and requirements. This manager is responsible for major outage work and modifications. This position manages the development, implementation, and maintenance of the site measuring and test equipment tool rooms.

This manager is responsible for the maintenance and testing of the relaying associated with the transmission system, switchyard maintenance, generator protection, and the auxiliary power system. This manager is also responsible for the maintenance and testing of all in-plant radios, TI spans (digital method of voice or data transmissions), and all external plant communications systems (with the exception of the Bell system and AT&T equipment).

b. Radiological Protection The Manager, Radiological Protection, guides programs and activities at the plant ensuring that all operations, maintenance, modifications and engineering activities are conducted in a radiologically safe manner and protect plant systems and equipment. This includes developing, implementing, and managing the Site Radiological programs.

This manager guides technical assistance and project management activities in support of the site consistent with regulatory requirements. This manager develops and maintains procedures and applies standards necessary for the Radiological Protection programs.

This manager also supports the site training program and provides specialized training in radiological disciplines.

This manager is responsible for personnel radiation monitoring to ensure compliance with all applicable requirements. This manager is responsible for maintaining continuing records of personnel exposure, plant radiation and contamination levels. In addition, this manager is responsible for implementation of effective site programs for radiochemistry and radiological compliance.

c. Chemistry/Environmental The Manager, Chemistry/Environmental guides programs and activities at the plant ensuring that all operations, maintenance, modifications, and engineering activities are conducted in a manner consistent with applicable Federal and state regulations and protect the plant systems, equipment, and the environment.

21

Topical Report TVA-NPOD89-A Rev. 13

d. Assistant Plant Manager (APM)

The APM assumes full responsibility and accountability of the Plant Manager in the Plant Manager's absence. This is a developmental position for progression to Plant Manager.

There may be more than one APM position with any of the plant manager departments under their supervision.

e. Outage and Scheduling The Manager, Outage and Scheduling, has overall responsibility for outage planning, coordination, and monitoring. This manager plans all outages, establishes work priorities, and coordinates shift turnover. This manager is responsible for managing plant scheduling processes ensuring efficient, effective management of the work control function which is the basis of the site's schedule.
f. Operations The Manager, Operations, has responsibility for planning, organizing, setting policy, and motivation relating to Operations, and supporting activities (e.g., fire protection surveillances). These activities include operational strategies for generation, water and waste usage, approval authority for system enhancements, and prioritization of maintenance activities. To meet these objectives, functions related to Operations and supporting activities are grouped under one manager responsible for facility generation (i.e., Manager, Operations).

The Manager, Operations, has two principal reports:

Superintendent, Operations Superintendent, OS Superintendent, Operations The Superintendent, Operations, is responsible for all plant operations. The superintendent, through the shift managers, manages the day-to-day operation of the facility, refueling operations, start-up, operational testing, water and waste processing, and plant operations. The superintendent is responsible for coordinating and scheduling the training program for all Operations personnel as well as providing the nucleus for emergency response teams.

The shift crew for one unit operating normally consists of the Shift Manager (SRO), Unit Supervisor (SRO), Unit Operators (RO), and Assistant Unit Operators (AUOs).

Additional licensed and nonlicensed personnel are required 22

Topical Report TVA-NPOD89-A Rev. 13 for multi-unit operation. Additional operators are assigned as required by the Technical Specifications to meet the requirements of 10 CFR 50.54(m)(2). Plant management and technical support personnel will be present or on call at all times.

Superintendent, OS The Superintendent, OS, is responsible for budget preparation, training oversight, performance monitoring, and assists the Manager, Operations, in overall program direction for operations. The Supervisor, Fire Operations, with the overall responsibility for the Fire Protection Program, reports to the Superintendent, OS.

g. Training The Manager, Training, directs the planning, development, implementation, and evaluation of federally-regulated and nationally-accredited training programs to ensure sufficient qualified personnel to operate, maintain, and modify the nuclear power plant. The nuclear industry's training organization, the National Academy for Nuclear Training, has administrative and technical support provided by INPO, the industry's self-governance organization.

Through the Academy's National Nuclear Accrediting Board, all 12 applicable TVAN training programs in operations, maintenance, and technical training have been accredited.

Generally, maintaining Academy accreditation is sufficient to satisfy applicable federal regulations. Even more critical than meeting external expectations is the assurance that the nuclear power plant work force has been properly trained on a task-by-task basis to perform individual and team duties in an accurate, timely, and safe manner. This position is responsible for establishing, delivering, and maintaining such performance-based personnel training programs.

23

Topical Report TVA-NPOD8 9-A Rev. 13 BROWNS FERRY NUCLEAR PLANT SITE VICE PRESIDENT l

11 Site Vice President

[ Concems Resolution I

Project Site Engineering Site L Nuear Site Security

  • Site Emergency U Preparedness Management Manager Manager Manager Figure 3-2 24

Topical Report TVA-NPOD8 9-A Rev. 13 BROWNS FERRY NUCLEAR PLANT PLANT MANAGER j Outage and Scheduling Manager Figure 3-3 25

Topical Report TVA-NPOD89-A Rev. 13 SON NUCLEAR PLANT 3.6 Vice President, SQN The Vice President, SQN Site, is responsible and accountable for activities at the site, including operations, modifications, maintenance, support, and engineering services. The Vice President, SQN Site, manages activities associated with SQN and determines the nature and extent of onsite and offsite support services required to support site operations in accordance with TVAN policy and procedures. The Vice President, SQN Site, is responsible for the quality of work activities.

The Vice President, SQN Site, has three principal direct reports and administers responsibilities through them. These reports are:

Manager, Engineering and Site Support Plant Manager Manager, Steam Generator Replacement The Site NA and Site Licensing and Industry Affairs Managers have a functional reporting relationship to the Vice President, SQN Site.

See Figure 3-4 for the SQN organization chart.

3.6.1 Engineering and Site Support The Manager, Engineering and Site Support, provides general programmatic management and direction for assigned organizations to ensure that necessary services are provided to support safe, reliable operations and are responsive to site schedules, priorities, and requirements.

This includes directing the development and management of Site Engineering, Nuclear Site Security, Site Emergency Preparedness, Project Management, Site Support and providing technical support to Operations, Maintenance, Modifications, Radiological Control, Chemistry, and the Plant Manager, in accordance with federal, state, and local regulations.

a. Site Engineering The Manager, Site Engineering, is responsible for the development and management of the Engineering Design, System Engineering, Engineering Support, Technical Support, Components Test and Inspection, Document Control and Records Management functions at the site.
b. Project Management The Manager, Project Management, is responsible for cost engineering functions including estimating, forecasting, trending/scope control, data analysis, and reporting.

26

Topical Report TVA-NPOD89-A Rev. 13 The Project Management Manager is responsible for ensuring technical and programmatic cost requirements of the site organizations (including contractors), site senior management, and TVA executive management are quantified, integrated, and supported by established processes to a high degree of consistency and reliability. The Project Management Manager also has responsibility for corporate employees assigned to the site who are responsible for the site's Information Services.

c. Site Support The Manager, Site Support, directs the work of corporate employees assigned to the site who are responsible for financial activities to provide the overall accounting, budget, and business reporting processes for all areas of activity at the site. In addition, the Site Support Staff is responsible for the development, implementation, and oversight of site analysis and reporting systems to report key indicators, compile data that can be utilized to reduce costs, and increase overall site effectiveness and efficiency. Additionally, the Site Support Staff is responsible for maintaining the site's CAP, which identifies and corrects problems and adverse conditions in a manner consistent with the nature of the conditions and its importance to plant safety or plant reliability.
d. Nuclear Site Security The Manager, Nuclear Site Security, is responsible for the management and direction of the Site Security Program to ensure security at the nuclear site and compliance with TVA and NRC requirements.
e. Site Emergency Preparedness The Manager, Site Emergency Preparedness is responsible for the site's Emergency Preparedness Program to ensure safety of TVA employees and the general public in the event of an accident at the nuclear facility.

3.6.2 Site Concerns Resolutions The Site Representative, Concerns Resolution, provides site employees with a means for reporting their concerns to a high-level within TVA's nuclear organization if, for any reason, the employees do not believe that their supervisors would properly respond to expressing concerns.

This position reports to the Corporate Manager, Concerns Resolutions, which provides the Concerns Resolution Program with sufficient independence and freedom to ensure that concerns are properly addressed.

27

Topical Report TVA-NPOD89-A Rev. 13 3.6.3 Site Nuclear Assurance (NA)

The Manager, Site NA, provides oversight of quality.

activities associated with the operation of SQN.

Responsibilities are described in detail in TVA's Nuclear Quality Assurance Plan (TVA-NQA-PLN89-A). This position reports to the Manager, Corporate NA&L.

3.6.4 SQN & WBN Site Licensing and Industry Affairs The Manager, SQN & WBN Site Licensing and Industry Affairs, provides licensing services associated with the operation of SQN and WBN. This position serves as the primary interface with the NRC for site-related matters. This position reports to the Manager, Corporate NA&L.

This manager is responsible for developing the vision and strategy for the site in the areas of the NRC, INPO, NEI, and other industry interfaces. This manager is also responsible for managing the site Operating Experience Review Program and ensuring that the technical, programmatic evaluations, and in-depth analyses of in-house occurrences at TVA facilities and other industry sites which impact nuclear safety and reliability are completed and addressed as appropriate to prevent the recurrence of events.

3.6.5 Plant Manager The primary responsibility and authority for ensuring safe, reliable, and efficient plant operations in conformance and compliance with all federal, state, and local laws and regulations are vested in the Plant Manager. The Plant Manager is responsible for ensuring that hardware and software modifications or revisions, made subsequent to the original design or construction of the project, are authorized and carried out in accordance with procedures and instructions. This position is responsible for ensuring that established acceptance criteria are satisfied before plant systems or components are returned to normal operation. The Plant Manager appoints the chairman and the members of the PORC. The Plant Manager is responsible for ensuring that adequate and complete records and reports are developed and maintained and that plant personnel are appropriately trained and qualified for their jobs.

The Plant Manager administers the principal areas of responsibility through the following managers:

Manager, Maintenance and Modifications Manager, Radiological Protection Manager, Chemistry/Environmental Assistant Plant Manager Manager, Outage & Scheduling Manager, Operations Manager, Training 28

Topical Report TVA-NPOD89-A Rev. 13 See Figure 3-5 for the Plant Manager's organization chart.

a. Maintenance and Modifications The Manager, Maintenance and Modifications, is responsible for planning, directing, and managing the plant's maintenance program to ensure that equipment and systems are maintained in accordance with operability and reliability engineering practices and requirements.

This manager is responsible for major outage work and modifications. This position manages the development, implementation, and maintenance of the site measuring and test equipment tool rooms.

This manager is responsible for the maintenance and testing of the relaying associated with the transmission system, switchyard maintenance, generator protection, and the auxiliary power system. This manager is also responsible for the maintenance and testing of all in-plant radios, TI spans (digital method of voice or data transmissions), and all external plant communications systems (with the exception of the Bell system and AT&T equipment).

b. Radiological Protection The Manager, Radiological Protection, guides programs and activities at the plant ensuring that all operations, maintenance, modifications and engineering activities are conducted in a radiologically safe manner and protect plant systems and equipment. This includes developing, implementing and managing the Site Radiological programs. This manager guides technical assistance and project management activities in support of the site consistent with regulatory requirements.

This manager develops and maintains procedures and applies standards necessary for the Radiological Protection programs. This manager supports the site training program and provides specialized training in radiological disciplines. This manager is responsible for personnel radiation monitoring to ensure compliance with all applicable requirements. This manager is responsible for maintaining continuing records of personnel exposure, plant radiation and contamination levels. In addition, this manager is responsible for implementation of effective site programs for radiochemistry and radiological compliance.

c. Chemistry/Environmental The Manager, Chemistry/Environmental guides programs and activities at the plant ensuring that all operations, maintenance, modifications, and engineering activities 29

Topical Report TVA-NPOD89-A Rev. 13 are conducted in a manner consistent with applicable federal and state regulations and protect the plant systems, equipment, and the environment.

d. Assistant Plant Manager (APM)

The APM assumes full responsibility and accountability of the Plant Manager in the Plant Manager's absence.

This is a developmental position for progression to Plant Manager. There may be more than one APM position with any of the plant manager departments under their supervision.

e. Outage & Scheduling The Manager, Outage & Scheduling, has overall responsibility for outage planning, coordination, and monitoring. This manager plans all outages, establishes work priorities, and coordinates shift turnover. This manager is responsible for managing plant scheduling processes ensuring efficient, effective management of the work control function which is the basis of the site's schedule.
f. Operations The Manager, Operations, has responsibility for planning, organizing, setting policy, and motivation relating to Operations, and supporting activities (e.g.,

fire protection surveillances). These activities include operational strategies for generation, water and waste usage, approval authority for system enhancements, and prioritization of maintenance activities. To meet these objectives, functions related to Operations and supporting activities are grouped under one manager responsible for facility generation (i.e., Manager, Operations).

The Manager, Operations, has two principal reports:

Superintendent, Operations Superintendent, OS Superintendent, Operations The Superintendent, Operations, is responsible for all plant operations. The superintendent, through the shift operations supervisors, manages the day-to-day operation of the facility, refueling operations, start-up, operational testing, water and waste processing, and plant operations. The superintendent is responsible for coordinating and scheduling the training program for all Operations personnel as well as providing the nucleus for emergency response teams.

30

Topical Report TVA-NPOD89-A Rev. 13 The shift crew for one unit operating normally consists of the Shift Manager (SRO), Unit Supervisor (SRO), Unit Operators (RO), and Nuclear Assistant Unit Operators (NAUOs). Additional licensed and nonlicensed personnel are required for two-unit operation. Additional operators are assigned as required by the Technical Specifications to meet the requirements of 10 CFR 50.54(m)(2). Plant management and technical support personnel will be present or on call at all times.

Superintendent, Operations Support The Superintendent, OS, is responsible for budget preparation, training oversight, performance monitoring, and assists the Manager, Operations, in overall program direction for operations. The Supervisor, Fire Operations, with the overall responsibility for the fire protection program, reports to the Superintendent, OS.

g. Training The Manager, Training, directs the planning, development, implementation, and evaluation of federally-regulated and nationally-accredited training programs to ensure sufficient qualified personnel to operate, maintain, and modify the nuclear power plant. The nuclear industry's training organization, the National Academy for Nuclear Training, is managed by INPO, the industry's self-governance organization. Through the Academy's National Nuclear Accrediting Board, all 12 applicable TVAN training programs in operations, maintenance, and technical training have been accredited. Generally, maintaining Academy accreditation is sufficient to satisfy applicable federal regulations. Even more critical than meeting external expectations is the assurance that the nuclear power plant work force has been properly trained on a task-by-task basis to perform individual and team duties in an accurate, timely, and safe manner. This position is responsible for establishing, delivering, and maintaining such performance-based personnel training programs.

3.6.6 Manager, Steam Generator Replacement The Manager, Steam Generator Replacement is responsible for managing the purchase, fabrication/ manufacturing, and installation of the steam generators at SQN and WBN, ensuring that managed activities are conducted in accordance with appropriate regulations and TVA policies, programs, and procedures; plant technical specifications; and Federal, state, and local regulations. This position is responsible for steam generator replacement for two nuclear sites, ensuring consistency and application of lessons learned from one project/site to another.

31

.Topical Report TVA-NPOD8 9-A Rev. 13 SEQUOYAH NUCLEAR PLANT SITE VICE PRESIDENT Site Vice President Concerns Resolution Engineering & Site Site Nuclear i SQN/WBg Plant Manager Support Assurance ic Affainr Manager Manager Afi MaSi ageprt Project SieEgneigNuclear Site Site Emergi Management Maenaginerin Security Preparedn ess Lo; Manager Manager Manager Manage Figure 3-4 32

Topical Report TVA-NPOD8 9-A Rev. 13 SEQUOYAH NUCLEAR PLANT PLANT MANAGER Plant Mana Assistant Plant Manager(s)

H Chemistry/ Radiological Outage &m Environmental Protection Training Manager Scheduling Manager Manager Manager Figure 3-5 33

Topical Report TVA-NPOD89-A Rev. 13 WBN NUCLEAR PLANT 3.7 Vice President, WBN The Vice President, WBN Site, is responsible and accountable for activities at the site, including Ul operations, modifications, maintenance, support, and engineering services and Unit 2 Construction Permit activities. The Vice President, WBN Site, manages activities associated with the WBN plant and determines the nature and extent of onsite and offsite support services required to support site operations and activities in accordance with TVAN policy and procedures. The Vice President, WBN Site, is responsible for the quality of work activities.

The Vice President, WBN Site, has two principal direct reports and administers responsibilities through them. These reports are:

Manager, Engineering and Site Support Plant Manager The Site NA and Site Licensing and Industry Affairs Managers have a functional reporting relationship to the Vice President, WBN Site.

See Figure 3-6 for the WBN organization chart.

3.7.1 Engineering and Site Support The Manager, Engineering and Site Support, provides general programmatic management and direction for assigned organizations to ensure that necessary services are provided to support safe, reliable operations and are responsive to site schedules, priorities, and requirements.

This includes directing the development and management of Site Engineering, Security, Emergency Preparedness, Project Management, Site Support and providing technical support to Operations, Maintenance, Modifications, Radiological Control, Chemistry, and the Plant Manager, in accordance with all federal, state, and local regulations.

a. Site Engineering The Manager, Site Engineering, is responsible for the development and management of the Engineering Design, System Engineering, Engineering Support, Technical Support, Components Test and Inspection, Document Control and Records Management functions at the site.

34

Topical Report TVA-NPOD89-A Rev. 13

b. Project Management The Manager, Project Management, is responsible for cost engineering functions including estimating, forecasting, trending/scope control, data analysis, and reporting. The Project Management Manager is responsible for ensuring technical and programmatic cost requirements of the site organizations (including contractors), site senior management, and TVA executive management are quantified, integrated, and supported by established processes to a high degree of consistency and reliability. The Project Management Manager also has responsibility for corporate employees assigned to the site who are responsible for the site's Information Services.
c. Site Support The Manager, Site Support, directs the work of corporate employees assigned to the site who are responsible for financial activities to provide the overall accounting, budget, and business reporting processes for all areas of activity at the site. In addition, the Site Support Staff is responsible for the development, implementation, and oversight of site analysis and reporting systems to report key indicators, compile data that can be utilized to reduce costs, and increase overall site effectiveness and efficiency. Additionally, the Site Support Staff is responsible for maintaining the site's CAP, which identifies and corrects problems and adverse conditions in a manner consistent with the nature of the conditions and its importance to plant safety or plant reliability.
d. Nuclear Site Security The Manager, Nuclear Site Security, is responsible for the management and direction of the Site Security Program to ensure security at the nuclear site and compliance with TVA and NRC requirements.
e. Site Emergency Preparedness The Manager, Site Emergency Preparedness is responsible for the site's Emergency Preparedness Program to ensure safety of TVA employees and the general public in the event of an accident at the nuclear facility.

35

Topical Report TVA-NPOD89-A Rev. 13 3.7.2 Site Concerns Resolutions The Site Representative, Concerns Resolution, provides site employees with a means for reporting their concerns to a high-level within TVA's nuclear organization if, for any reason, the employees do not believe that their supervisors would properly respond to expressing concerns.

This position reports to the Corporate Manager, Concerns Resolutions, providing the Concerns Resolution Program sufficient independence and freedom to ensure that concerns are properly addressed.

3.7.3 Site Nuclear Assurance (NA)

The Manager, Site NA, provides oversight of quality activities associated with the operation of WBN. Responsibilities are described in detail in TVA's Nuclear Quality Assurance Plan (TVA-NQA-PLN89-A). This position reports to the Manager, Corporate NA&L.

3.7.4 SQN & WBN Site Licensing and Industry Affairs The Manager, SQN & WBN Site Licensing and Industry Affairs, provides licensing services associated with the operation of SQN and WBN. This position serves as the primary interface with the NRC for site-related matters. This position reports to the Manager, Corporate NA&L.

This manager is responsible for developing the vision and strategy for the site in the areas of the NRC, INPO, NEI, and other industry interfaces such as Westinghouse Owners Group.

This manager is also responsible for managing the site Operating Experience Review Program and ensuring that the technical, programmatic evaluations, and in-depth analyses of in-house occurrences at TVA facilities and other industry sites which impact nuclear safety and reliability are completed and addressed as appropriate to prevent the recurrence of events.

3.7.5 Plant Manager The primary responsibility and authority for ensuring safe, reliable, and efficient plant operations in conformance and compliance with all federal, state, and local laws and regulations are vested in the Plant Manager. The Plant Manager is responsible for ensuring that hardware and software modifications or revisions made subsequent to the original design or construction of the project are authorized and 36

Topical Report TVA-NPOD89-A Rev. 13 carried out in accordance with procedures and instructions.

This position is responsible for ensuring that established acceptance criteria are satisfied before plant systems or components are returned to normal operation. The Plant Manager is responsible for ensuring that adequate and complete records and reports are developed and maintained and that plant personnel are appropriately trained and qualified for their jobs. The Plant Manager appoints the chairman and the members of the PORC. The Plant Manager provides operation and maintenance support to the unit.

The Plant Manager administers the principal areas of responsibility through the following managers:

Manager, Maintenance and Modifications Manager, Radiological Protection Manager, Chemistry/Environmental Assistant Plant Manager Manager, Outage and Scheduling Manager, Operations Manager, Training See Figure 3-7 for the Plant Manager's organization chart.

a. Maintenance and Modifications The Manager, Maintenance and Modifications, is responsible for planning, directing, and managing the plant's maintenance program to ensure that equipment and systems are maintained in accordance with operability and reliability engineering practices and requirements. This manager is responsible for major outage work and modifications. This position manages the development, implementation, and maintenance of the site measuring and test equipment tool rooms.

This manager is responsible for the maintenance and testing of the relaying associated with the transmission system, switchyard maintenance, generator protection, and the auxiliary power system. This manager is also responsible for the maintenance and testing of all in-plant radios, TI spans (digital method of voice or data transmissions), and all external plant communications systems (with the exception of the Bell system and AT&T equipment).

b. Radiological Protection The Manager, Radiological Protection, guides programs and activities at the plant ensuring that all operations, maintenance, modifications and engineering activities are conducted in a radiologically safe manner, protect plant systems and equipment. This includes developing, implementing, and managing the Site Radiological programs.

37

Topical Report TVA-NPOD89-A Rev. 13 This manager guides technical assistance and project management activities in support of the site consistent with regulatory requirements. This manager develops and maintains procedures and applies standards necessary for the Radiological programs.

This manager supports the Site Training Program and provides specialized training in radiological disciplines.

This manager is responsible for personnel radiation monitoring to ensure compliance with all applicable requirements. This manager is responsible for maintaining continuing records of personnel exposure, plant radiation and contamination levels. In addition, this manager is responsible for implementation of effective site programs for radiochemistry and radiological compliance.

c. Chemistry/Environmental The Manager, Chemistry/Environmental guides programs and activities at the plant ensuring that all operations, maintenance, modifications, and engineering activities are conducted in a manner consistent with applicable federal and state regulations and protect the plant systems, equipment, and the environment.
d. Assistant Plant Manager (APM)

The APM assumes the full responsibilities and accountabilities of the Plant Manager in the Plant Manager's absence. These are developmental positions for the progression to Plant Manager. There may be more than one APM position with any of the above plant manager departments under their supervision.

e. Outage & Scheduling The Manager, Outage & Scheduling, has overall responsibility for outage planning, coordination, and monitoring. This manager plans all outages, establishes work priorities, and coordinates shift turnover. This manager is responsible for managing plant scheduling processes ensuring efficient, effective management of the work control function which is the basis of the site's schedule.
f. Operations The Manager, Operations, has responsibility for planning, organizing, setting policy, and motivation relating to Operations, and supporting activities (e.g., fire 38

Topical Report TVA-NPOD89-A Rev. 13 protection surveillances). These activities include operational strategies for generation, water and waste usage, approval authority for system enhancements, and prioritization of maintenance activities. To meet these objectives, functions related to Operations and supporting activities are grouped under one manager responsible for facility generation (i.e., Manager, Operations). This position serves as Chairman of the PORC.

The Manager, Operations, has two principal reports:

Superintendent, Operations Superintendent, OS Superintendent, Operations The Superintendent, Operations, is responsible for plant operations. The superintendent, through the shift managers, manages the day-to-day operation of the facility, refueling operations, start-up, operational testing, water and waste processing, and plant operations. The superintendent is responsible for coordinating and scheduling the training program for all Operations personnel as well as providing the nucleus for emergency response teams.

The shift crew for one unit operating normally consist of the Shift Manager (SRO), Unit Supervisor (SRO), Nuclear Unit Operators (SROs), and Assistant Unit Operators (AUOs).

Additional operators are assigned as required by the Technical Specifications to meet the requirements of 10 CFR 50.54(m)(2). Plant management and technical support personnel will be present or on call at all times.

Superintendent, Operations Support (OS)

The Superintendent, OS, is responsible for budget preparation, training oversight, performance monitoring, and assists the Manager, Operations, in overall program direction for operations. The Supervisor, Fire Operations, with the overall responsibility for the fire protection program, reports to the Superintendent, Operations Support.

g. Training The Manager, Training, directs the planning, development, implementation, and evaluation of federally regulated and nationally accredited training programs to ensure sufficient qualified personnel to operate, maintain, and modify the nuclear power plant. The nuclear industry's 39

Topical Report TVA-NPOD89-A Rev. 13 training organization, the National Academy for Nuclear Training, is managed by INPO, the industry's self-governance organization. Through the Academy's National Nuclear Accrediting Board, all 12 applicable TVAN training programs in operations, maintenance, and technical training have been accredited. Generally, maintaining Academy accreditation is sufficient to satisfy applicable federal regulations. Even more critical than meeting external expectations is the assurance that the nuclear power plant work force has been properly trained on a task-by-task basis to perform individual and team duties in an accurate, timely, and safe manner. This position is responsible for establishing, delivering, and maintaining such performance-based personnel training programs.

3.7.6 Manager, Steam Generator Replacement The Manager, Steam Generator Replacement is responsible for managing the purchase, fabrication/ manufacturing, and installation of the steam generators at SQN and WBN, ensuring that managed activities are conducted in accordance with appropriate regulations and TVA policies, programs, and procedures; plant technical specifications; and Federal, state, and local regulations. This position is responsible for steam generator replacement for two nuclear sites, ensuring consistency and application of lessons learned from one project/site to another.

40

Topical Report TVA-NPOD8 9-A Rev. 13 WATTS BAR NUCLEAR PLANT SITE VICE PRESIDENT Site Vice President Concerns Resolution Engineering & Site Nuclear a ncen &BNSite 3ngrSupport Assurance Affasin&Idsrs Manager Manager Manager lProject i g ng;2 l Ncear Sie S ite Emergencyi I; Smangier Security Preparedness l

Management rManager Manager Manager Figure 3-6 41

Topical Report TVA-NPOD8 9-A Rev. 13 WATTS BAR NUCLEAR PLANT PLANT MANAGER Plant IV I _

Figure 3-7 42

Topical Report TVA-NPOD89-A Rev. 13 Nuclear Support 4.0 Vice President, Nuclear Support (NS)

The Vice President, NS, reports to the CNO & EVP and is responsible for NA&L, including the general management of the Concerns Resolution Program; Business & Project Services, including nuclear fuel projects, tritium production, radiation waste/monitoring, and business analysis services; Emergency Services; the Nuclear Medical Staff Physician; and BLN which is in a deferral status.

The Vice President, NS, has four principal reports and administers responsibilities through them. These principal reports are as follows:

Manager, Business & Project Services Manager, Emergency Services Manager, NA&L Manager, BLN Maintenance See Figure 4-1 for the Nuclear Support Organization 4.1 Manager, Business & Project Services The Manager, Business & Project Services, provides for the general management, policy guidance and oversight of TVAN business and project services, including nuclear fuel projects, business planning and financial management services, project management controls for capital projects, radwaste and environmental protection services, and environmental radiation monitoring and instrumentation support services. This manager is responsible for an organization that implements strong project management concepts for TVAN, manages assigned corporate nuclear projects, including the site master plan projects, develops project management standards for the entire Project Management organization, and ensures that these standards are implemented throughout the Project Management organization.

This position ensures that a program is developed and implemented to prioritize the operating nuclear plant capital projects and site master plan projects. This manager is responsible for developing, coordinating, and overseeing a strong business and fiscal management program throughout TVAN including business planning and budgeting.

This manager also provides for the monitoring and reporting of TVAN goals and objectives and submits the quarterly Trend Report to the EVP & CNO that provides system performance and status.

4.2 Manager, Emergency Services The Manager, Emergency Services, directs the management of the organization which provides technical direction, support, and oversight of TVAN's Security and Emergency Preparedness Programs, as well as directly implementing responsible offsite activities in support of these programs. This manager interfaces with industry 43

Topical Report TVA-NPOD89-A Rev. 13 and regulatory groups regarding program activities and issues; interfaces with state and local governments that provide support to and/or have a vested interest in TVAN's Emergency Services Program; ensures that managed activities are conducted in accordance with appropriate regulations, TVA commitments, policies, and procedures; and provides overall programmatic development and implementation for the Fitness for Duty Program and security background checks.

4.3 Manager, Nuclear Assurance & Licensing (NA&L)

The Manager, NA&L, is responsible for the following activities:

A. Serving as the principal interface with the NRC: providing information and interpretations concerning regulatory requirements; directing the preparation for and conduct of NRC audits, inspections, and meetings; ensuring the interpretation or resolution of NRC requests or imposed regulatory changes; and ensuring compliance with NRC reporting requirements; B. Administering Nuclear Licensing responsibilities through the Corporate Senior Licensing Program Manager and the Site Licensing and Industry Affairs Managers; C. Managing the coordination of the TVAN interface with nuclear industry groups including INPO, NEI, NSSS owners groups, operating experience review, and other nuclear industry-wide programs; D. Administering nuclear assurance responsibilities through the Corporate NA Manager, Site NA Managers, BFN U1 Restart NA Manager, and the Evaluation and Analysis Group; E. Managing the development and maintenance of the TVA nuclear assurance programs to ensure compliance with regulations, commitments, and policies, including those NA programs that govern activities performed by Site NA organization personnel; F. Managing TVA's review and qualification of suppliers to ensure final acceptance of all "safety-related material" for the nuclear plants to comply with applicable specifications and requirements; and G. Administering the Concerns Resolution Program responsibilities through full-time site representatives at the nuclear sites.

This manager ensures that the Concerns Resolution Program provides employees with a means for reporting their concerns to a high-level within TVAN's organization if, for any reason, the employees do not believe that their supervisors would properly respond to expressing concerns. Concerns Resolution representatives have direct access to the CNO & EVP on employee concerns. This provides the Concerns Resolution Program sufficient independence and freedom to ensure that concerns are properly addressed.

44

Topical Report TVA-NPOD89-A Rev. 13 4.4 Manager, BLN Maintenance The Manager, BLN Nuclear Plant Maintenance, provides general management and oversight of all activities at the site, ensuring that the managed and/or contracted activities are conducted according to applicable TVA policies, programs, procedures, technical specifications, and federal, state, and local regulations.

Organizational relationships and responsibilities reported herein reflect administrative structures. Functional relationships and responsibilities may vary from this report. Additionally, due to the status of BLN, some management functions may be combined.

Note: BLN is currently in a deferral status, i.e., there are no on-going plant completion activities. Major attention is placed on site/equipment preservation. Any NA and/or license support is performed by the corporate office.

45

TVA Nuclear Nuclear Support 46