. '/- I'

e

,

.

e

NOV 211988

Docket No. 50-293

Boston Edison Company

ATTN: Mr. Ralph G. Bird

Senior Vice President - Nuclear

Pilgrim Nuclear Power Station

RF0 #1 Rocky Hill Road

Plymouth, Massachusetts 0236f

Gentlemen:

Subject: INSPECTION REPORT NO. 50-293/88-30

This letter refers to the NRC inspection of your activities to evaluate the

safety significance of two loose piping support base plate anchor bolts and to

assure the integrity of other installed pipe supports. This inspection was

conducted by Mr. Suresh K. Chaudhary and Mr. Joseph E. Carrasco of this office

on October 27 to November 18, 1988, at the Pilgrim Nuclear Power Station; at

your Engineering Office in Braintree, Massachusetts; and at the NRC Region I

office in King of Prussia, Pennsylvania. As part of this inspection, several

telephone discussions were held between Messrs. S. K. Chaudhary, J. R. Strosnider

and other members of my staff and Messrs. R. Swanson, R. Fairbanks, and other

members of your staf f. These telephone discussions covered requests for

additional information and our findings with regard to the subject inspection.

Also, a management meeting to discuss this issue was held at the NRC Region I

office in King of Prussia, Pennsylvania on November 17, 1988.

Areas examined during this inspection are described in the NRC Region I inspection

report which is enclosed with this letter. Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, and observations by the inspectors. Also included

in the enclosed report is a summary of the November 17 management meeting.

With-in the scope of this inspection, No violations were ebserved.

No reply to this letter is required. Your cooperation with us in this matter

1 appreciated.

Sincerely,

Ci:L.:m . , . ; CT

Thomas T. l.iartin

Thomas T. Martin, Director

Division of Reactor Safety

Enclosures: NRC Region I Inspection Report Number 50-293/88-30

0FFICIAL RECORD COPY IR PILGRIM 88-30 - 0001.0.0

11/21/88

G311290573 881121

PDR

O

ADOCK 0500029?

PDC

H E'Ol i(

. _ _ __ _ _. __.

'

s ' ' .: , - '

2 '

. NOV 211988

. Boston Edison Company 2

t

5,r

1

- cc w/ encl:

K. Highfill, Station Director

R. Anderson, Plant Manager

J. Keyes, Licensing Division Manager

E. Robinson, Nuclear Information Manager

'R. Swanson, Nuclear Engineering Department Manager

The Honorable Edward J. Markey

- The Honorable Edward P. Kirby

The Honorable Peter V. Forman

B. McIntyre, Chairman, Department of Public Utilities 1

Chairman, Plymouth Board of Selectmen'

Chairman, Duxbury Board of Selectmen

Plymouth Civil Defense Director

P. Agnes, Assistant Secretary of Public Safety, Coemonwealth of

Massachusetts

S. Pollard, Mas:::hu:etts' Secretary of Energy Resources

R. Shimshak, MASSPIRG

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Messachusetts (2)

bec w/ encl:

Region I Docket Room (wt a concurrences)

-Management Assistant, DRM (w/c enc 1)

R. Blough, DRP

L. Doerflein, DRP

D. Mcdonald, NRR

PA0 (15) Salp Reports and All Inspection Reports

R. Bores, DRSS

S. Collins, DRP

J. Wiggins, DRP

M. Kohl, DRP

W. Russell, RA

C. Warren, SRI-Pilgrim (with concurrences)

L. Marsh, NRR

G. Bagchi, NRR

0 &

RI:DRS RI:DRS T RI:DRS RI:Dhd

C co Chaudhary J Strosnider Durr

sm

1 /2//88 11/21/88 11/11/88 11/4//88

0FFICIAL RECORD COPY IR PILGRIM 88-30 - 0002.1.0