Other: L-23-005, Independent Spent Fuel Storage Installation License Renewal Application, Revision 1 (Cac/Epid No. 001028/L-2022-RNW-0007), ML19276D398, ML20014E677, ML20049A082, ML20065N277, ML20065N278, ML20065N280, ML20065N281, ML20065N285, ML20071F156, ML20076D696, ML20094G482, ML20099A180, ML20104C015, ML20104C016, ML20104C018, ML20104C019, ML20105A135, ML20105A136, ML20105A137, ML20105A138, ML20105A139, ML20105A173, ML20111A240, ML20115E377, ML20121A272, ML20136A049, ML20136A050, ML20136A051, ML20150A300, ML20150A335, ML20150A421, ML20155K741, ML20155K742, ML20155K743, ML20155K744, ML20160A040, ML20161A088, ML20163A702, ML20163A703, ML20163A704, ML20181A211, ML20181A212, ML20192A328, ML20192A329, ML20212L768, ML20212L769, ML20212L878, ML20223A036, ML20224A287... further results | |
MONTHYEARML19276D3982019-10-0303 October 2019
[Table View]Exemption Request to Load and Store Spent Fuel in HI-STORM FW Spent Fuel Casks Utilizing Amendment 1, Revision 1 to CoC No. 1032 Project stage: Other ML20115E3782019-10-0303 October 2019 Independent Spent Fuel Storage Installation Exemption Safety Evaluation Report Project stage: Approval ML20014E6772020-01-0909 January 2020 Fws List of Threatened and Endangered Species That May Occur with Respect to the McGuire Exemption Request Project stage: Other ML20015A3142020-01-14014 January 2020 Package: Exemption Request McGuire Nuclear Facility Project stage: Request ML20049A0812020-01-31031 January 2020 Holtec International - HI-STORM 100 Storage CoC Renewal Application Project stage: Request ML20049A0822020-01-31031 January 2020 Holtec International - HI-STORM 100 Storage CoC Renewal Application Project stage: Other ML20055F3372020-02-20020 February 2020 Conversation Record - Clarification Call (02/20/2020) on RAI 1 for CoC 1040 Umax Amendment 4 Project stage: RAI ML20064F6162020-02-29029 February 2020 January 15, 2020, Summary of Meeting with Holtec International, Inc., to Discuss the Upcoming Submittal of the Application for Renewal of the Storage Certificate of Compliance No. 1014 for the HI-Storm 100 Cask System Project stage: Meeting ML20063M0152020-03-0303 March 2020 HI-STORM 100 Renewal Presubmittal Meeting (Holtec Slides, 1-15-20) Project stage: Meeting ML20064E6222020-03-0303 March 2020 U.S. Nuclear Regulatory Commission Approval of NAC International Request for Withholding Information from Public Disclosure for Coc 1025 Renewal (CAC No. 001028) Project stage: Withholding Request Acceptance ML20071J0552020-03-0505 March 2020 Notice of Cancelled Meeting with the U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20065K2162020-03-0505 March 2020 Notice of Meeting with U.S. Department of Energy, Idaho Operations Office to Discuss the Upcoming Submittal of the Application for Renewal of the Idaho Spent Fuel Facility License (SNM-2512) Project stage: Meeting ML20071F1562020-03-0505 March 2020 Interim Storage Partners, LLC - Affidavit Project stage: Other ML20071F1532020-03-0505 March 2020 Interim Storage Partners, LLC - Supplemental Information in Support of Nrc'S Environmental Review Project stage: Supplement ML20065J4272020-03-0505 March 2020 Submittal of Renewal Application for the TN-32 Dry Storage Cask - CoC 1021 Project stage: Request ML20066K5782020-03-0606 March 2020 Acceptance Review of Request for Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Acceptance Review ML20065L3442020-03-0606 March 2020 Amendment No. 15 to Certificate of Compliance No. 1014 for the Hi-Storm 100 Multipurpose Canister Storage System - Request for Additional Information Project stage: RAI ML20065N2852020-03-0909 March 2020 ISFSI Renewed Technical Specifications Project stage: Other ML20065N2772020-03-0909 March 2020 ISFSI Renewal Cover Letter Project stage: Other ML20065N2812020-03-0909 March 2020 ISFSI Preamble-License Renewal Order Project stage: Other ML20071D9942020-03-11011 March 2020 Submittal of HI-STAR 100 Updated FSAR, Revision 4 Project stage: Request ML20076D6962020-03-11011 March 2020 Interim Storage Partners, LLC - Submittal of Clarifications to Support Nrc'S Continued Review of the Safety Case for the WCS CISF Project stage: Other ML20065N2782020-03-11011 March 2020 ISFSI FRN Notice of Issuance for License Renewal Project stage: Other ML20104C0152020-03-30030 March 2020 International - Amendment No. 4 to the HI-STORM Umax Canister Storage System Project stage: Other ML20104C0162020-03-30030 March 2020 International - Proposed HI-STORM Umax CoC Amendment 4 Appendix a - Changed Pages Project stage: Other ML20104C0182020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 FSAR - Changed Pages Project stage: Other ML20104C0192020-03-30030 March 2020 International - Affidavit for Kimberly Manzione Project stage: Other ML20104C0202020-03-30030 March 2020 International - HI-STORM Umax Amendment 4 Responses to Requests for Additional Information - Supplemental Information Project stage: Supplement ML20091L0642020-03-31031 March 2020 Enclosure 1 - Request for Additional Information - Non-Proprietary Project stage: RAI ML20091L0632020-03-31031 March 2020 Transmittal Letter - CoC 1042 Amendment Number 2 Request for Additional Information Project stage: RAI ML20105A1352020-03-31031 March 2020 Enclosure 1 - Affidavits Project stage: Other ML20101P3992020-03-31031 March 2020 Interim Storage Partners, LLC - Submittal of Draft Responses for Several Rals and Associated Document Markups from First Request for Additional Information, Parts 1, 2 and Clarifications Project stage: Draft Request ML20104C0482020-03-31031 March 2020 International - HI-STORM Umax Amendment 3 Responses to Requests for Additional Information Project stage: Response to RAI ML20065N2802020-03-31031 March 2020 ISFSI License Renewal SER Project stage: Other ML20099A1802020-04-0606 April 2020 Application for Renewal of the Certificate of Compliance No. 1014 for the Hi-Storm 100 Storage Cask System Accepted for Review (Cac/Epid Nos. 001028/L-2020-RNW-0007) Project stage: Other ML20105A1732020-04-0606 April 2020 Interim Storage Partners, LLC - Affidavits Project stage: Other ML20105A1722020-04-0707 April 2020 Interim Storage Partners, LLC - Submittal of Supplemental Information in Support of RAI, Part 3 Project stage: Supplement ML20105A1392020-04-0707 April 2020 Enclosure 8 - Referenced Documents Project stage: Other ML20105A1342020-04-0707 April 2020 Submission of ISP Responses for RAIs and Associated Document Markups from First Request for Additional Information, Parts 2, 3, and 4 Project stage: Request ML20105A1382020-04-0707 April 2020 Enclosure 7 - SAR Changed Pages Project stage: Other ML20105A1362020-04-0707 April 2020 Enclosure 3 - RAIs and Responses Project stage: Other ML20105A1372020-04-0707 April 2020 Enclosure 5 - La Changed Pages Project stage: Other ML20100F2952020-04-0909 April 2020 Tn Americas LLC - Submittal of Renewal Application for the TN-68 Dry Storage Cask - CoC 1027 Project stage: Request ML20104A0402020-04-10010 April 2020 Request for Additional Information for HI-STAR 100 CoC Renewal Application Project stage: RAI ML20111A2402020-04-13013 April 2020 Attachment 2: Proposed HI-STORM Umax CoC Amendment 4 Appendix a - Changed Pages (non-proprietary) Project stage: Other ML20111A2392020-04-13013 April 2020 Attachment 1: HI-STORM Umax Amendment 4 RAI Supplemental Response (non-proprietary) Project stage: Supplement ML20111A2382020-04-13013 April 2020 International - HI-STORM Umax Amendment 4 Responses to Requests for Additional Information - Supplemental Information Project stage: Supplement ML20094G4822020-04-15015 April 2020 GEH-Morris QAP Rev 4 Approval Project stage: Other ML20092L1732020-04-17017 April 2020 Safety Evaluation Report for the Pacific Gas and Electric Company Humboldt Bay Independent Spent Fuel Storage Installation Quality Assurance Plan HBI-L6 Revision 0 Project stage: Approval ML20120A2282020-04-29029 April 2020 Tn Americas LLC, Response to the Request for Additional Information to Application for Certificate of Compliance No. 1042, Amendment No. 2, to NUHOMS Eos System, (Docket No. 72-1042, CAC No. 001028 EPID: L-2019-LLA-0078)- Request for Extens Project stage: Request 2020-03-05 |
ML24065A305 | |
Person / Time | |
---|---|
Site: | 07201032 |
Issue date: | 01/26/2024 |
From: | Office of Nuclear Material Safety and Safeguards |
To: | Holtec |
References | |
CAC 001028, EPID L-2021-LLA-0053 | |
Download: ML24065A305 (2) | |
Similar Documents at 07201032 | |
---|---|
Category:Meeting Summary
MONTHYEARML24066A1602024-03-0808 March 2024
[Table view]Enclosure 1 - Summary of February 8, 2024 Public Meeting with Holtec and Hug: Attendee List ML24066A1632024-03-0808 March 2024 Memorandum - Summary of February 8, 2024 Public Meeting with Holtec International and Holtec Users Group on EA 23-044 and Path Forward ML24067A3022024-03-0808 March 2024 Memorandum: Summary of March 6, 2024, Public Meeting with Holtec International Inc. and the Holtec Users Group to Discuss the Path Forward for General Licensees Affected by the Continuous Basket Shims Basket Design Change ML24079A3212024-02-28028 February 2024 Attachment 2 - Conversation Record HI-STORM FW Storage System Amendment 7: Meeting Summary ML24067A1852024-02-0808 February 2024 Attachment 1 - Conversation Record HI-STORM Flood/Wind Storage System Amendment 7: Staffs Observation on 1/26/2024 Meeting ML24067A1872024-02-0808 February 2024 Attachment 3 - Conversation Record HI-STORM Flood/Wind Storage System Amendment 7: Meeting Summary ML24065A3052024-01-26026 January 2024 Attachment 3 - Conversation Record HI-STORM Flood-Wind Storage System Amendment 7 Meeting Summary (Non-proprietary) ML23278A2292023-10-0404 October 2023 NRC 699 - Conversation Record_10-04-2023_HI-STORM FW Amd 7 Clarification Discussion ML23278A2282023-10-0404 October 2023 Enclosure - HI-STORM FW Amd 7 Clarification Discussion (10/04/2023) ML23216A2182023-08-0303 August 2023 Conversation Record Attachment: Clarification Questions for RAI 3-10 for HI-STORM FW Amendment 7 ML22327A2292022-12-0909 December 2022 Summary of Public Meeting with Holtec International, LLC to Discuss Amendment No. 10 to Certificate of Compliance No. 1032 ML22334A0982022-11-29029 November 2022 Conversation Record: Clarification Call on HI-STORM FW Amendment 7 RAI Response, November 10, 2022 ML21123A0622021-05-0505 May 2021 Summary of Public Meeting with Holtec International to Discuss Upcoming Application for Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind, Amendment No. 7 ML21082A0852021-04-0909 April 2021 Summary of Closed Meeting with Holtec International and U.S. Nuclear Regulatory Commission Regarding Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-Storm FW Systems ML19093A0482019-04-0404 April 2019 Memorandum to C. Regan Summary of March 19, 2019, Meeting with Holtec International to Discuss Proposed Response to the Second RAI for Certificate of Compliance No. 1032 for HI-STORM Flood/Wind, Amendment No. 4 (W/Enclosure 1) ML18289A4132018-10-16016 October 2018 Memorandum to A. Rivera-Varona Summary of September 12, 2018, Licensing Meeting with Holtec International to Discuss Technical Topics Related to Two Amendments Applications (W/Enclosure) ML18255A2102018-09-12012 September 2018 Handout of Meeting with Holtec for Amendment No. 5 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multi-Purpose Canister Storage System Docket No. 72-1032 Summary of Technical Issues 2024-03-08 Category:Note to File incl Telcon Record MONTHYEARML24092A2272024-03-29029 March 2024
[Table view]Conversation Record: HI-STORM Flood/Wind (FW) Storage System Amendment 7: March 20, 2024 ML24079A3192024-03-11011 March 2024 Conversation Record: HI-STORM Flood/Wind (FW) Storage System Amendment 7: February 28, 2024 ML24079A3212024-02-28028 February 2024 Attachment 2 - Conversation Record HI-STORM FW Storage System Amendment 7: Meeting Summary ML24067A1842024-02-0808 February 2024 Conversation Record: HI-STORM Flood/Wind (FW) Storage System Amendment 7: February 8, 2024 ML24065A3032024-01-26026 January 2024 Conversation Record HI-STORM Flood-Wind (FW) Storage System Amendment 7 January 26, 2024 ML24065A3052024-01-26026 January 2024 Attachment 3 - Conversation Record HI-STORM Flood-Wind Storage System Amendment 7 Meeting Summary (Non-proprietary) ML24043A1262024-01-10010 January 2024 Conversation Record: HI-STORM Flood/Wind (FW) Storage System Amendment 7: Holtec Proposed Approach to NRCs Clarification Questions, January 10, 2024 ML23355A1892023-12-18018 December 2023 1. Conversation Record: Clarification Questions for HI-STORM Flood/Wind (FW) Storage System Amendment 7, December 13, 2023 ML23278A2292023-10-0404 October 2023 NRC 699 - Conversation Record_10-04-2023_HI-STORM FW Amd 7 Clarification Discussion ML23216A2192023-08-0303 August 2023 Conversation Record: Discuss Responses to RAI 3-10 for HI-STORM FW Amendment 7, August 3, 2023 ML23177A2782023-06-15015 June 2023 Conversation Record: Discuss Responses to Structural RAIs for HI-STORM FW Amendment 7, June 15, 2023 ML23100A0912023-03-29029 March 2023 Conversation Record NRC Form 699 Discuss Batch 5 RAI for HI-Storm FW Amendment 7, March 29, 2023 ML23030B8592023-01-20020 January 2023 Conversation Record: Discuss Proposed Change 4 - HI-STORM FW Amendment 7 and Proposed Change 6 for HI-STORM 100 Amendment 16 012023 ML22334A0982022-11-29029 November 2022 Conversation Record: Clarification Call on HI-STORM FW Amendment 7 RAI Response, November 10, 2022 ML22237A2702022-08-11011 August 2022 Conversation Record: Clarification Call on HI-STORM FW Amendment 7 RAI Response ML22237A2752022-05-31031 May 2022 Conversation Record: Clarification Call on HI-STORM FW Amendment 7 RAI 5-2 ML21328A0622021-11-17017 November 2021 Conversation Record: HI-STORM Flood/Wind Amendment 7, Feedback on Graded Approach ML19190A0712019-07-0808 July 2019 Conversation Record with B. Khorsandi Et Al./Holtec International Discuss Holtec'S Response to the Supplement to the Second Round of RAI for HI-STORM Flood/Wind Amend No. 4 (Dkt. 72-1032), Conversation Held on July 1, 2019 ML19140A3242019-05-20020 May 2019 Conversation Record with B. Khorsandi Et Al./Holtec International Discuss Holtec'S Response to the Second Round of Request for Additional Information (RAI) for HI-STORM Flood/Wind Amendment No. 4, Conversation Held on 05/09/2019 ML19137A3082019-05-16016 May 2019 Conversation Record with S. Anton, P. Stefanovic, J. Tomlinson and S. Vergugo Et Al./Holtec International Discuss Holtec'S Response to the (Rsi) for HI-STORM Flood/Wind (Dkt. 72-1032), Conversation Held on May 14, 2019 ML19072A1662019-03-13013 March 2019 Conversation Record with S. Anton, B. Khorsandi, R. Ngwayah, J. Tomlinson/Holtec Proposed Approach in Response to Nrc'S Second Round of RAI for Hi/Storm Flood/Wind Amendment No. 4 (Docket No. 72-1032), Conversation Held on March 7, 2019 2024-03-29 Category:Verbal Comm MONTHYEARML24092A2272024-03-29029 March 2024
[Table view]Conversation Record: HI-STORM Flood/Wind (FW) Storage System Amendment 7: March 20, 2024 ML24079A3192024-03-11011 March 2024 Conversation Record: HI-STORM Flood/Wind (FW) Storage System Amendment 7: February 28, 2024 ML24079A3212024-02-28028 February 2024 Attachment 2 - Conversation Record HI-STORM FW Storage System Amendment 7: Meeting Summary ML24067A1842024-02-0808 February 2024 Conversation Record: HI-STORM Flood/Wind (FW) Storage System Amendment 7: February 8, 2024 ML24065A3032024-01-26026 January 2024 Conversation Record HI-STORM Flood-Wind (FW) Storage System Amendment 7 January 26, 2024 ML24065A3052024-01-26026 January 2024 Attachment 3 - Conversation Record HI-STORM Flood-Wind Storage System Amendment 7 Meeting Summary (Non-proprietary) ML24043A1262024-01-10010 January 2024 Conversation Record: HI-STORM Flood/Wind (FW) Storage System Amendment 7: Holtec Proposed Approach to NRCs Clarification Questions, January 10, 2024 ML23355A1892023-12-18018 December 2023 1. Conversation Record: Clarification Questions for HI-STORM Flood/Wind (FW) Storage System Amendment 7, December 13, 2023 ML23278A2292023-10-0404 October 2023 NRC 699 - Conversation Record_10-04-2023_HI-STORM FW Amd 7 Clarification Discussion ML23216A2192023-08-0303 August 2023 Conversation Record: Discuss Responses to RAI 3-10 for HI-STORM FW Amendment 7, August 3, 2023 ML23177A2782023-06-15015 June 2023 Conversation Record: Discuss Responses to Structural RAIs for HI-STORM FW Amendment 7, June 15, 2023 ML23100A0912023-03-29029 March 2023 Conversation Record NRC Form 699 Discuss Batch 5 RAI for HI-Storm FW Amendment 7, March 29, 2023 ML23030B8592023-01-20020 January 2023 Conversation Record: Discuss Proposed Change 4 - HI-STORM FW Amendment 7 and Proposed Change 6 for HI-STORM 100 Amendment 16 012023 ML22334A0982022-11-29029 November 2022 Conversation Record: Clarification Call on HI-STORM FW Amendment 7 RAI Response, November 10, 2022 ML22237A2702022-08-11011 August 2022 Conversation Record: Clarification Call on HI-STORM FW Amendment 7 RAI Response ML22237A2752022-05-31031 May 2022 Conversation Record: Clarification Call on HI-STORM FW Amendment 7 RAI 5-2 ML21328A0622021-11-17017 November 2021 Conversation Record: HI-STORM Flood/Wind Amendment 7, Feedback on Graded Approach ML19190A0712019-07-0808 July 2019 Conversation Record with B. Khorsandi Et Al./Holtec International Discuss Holtec'S Response to the Supplement to the Second Round of RAI for HI-STORM Flood/Wind Amend No. 4 (Dkt. 72-1032), Conversation Held on July 1, 2019 ML19140A3242019-05-20020 May 2019 Conversation Record with B. Khorsandi Et Al./Holtec International Discuss Holtec'S Response to the Second Round of Request for Additional Information (RAI) for HI-STORM Flood/Wind Amendment No. 4, Conversation Held on 05/09/2019 ML19137A3082019-05-16016 May 2019 Conversation Record with S. Anton, P. Stefanovic, J. Tomlinson and S. Vergugo Et Al./Holtec International Discuss Holtec'S Response to the (Rsi) for HI-STORM Flood/Wind (Dkt. 72-1032), Conversation Held on May 14, 2019 ML19072A1662019-03-13013 March 2019 Conversation Record with S. Anton, B. Khorsandi, R. Ngwayah, J. Tomlinson/Holtec Proposed Approach in Response to Nrc'S Second Round of RAI for Hi/Storm Flood/Wind Amendment No. 4 (Docket No. 72-1032), Conversation Held on March 7, 2019 2024-03-29 |
Text
Conversation Record Summary Clarification Call with Holtec on HI-STORM Flood/Wind (FW) Amen dment 7 January 26, 2024
- 1. Strain rate effects: Holtec stated that it will not consider strain rate effects fo r Metamic--HT based on staffs comments during the January 10, 2024 meeting. Holtec will keep the strain rate effects as an inherent conservatism for their analysis.
- 2. Treatment of localized stresses : Holtec presented several reasons for local stresses and had made adjustments in its model (of the multi-purpose caniste r [MPC]-37-CBS) to reduce these occurrences.
- a. Due to the presence of higher local stresses at element boun daries where temperature-dependent properties had the greatest delta, Holtec had changed the temperature-dependent properties to be more granularized than b efore. Holtec changed the number of temperature-dependent properties used for the basket from 4 to 13. Holtec also reduced the temperatures to be closer to the actuals, rather than providing a large margin. For example, where the thermal analyt ical maximum was 358°C, Holtec used 380°C for structural model.
- b. [
PROPRIETARY INFORMATION WITHHELD IN ACCORDANCE WITH 10CFR2.390
]
- 3. Enhanced LS-DYNA model for 37-CBS basket : Holtec considered MPC-37-CBS as a bounding basket and made the following changes to the model f or MPC-37-CBS basket analysis:
[
PROPRIETARY INFORMATION WITHHELD IN ACCORDANCE WITH 10CFR2.390
]
With these changes, Holtec has improved the results as follows:
- i. Deflection results have changed from SF of 1.25 to 1.9. (Hol tec does not plan to replace the existing deflection results in the safety analysis report [ SAR] because they include conservative margins.)
ii. All total stress results are below 100% true ultimate stres s. Local stress concentrations shown appear to be at basket notch/slot junctions.
Attachment 2
- 4. Next step: Holtec plans to update the calculation packages and revise SAR chapters 2 and 3 to explain its current approach of using MPC-37-CBS for bound ing analysis.
[PROPRIETARY INFORMATION WITHHELD IN ACCORDANCE WITH 10CFR2.390
Holtec plans to provide written responses to clarification ques tions to RAI responses, including SAR changes, by February 15, 2024.
Staff questioned throughout the meeting whether Holtec plans to perform these changes for a different basket other than MPC-37-CBS, e.g., MPC-37, where loc al total stresses were two times of the allowable. Holtec agreed that it would consider it as a sensitivity study although it might delay the anticipated response schedule.