ML030550248
| ML030550248 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse, Mcguire, Palisades, Catawba, Saint Lucie, Point Beach, Prairie Island, Turkey Point, Callaway, Comanche Peak, Fort Calhoun, McGuire |
| Issue date: | 02/17/2003 |
| From: | Speckert M Carboline Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| 39593 | |
| Download: ML030550248 (8) | |
Text
0211712003 U.S. NuclearRegulatory Commission OperationsCenter Event Report SLLL_
General Information or Other (PAR) Event # 39593 Rep Org: CARBOLINE COMPANY Notification Date /Time: 02/17/2003 16:44 (EST)
Supplier: CARBOLINE COMPANY Event Date I Time: 02/17/2003 (CST)
Last Modification: 02/17/2003 Region: 3 Docket #:
City: BRENTWOOD Agreement State: No County: License #:
State: MO NRC Notified by: MARIKAY SPECHERT Notifications: PATRICIA HOLAHAN NMSS HQ Ops Officer: HOWIE CROUCH CHARLES MARSCHALL R4 Emergency Class: NON EMERGENCY SONIA BURGESS R3 10 CFR Section: MARK LESSER R2 21.21 UNSPECIFIED PARAGRAPH GLENN MEYER R1 10 CFR PART 21 NOTIFICATION - CARBOLINE COMPANY The following information was obtained from the vendor via facsimile:
"This letter serves to notify the Commission of a potential safety related noncompliance deviation in a basic component as defined in 10CFR Part 21. The noncompliance involves hard settling of Carboguard 890 Part B; the affected batches are 2A9266L, 2A9275L, and 2H9352L "The hard settling of Carboguard 890 Part B would result in a mixed product that would have lower pigment volume concentration (PVC) than standard material that has been uniformly dispersed. Potential deficiencies would be a lack of film build during application as a result of a lower initial viscosity and the fact that some particles from the hard settling may have been dispersed into the mixed product. These particles could result in the clogging of spray gun tips or having particles embedded into the applied coating, which are aesthetically unpleasing. Overall the lack of pigment in the coating film affects the application and aesthetic properties of the coating and not the performance properties. The primary criteria for the epoxy coating's performance are that the stoichiometry of epoxy resin to amine curing agent are not changed by more than 10%. Based upon a prior non-nuclear occurrence we know that the hard settling does not alter the stoichiometry of the coating and the cure of the product will be within the parameters designed by the formulating chemist. Based upon prior testing of numerous coatings for use in nuclear power plants we have not seen any detrimental performance when lower PVC coatings were evaluated.
Resin rich coatings are typically gloss coatings and they aid in radiation decontamination and chemical resistance.
As such, Carboline does not feel that the performance of the coating will be adversely affected.
"A database has been created documenting all shipments of the affected batches made within the 2002 calendar year to present; approximately 30 utilities/customers are affected. All customers who our records indicate have been shipped batches 2A9266L, 2A9275L, and 2H9352L shall be notified promptly. We are requesting that customers review their stock of Carboguard 890 Part B and return the affected batches for replacement.
"In summary, Carboline has taken appropriate corrective action, notified the NRC, and shall notify all customers
f 02/17/2003 U.S. NuclearRegulatory Commission Operations CenterEvent Report Page 2 General Information or Other (PAR) Event# 39593 promptly."
The affected parties are as follows:
Consumers Energy - Palisades Generating Plant Energy Steel & Supply- 2715 Padan Street, Auburn Hills, MI Florida Power & Light - 9760 SW 344th St., Florida City, FL Hutchinson & Gunter- 715 Grpve Street, Greensburg, PA Imaging & Sensing Technology - IST Conax Nuclear, Inc., Buffalo, NY Newbury Sandblasting - PO Box 378, Newbury, OH Nullifire Ltd. - Torrington Avenue, Coventry, UK Point Beach Nuclear - 6610 Nuclear Road, Two Rivers, WI Prairie Island - Welch, MN Ameren/UE-CIPS - Callaway Plant Duke Energy Corp - Nuclear Assessment Division, SC Ellis & Watts - 4325 Slick Lane, Bativa, OH FirstEnergy, Davis-Besse Oak Harbor, OH Howden Buffalo - New Philadelphia, OH Omaha Public Power - Fort Calhoun Nuclear Station Palmer Industrial Coatings - Williamsport, PA Rotork Controls - Rochester, NY TXU Electric - Glen Rose, TX
V -) mulJLUU¶ t..*t2 1,11A .)JL* Uft- 4ftUt I ý'j AK.4~DUL+/-Lf I I 1UtJJL Lx I Jn~r.1$/.
February 13, 2003 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Fax: (301) 816-5151
Subject:
10CFR Part 21, Notification of Potential Safety Related Noncompliance Deviation Notification By:
Carboline Company Phone: (314) 644-1000 x2456 Fax: (314) 644-4617 This letter serves to notify the Commission of a potential safety related noncompliance deviation in a basic component as defined in 10CFR Part 21. The noncompliance involves hard settling of Carboguard 890 Part B; the affected batches are 2A9266L, 2A9275L, and 2H9352L The hard settling of Carboguard 890 Part B would result in a mixed product that would have lower pigment volume concentration (PVC) than standard material that has been uniformly dispersed. Potential deficiencies would be a lack of film build during application as a result of a lower initial viscosity and the fact that some particles from the hard settling may have been dispersed into the mixed product. These particles could result in the clogging of spray gun tips or having particles embedded into the applied coating; which are aesthetically unpleasing. Overall the lack of pigment in the coating film affects the application and aesthetic properties of the coating and not the performance properties. The primary criteria for the epoxy coating's performance are that the stoichiometry of epoxy resin to amine curing agent are not changed by more than 10%. Based upon a prior non-nuclear occurrence we know that the hard settling does not alter the stoichiometry of the coating and the cure of the product will be within the parameters designed by the formulating chemist. Based upon prior testing of numerous coatings for use in nuclear power plants we have not seen any detrimental performance when lower PVC coatings were evaluated. Resin rich coatings are typically gloss coatings and they aid in radiation decontamination and chemical resistance. As such, Carboline does not feel that the performance of the coating will be adversely affected.
A database has been created documenting all shipments of the affected batches made within the 2002 calendar year to present; approximately 30 utilities/customers are affected. All customers who our records indicate have been shipped batches 2A9266L, 2A9275L, and 2H9352L shall be notified promptly. We are requesting that customers review their stock of Carboguard 890 Part B and return the affected batches for replacement.
In summary, Carboline has taken appropriate corrective action, notified the NRC, and shall notify all customers promptly.
If you have any questions or need additional information concerning this notification, do not hesitate to contact Dwayne Meyer, Director, Technical Service at (314) 644-1000 extension 2550, or Marikay Speckert, Corporate QA Manager at (314) 644-1000 extension 2456.
- Regards, DwayI Meyer /*a Speck rt Director, Technical Service Quality Assuran-Manager cc: Dick Wilson, President, Carboline Company Dallas Finch, R&D Director, Carboline Company
zutoueer Attention Consumers Energy Manager Nuclear Oversight Addrenal Palisades Generating Plant Add ess2 Icity Energy Steel & Supply Manager Nuclear Oversight state*ziD Izip 27780 Blue Star Memorial Hwy StatQ Florida Power& Light Manager Nuclear Oversight 6615 Padan Street CityState Auburn /I3
____ls___I_____2_-1
_2 Hutchinson & Gunter Manager Nuclear Oversight 9760 SB 05344 715 Grpve Street L -_ Auburn Hills MI I48326-1827 Imaging & Sensing Technology Manager Nuclear Oversight _Florida City Newbury Sandblasting IST ConaxNuclear, 15L601-29 7 Manager Nuclear Oversight Inc Nullifire Ltd '.. uOnwil urive Buffalo NY 12111/38]
Manager Nuclear Oversight VU 378 lctX NY 12 11/381 Point Beach Nuclear Torrington Avenue Newbury IOU' 15-0378 Manager Nuclear Oversight Coventry Prairie Island 6610 Nuclear Road MUY 12/11/3 Manager Nuclear Oversight Newbury JOU A Veren/UE-CIPS 1_717 Walpmado Drove East Two Rivers *T *lolan I VETIP Coordinator I iTwo Rivers - IW1 I7/2/48 1 Duke Energy Corp union Electric Company - Callaway plant*
ORAMangager Huc car Assessment Division, EC 05P PO Box 620 Welch- INN 110/28/50 Ellis & Watts Manager Nuclear Oversight PO Box 1006 FJirstsnergy Plant Engineering Manager Davis Besse 432S Elick Lane C~harlotte [28201-1006 Howden Buffalo Dav s Besse Mail Stop 1056 - FENOC Manager Nuclear Oversight 5501 N State 0il 6 Omahaý lic Power New Philadelphia Fan Division Route 2 Oak Harbor Batava B 0il 43449-9760 Manager Nuclear Licensing PO Box S000 Palmer InI_dustrial Coatings Fort Calhoun Nuclear Station New Philadelphia OH 4 Manager Nuclear Oversight PO Box 399/FC-2-4-ADM Rotork Controls PO Box 40S6 port Calhoun NE 68023-0399 Manager Nuclear Oversight T:X Business Services Rotork Controls, Inc Williamsport PA 6174 Manager Nuclear Oversight TXU Electric 675 Mile Crossing Blvd.
PO Box 1002 Glen Rose Rochester JX_* 1/201/ 4/ 0 P0-100 --
Rochester len Bose IlilY 11/14/40 13/12/08
0211712003 U.S. NuclearRegulatory Commission OperationsCenter Event Report Page I General Information or Other (PAR) Event # 39593 Rep Org: CARBOLINE COMPANY Notification Date / Time:02/17/2003 16:44 (EST)
Supplier: CARBOLINE COMPANY Event Date/Time: 02/17/2003 (CST)
Last Modification: 02/17/2003 Region: 3 Docket #:
City: BRENTWOOD Agreement State: No County: License #:
State: MO NRC Notified by: MARIKAY SPECHERT Notifications: PATRICIA HOLAHAN NMSS HQ Ops Officer: HOWIE CROUCH CHARLES MARSCHALL R4 Emergency Class: NON EMERGENCY SONIA BURGESS R3 10 CFR Section: MARK LESSER R2 21.21 UNSPECIFIED PARAGRAPH GLENN MEYER R1 10 CFR PART 21 NOTIFICATION - CARBOLINE COMPANY The following information was obtained from the vendor via facsimile:
"This letter serves to notify the Commission of a potential safety related noncompliance deviation in a basic component as defined in 10CFR Part 21. The noncompliance involves hard settling of Carboguard 890 Part B; the affected batches are 2A9266L, 2A9275L, and 2H9352L "The hard settling of Carboguard 890 Part B would result in a mixed product that would have lower pigment volume concentration (PVC) than standard material that has been uniformly dispersed. Potential deficiencies would be a lack of film build during application as a result of a lower initial viscosity and the fact that some particles from the hard settling may have been dispersed into the mixed product. These particles could result in the clogging of spray gun tips or having particles embedded into the applied coating, which are aesthetically unpleasing. Overall the lack of pigment in the coating film affects the application and aesthetic properties of the coating and not the performance properties. The primary criteria for the epoxy coating's performance are that the stoichiometry of epoxy resin to amine curing agent are not changed by more than 10%. Based upon a prior non-nuclear occurrence we know that the hard settling does not alter the stoichiometry of the coating and the cure of the product will be within the parameters designed by the formulating chemist. Based upon prior testing of numerous coatings for use in nuclear power plants we have not seen any detrimental performance when lower PVC coatings were evaluated.
Resin rich coatings are typically gloss coatings and they aid in radiation decontamination and chemical resistance.
As such, Carboline does not feel that the performance of the coating will be adversely affected.
"A database has been created documenting all shipments of the affected batches made within the 2002 calendar year to present; approximately 30 utilities/customers are affected. All customers who our records indicate have been shipped batches 2A9266L, 2A9275L, and 2H9352L shall be notified promptly. We are requesting that customers review their stock of Carboguard 890 Part B and return the affected batches for replacement.
"In summary, Carboline has taken appropriate corrective action, notified the NRC, and shall notify all customers
02/1712003 U.S. NuclearRegulatory Commission Operations Center Event Report Page 2 General Information or Other (PAR) Event# 39593 promptly."
The affected parties are as follows:
Consumers Energy- Palisades Generating Plant Energy Steel & Supply - 2715 Padan Street, Auburn Hills, MI Florida Power & Light - 9760 SW 344th St., Florida City, FL Hutchinson & Gunter- 715 Grpve Street, Greensburg, PA Imaging & Sensing Technology - IST Conax Nuclear, Inc., Buffalo, NY Newbury Sandblasting - PO Box 378, Newbury, OH Nullifire Ltd. - Torrington Avenue, Coventry, UK Point Beach Nuclear - 6610 Nuclear Road, Two Rivers, Wl Prairie Island - Welch, MN Ameren/UE-CIPS - Callaway Plant Duke Energy Corp - Nuclear Assessment Division, SC Ellis & Watts - 4325 Slick Lane, Bativa, OH FirstEnergy, Davis-Besse Oak Harbor, OH Howden Buffalo - New Philadelphia, OH Omaha Public Power - Fort Calhoun Nuclear Station Palmer Industrial Coatings - Williamsport, PA Rotork Controls - Rochester, NY TXU Electric - Glen Rose, TX
~W?%#
February 13, 2003 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Fax: (301) 816-5151
Subject:
10CFR Part 21, Notification of Potential Safety Related Noncompliance Deviation Notification B~y:
Carboline Company Phone: (314) 644-1000 x2456 Fax: (314) 644-4617 This letter serves to notify the Commission of a potential safety related noncompliance deviation in a basic component as defined in IOCFR Part 21. The noncompliance involves hard settling of Carboguard 890 Part B; the affected batches are 2A9266L, 2A9275L, and 2H9352L The hard settling of Carboguard 890 Part B would result in a mixed product that would have lower pigment volume concentration (PVC) than standard material that has been uniformly dispersed. Potential deficiencies would be a lack of film build during application as a result of a lower initial viscosity and the fact that some particles from the hard settling may have been dispersed into the mixed product. These particles could result in the clogging of spray gun tips or having particles embedded into the applied coating; which are aesthetically unpleasing. Overall the lack of pigment in the coating film affects the application and aesthetic properties of the coating and not the performance properties. The primary criteria for the epoxy coating's performance are that the stoichiometry of epoxy resin to amine curing agent are not changed by more than 10%. Based upon a prior non-nuclear occurrence we know that the hard settling does not alter the stoichiometry of the coating and the cure of the product will be within the parameters designed by the formulating chemist. Based tpon prior testing of numerous coatings for use in nuclear power plants we have not seen any detrimental performance when lower PVC coatings were evaluated. Resin rich coatings are typically gloss coatings and they aid in radiation decontamination and chemical resistance. As such, Carboline does not feel that the performance of the coating will be adversely affected.
A database has been created documenting all shipments of the affected batches made within the 2002 calendar year to present; approximately 30 utilities/customers are affected. All customers who our records indicate have been shipped batches 2A9266L, 2A9275L, and 2119352L shall be notified promptly. We are requesting that customers review their stock of Carboguard 890 Part B and return the affected batches for replacement.
In summary, Carboline has taken appropriate corrective action, notified the NRC, and shall notify all customers promptly.
If you have any questions or need additional information concerning this notification, do not hesitate to contact Dwayne Meyer, Director, Technical Service at (314) 644-1000 extension 2550, or Marikay Speckert, Corporate QA Manager at (314) 644-1000 extension 2456.
- Regards, Dway ,Meyer 7 K Speck rt/
Director, Technical Service Quality AssurancdManager cc: Dick Wilson, President, Carboline Company Dallas Finch, R&D Director, Carboline Company
Consumers g utlere Odvrsagl Manager Nuclear Oversight Palisades Generating Plant Energy Steel & Supply Manager Nuclear Oversight Addre *sa2 Powu &a Pada street Stat* zln Florida Power Manager Overigh 2715 Padan S 27780 Blue Star Memorial Hwy Light Manager Nuclear Oversight atre Covert MI 4/9/34 Hutchinson Gunter 9760 SW 344 TI Manager Nuclear Oversight Auburn Hills MI 48326-1827 Imaging & Sensing Technology 715 Grpvc Street Manager Nuclear Oversight Florida City FL /1 Newbury Sandblasting IST Conax Nuclear. Inc Manager Nuclear Oversight Greensburg PA 15601-2877 Nullifire Ltd P0 Box 378 402 S onwil Drive Manager Nuclear Oversight Buffalo NY 12/11/38 Point Beech Nuclear Torrington Avenue Manager Nuclear Oversight Newbury oi 44065-0378 Prairie Island 6610 Nuclear Road Manager Nuclear Coventry UK VETIP CoordinatorOversight 1717 Walpmade Drove East CV49TJ Union Electric Company Two Rivers WI 7/2/48 Duke Energy Corp RAsMangager - Callaway Plant Nuclear Assessment Division, EC Welch MU 10/28/50 Ellis & Watts 05P PO B0ox 620 Fulton Manager Nuclear Oversight NO 8/24/78 FirstEnergy 4325 Blick Lane PO no:x 1006 Plant Engineering Manager Davis Charlotte NC 28201-1006 Howden Buffalo Besse Davis Besse Mail Stop 1056 - FENOC Manager Nuclear Oversight Bativa ON /23 Omaha Public Power New Philadelphia Fan Division 5501 4 State Route 2 Manager Nuclear Licensing Oak Harbor OH 43449-9760 Palmer Indsi Fort Calhoun Nuclear Station PO BoýC 5000 atings Manager Nuclear Oversight New Philadelphia Manager Nuclear Oversight PO Box 4056 OH 4/12/22 PO Box 399/FC-2-4-ADM Fort Calhoun Rotork Controls, Inc NE 68023-0399 T---s-s---i Manager Nuclear Oversight Nll15asmport TXUElectric 675 Mi In Crossing Blvd. Rochester PO Box 1002 Glen Rose PA 617/4