Regulatory Commitment Change Summary ReportML17354A087 |
Person / Time |
---|
Site: |
Calvert Cliffs, Dresden, Peach Bottom, Oyster Creek, Byron, Three Mile Island, Braidwood, Limerick, Ginna, Clinton, Quad Cities, LaSalle |
---|
Issue date: |
12/20/2017 |
---|
From: |
David Helker Exelon Generation Co |
---|
To: |
Document Control Desk, Office of Nuclear Reactor Regulation |
---|
References |
---|
RS-17-167 |
Download: ML17354A087 (5) |
|
Similar Documents at Calvert Cliffs, Dresden, Peach Bottom, Oyster Creek, Byron, Three Mile Island, Braidwood, Limerick, Ginna, Clinton, Quad Cities, LaSalle |
---|
Category:Letter type:RS
MONTHYEARRS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) RS-23-121, Sixth Ten-Year Interval Inservice Testing Program2023-11-30030 November 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-117, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-11-0808 November 2023 Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 262023-10-20020 October 2023 Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-100, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 752023-09-29029 September 2023 Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 RS-23-091, Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals2023-09-26026 September 2023 Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2023-09-0707 September 2023 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-23-089, Sixth Ten-Year Interval Inservice Testing Program2023-09-0505 September 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR2023-08-30030 August 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-08-28028 August 2023 Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor RS-23-085, Supplemental Information Related to Request for Partial Site Release2023-08-0303 August 2023 Supplemental Information Related to Request for Partial Site Release RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-078, Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times2023-06-16016 June 2023 Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times RS-23-074, Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-06-0909 June 2023 Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0808 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2023-06-0808 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-23-073, Request for Partial Site Release2023-06-0707 June 2023 Request for Partial Site Release RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. RS-23-070, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-05-16016 May 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel RS-22-067, 10 CFR 50.46 Annual Report2023-05-0404 May 2023 10 CFR 50.46 Annual Report RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell2023-04-28028 April 2023 Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell RS-23-058, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges2023-04-24024 April 2023 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 RS-23-057, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-04-17017 April 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel RS-23-055, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2023-04-10010 April 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-23-052, License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-03-24024 March 2023 License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink 2024-01-03
[Table view] |
Text
Exelon Generation 200 Exelon Way Kennett Square. PA 19348 www.exeloncorp.com RS-17-167 December 20, 2017 ATIN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-72 and NPF-77 N RC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 N RC Docket Nos. 50-317 and 50-318 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket Nos. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278
U.S. Nuclear Regulatory Commission Regulatory Commitment Change Summary Report December 20, 2017 Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRG Docket Nos. 50-254 and 50-265 R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRG Docket No. 50-244 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRG Docket No. 50-289
Subject:
Regulatory Commitment Change Summary Report The purpose of this report is to provide the Exelon Generation Company, LLC (EGG)
"Regulatory Commitment Change Summary Report" tor the listed stations for certain commitment changes processed during the period from January 1, 2017, through December 31, 2017. Summaries of the commitment changes requiring NRG notification are contained in the attachment.
There are no new regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact Mitchel Mathews at (630) 657-2819.
Respectfully, David Helker Manager - Licensing and Regulatory Affairs Exelon Generation Company, LLC
Attachment:
Regulatory Commitment Change Summary Report
Attachment Exelon Generation Company, LLC Regulatory Commitment Change Summary Report Page 1of3
- Commitment Change Tracking Number: 2017-01 Source Documents:
- 1. Letter from D. L. Taylor (Commonwealth Edison (CECo)) to NRC, "Dresden Station, Units 2 and 3, Quad Cities, Units 1 and 2, Zion Station, Units 1 and 2, LaSalle County Station, Units 1 and 2, Byron Station, Units 1 and 2, Braidwood Station, Units 1 and 2, Alternative Schedule for Generic Letter 90-03," dated September 26, 1990
- 2. Letter from D. J. Chrzanowski (CECo) to NRC, "Clarification of Commitment to Generic Letter 90-03, 'Vendor Equipment Technical Information Program (VETIP),"' dated December 5, 1991
- 3. Letter from M. A. Jackson (CECo) to T. E. Murley (NRC), "Generic Letter 90-03, 'Vendor Interface for Safety Related components,' dated March 20, 1990 and Supplement 1 dated May 14, 1990," dated November 4, 1992
- 4. Letter from G. C. Creel (Baltimore Gas and Electric) to NRC, "Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Response to Generic Letter 90-03, 'Relaxation of Staff Position in Generic Letter 83-28, Item 2.2, Part 2, 'Vendor Interface for Safety-Related Components,"' dated September 24, 1990
- 5. Letter from J. S. Perry (Illinois Power Company) to NRC, "Clinton Power Station, Unit 1 Response to Generic Letter 90-03," dated September 25, 1990
- 6. Letter from R. C. Mecredy (Rochester Gas and Electric Corporation) to NRC, "R. E. Ginna Nuclear Power Plant Response to NRC Generic Letter 90-03 (Relaxation of Position in Generic Letter 83-28, Item 2.2 Part 2, 'Vendor Interface for Safety Related Components,"' dated September 18, 1990
- 7. Letter from D. R. Helwig (Philadelphia Electric Company (PECO) to NRC, "Peach Bottom Atomic Power Station, Units 2 and 3, Limerick Generating Station, Units 1 and 2, Response to Generic Letter No. 90-03, 'Relaxation of Staff Position in Generic Letter No.
83-28, Item 2.2 Part 2 'Vendor Interface for Safety-Related Components,"' dated October 2, 1990
- 8. Letter from E. E. Fitzpatrick (GPU Nuclear Corporation) to NRC, "Oyster Creek Nuclear Generating Station Response to Generic Letter 90-03," dated September 18, 1990
- 9. Letter from H. D. Hukill (GPU Nuclear Corporation), "Three Mile Island, Unit 1 Response to Generic Letter 90-03 Relaxation of Staff Position in Generic Letter 83-28, Item 2.2 Part 2 Vendor Interface for Safety Related Components," dated October 1, 1990 Subject of Change:
Revision to the Exelon Generation Company, LLC (EGC) Commitments in Response to NRC Generic Letter (GL) 90-03, "Relaxation of Staff Position in Generic Letter 83-28, Item 2.2 Part 2, 'Vendor Interface for Safety-Related Components."'
Attachment Exelon Generation Company, LLC Regulatory Commitment Change Summary Report Page 2of3 Original Commitment:
In response to the NRG GL 90-03 recommendations for interface with equipment vendors, EGG established, implemented, and maintains a continuing program to ensure that vendor information for safety-related components is complete, current and controlled throughout the life of its operating plants, and is appropriately referenced or incorporated in plant instructions and procedures. Vendors of safety-related equipment were contacted and an interface was established. Where vendors could not be identified, have gone out of business, or would not supply information, EGG ensured that sufficient attention was paid to equipment maintenance, replacement, and repair, to compensate for the lack of vendor backup, to assure reliability commensurate with its safety function (GDG-1). EGG's vendor interface program includes:
a) A program with the [Nuclear Steam Supply System] NSSS vendor as described in the Vendor Equipment Technical Information Program (VETIP), which covers all the safety-related components within the NSSS scope of supply. This program includes provisions for assuring receipt by EGG of all technical information provided by the NSSS vendor; and b) A program of periodic contact with the vendors of other key safety-related components not included in (a) above.
The program includes periodic communication with vendors to assure that all applicable information has been received. The program uses a system of positive feedback with vendors for mailings containing technical information. It also defined the interface and division of responsibilities between EGG and the nuclear and non-nuclear divisions of their vendors that provide service on safety-related equipment to assure that requisite control of and applicable instructions for maintenance work on safety-related equipment are provided.
Revised Commitment:
EGG will discontinue the program of periodic contact with the vendors of other (non-NSSS) key safety-related components (i.e., Item b above).
The program related to the NSSS vendors which covers all the safety-related components within the NSSS scope of supply (i.e., Item a above) is not affected.
Basis:
The periodic re-contact of vendors is redundant. The reliability of safety-related components for EGG's operating units is assured by preventive maintenance and performance monitoring actions implemented after the commitments made in response to NRG GL 83-28, "Required Actions Based on Implications of Salem ATWS Events," and GL 90-03. The preventive maintenance tasks, frequencies, and detailed actions are subject to continuous improvement and monitoring for effectiveness.
Attachment Exelon Generation Company, LLC Regulatory Commitment Change Summary Report Page 3 of 3
- Commitment Change Tracking Number: 2017-02 (Limerick Generating Station I Peach Bottom Atomic Power Station)
Source Documents:
Letter from Hubert J. Miller (U.S. Nuclear Regulatory Commission) to Oliver D. Kingsley (Exelon Generation Company, LLC) - "NRG Office of Investigations Report 1-2000-033 -
Peach Bottom Atomic Power Station I Limerick Generating Station," dated October 23, 2001 Subject of Change:
Revision to the EGG Commitments Related to NRG Office of Investigations Report 1-2000-033 for Limerick Generating Station and Peach Bottom Atomic Power Station.
Original Commitment:
" ... You are not required to respond to this letter because the NRG has sufficient information on the docket concerning this issue, including details in a combined NRG inspection report dated August 30, 2001 (50-277/01-012; 50-278/01-012 and 50-352/01-013; 50-353/01-013),
and your slides from the conference. These slides, as well as your presentation, provided your immediate and long term corrective actions to prevent recurrence of the violation. Your immediate corrective actions were described above, while your long term corrective actions included, but were not limited to: (1) the development of a training program and procedure for contract owners: (2) the strengthening of licensee procedures and terms for contracts: (3) the development of guidelines for monitoring contracts; (4) the development of a Siren Program Manual; and (5) the correction of performance indicator data submitted to the NRG .... "
Revised Commitment:
EGG will discontinue the implementation of the commitments related to independent siren inspections as discussed above in the commitment statement.
Basis:
There have been several improvements made in the EGG siren program since September 2000, including strengthening vendor oversight and strengthening the preventive maintenance and testing process as part of the EGG Management Model.
EGG has robust vendor oversight programs, which are implemented under the EGG Management Model. These programs were not in place prior to the events that occurred in 2000. Additionally, new siren system installations were completed for Peach Bottom and Limerick by 2012. These new siren systems include upgraded equipment and are managed by a new vendor. These siren systems provide improved reliability, and jumpers are not needed or used as part of the new system.
There is no adverse regulatory impact anticipated from deleting the commitment since there is improved vendor oversight, a strong preventive maintenance program, and new siren systems installed for Limerick and Peach Bottom that are highly reliable and comply with applicable regulatory requirements and guidance.