MONTHYEARML18060A3322018-02-28028 February 2018 Enclosurequest for Additional Request (Request for Additional Information Regarding GE-Hitachis Decommissioning Funding Plan Update for Morris ISFSI) Project stage: RAI ML18117A4722018-04-27027 April 2018 International - HI-STORM FW Amendment 4 Response to Request for Additional Information Project stage: Response to RAI ML18166A0032018-06-0808 June 2018 Submittal of License Application Revision 2 and Request to Restart Review of Application for Approval of the WCS CISF Project stage: Request ML18208A6372018-07-27027 July 2018 Supplement to HI-STORM FW Amendment 4 RAIs Responses Project stage: Request ML18291B0812018-10-17017 October 2018 Summary of Meeting with Holtec International, Inc. to Discuss the Upcoming Submittal of the Application for Renewal If the Storage Certificate of Compliance No. 1008 for the HI-STAR 100 Cask System Project stage: Meeting ML18291B2292018-10-17017 October 2018 Memorandum to M. Layton Summary of Sept. 12, 2018, Meeting with Holtec International, Inc. to Discuss the Upcoming Submittal of the Application for Renewal If the Storage Certificate of Compliance No. 1008 for the HI-STAR 100 Cask System Project stage: Request ML18360A0052018-12-26026 December 2018 Letter to J. Isakson Approval of Interim Storage Partners Request for Withholding Information from Public Disclosure - Waste Control Specialists Consolidated Interim Storage Facility Project stage: Withholding Request Acceptance ML19011A1272019-01-29029 January 2019 Letter to K. Manzione Amendment No. 4 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System - Second Request for Additional Information (W/Enclosure) Project stage: RAI ML19120A2172019-04-26026 April 2019 Memo to File Environmental Assessment and Finding of No Significant Impact for Energy Northwest Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72,30(b) and 72.30(c) for Humboldt Bay ISFSI Project stage: Other ML19120A2162019-04-26026 April 2019 Package: Environmental Assessment and Finding of No Significant Impact for Energy Northwest Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72,30(b) and 72.30(c) for Humboldt Bay ISFSI Project stage: Request ML19165A1152019-06-14014 June 2019 Memoranda to File Environmental Assessment and Finding of No Significant Impact for the Virginia Electric and Power Company, Dominion Energy Kewaunee, Inc., and Dominion Nuclear Connecticut, Inc.S Decommissioning Funding Plans Submitted Project stage: Other ML19165A1142019-06-14014 June 2019 Package: Environmental Assessment and Finding of No Significant Impact for the Virginia Electric and Power Company, Dominion Energy Kewaunee, Inc., and Dominion Nuclear Connecticut, Inc.'S Decommissioning Funding Plans Submitted Project stage: Request ML21096A2342021-04-0505 April 2021 Partially Closed Pre-application Meeting for the Holtec International HI-STORM Flood/Wind Multipurpose Canister Storage System, Amendment No. 7 Project stage: Meeting ML21105A3702021-04-20020 April 2021 Handout for Pre-Application Meeting with Holtec on HI-STORM FW Amendment No. 7 (April 20, 2021) Project stage: Meeting ML21123A0622021-05-0505 May 2021 Summary of Public Meeting with Holtec International to Discuss Upcoming Application for Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind, Amendment No. 7 Project stage: Meeting ML21126A2672021-05-0606 May 2021 International HI-STORM FW Amendment 7 Request Project stage: Request ML21237A1762021-08-25025 August 2021 Request for Supplemental Information Re Holtec Intl HI-STORM Flood/Wind Multipurpose Canister Storage System, Coc No. 1032, Amendment 7 Project stage: Other ML21237A1772021-08-25025 August 2021 Request for Supplemental Information for Amendment No. 7 to Certificate of Compliance No. 1032 for the Hi-Storm Flood/Wind Multipurpose Canister Storage System Project stage: Other ML21251A5502021-09-0808 September 2021 International, Schedule for Responses to HI-STORM FW Amd. 7 Requests for Supplemental Information Project stage: Supplement ML21288A5212021-10-15015 October 2021 Holtec International HI-STORM FW Amendment 7 Responses to Requests for Supplemental Information Project stage: Request ML21288A5422021-10-15015 October 2021 Attachment 19: Affidavit of Kimberly Manzione Project stage: Other ML21322A2902021-11-24024 November 2021 Acceptance Review of the Request for Amendment 7 to Certificate of Compliance No. 1032 for HI-STORM Flood/Wind Multipurpose Canister Storage System Project stage: Acceptance Review ML22172A1932022-06-30030 June 2022 Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Request for Additional Information Batch 2 Project stage: RAI ML22192A2252022-07-11011 July 2022 Attachment 9: Affidavit in Accordance with 10CFR2.390 Project stage: Other ML22192A2162022-07-11011 July 2022 International, HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part I Project stage: Response to RAI ML22192A2182022-07-11011 July 2022 Attachment 2: HI-STORM FW Amendment 7 RAI Responses Part I (non-proprietary) Project stage: Other ML22192A2152022-07-11011 July 2022 International, HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part Project stage: Request ML22192A2192022-07-11011 July 2022 Attachment 3: HI-STORM FW Amendment 7 Certificate of Compliance Appendix a, Changed Pages (non-proprietary) Project stage: Other ML22192A2202022-07-11011 July 2022 Attachment 4: HI-STORM FW Amendment 7 Certificate of Compliance Appendix B, Changed Pages (non-proprietary) Project stage: Other ML22192A2222022-07-11011 July 2022 Attachment 6: HI-STORM FW FSAR Proposed Revision 10B, Changed Pages (non-proprietary) Project stage: Other ML22194A9542022-07-13013 July 2022 International, HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 1 - Additional Supporting Documents Project stage: Response to RAI ML22194A9572022-07-13013 July 2022 Attachment 3: Affidavit in Accordance with 10CFR2.390 Project stage: Other ML22210A1452022-07-29029 July 2022, 29 September 2022 HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 2 Project stage: Request ML22210A1462022-07-29029 July 2022 HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 2 Project stage: Response to RAI ML22210A1482022-07-29029 July 2022 Attachment 2: Updated Summary of Proposed Changes (non-proprietary) Project stage: Request ML22210A1492022-07-29029 July 2022 Attachment 3: HI-STORM FW FSAR Proposed Revision 10C, Changed Pages Project stage: Other ML22210A1502022-07-29029 July 2022 Attachment 4: HI-STORM FW FSAR Proposed Revision 10C, Changed Pages (non-proprietary) Project stage: Other ML22210A1532022-07-29029 July 2022 Attachment 7: Affidavit in Accordance with 10CFR2.390 Project stage: Other ML22258A2512022-09-15015 September 2022 International, HI-STORM FW Amendment 7 RAI Responses Part 1 Clarification Call Action Items Project stage: Other ML22258A2502022-09-15015 September 2022 International, HI-STORM FW Amendment 7 RAI Responses Part 1 Clarification Call Action Items Project stage: Request ML22210A1472022-09-29029 September 2022 Attachment 1: HI-STORM FW Amendment 7 RAI Responses Part 2 (non-proprietary) Project stage: Other ML22276A2812022-10-0303 October 2022 HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 3 Project stage: Request ML22276A2822022-10-0303 October 2022 International, HI-STORM FW Amendment 7 Responses to Requests for Additional Information Part 3 Project stage: Response to RAI ML22286A0012022-10-12012 October 2022 NRC Form 699 for Technical Discussions from March 15 to 17 of 2022 Related to the Application of the Castor geo69 Storage System (Docket No. 72-1052) (Redacted) Project stage: Other ML22336A1342022-12-0101 December 2022 Attachment 1 - Holtec Clarification of Response to Request for Additional Information 5-2 Project stage: Response to RAI ML22336A1322022-12-0101 December 2022 HI-STORM FW Amendment 7 RAI 5-2 Response Clarification Project stage: Request ML22336A1332022-12-0101 December 2022 HI-STORM FW Amendment 7 RAI 5-2 Response Clarification Project stage: Other ML22336A1352022-12-0101 December 2022 Attachment 2 - HI-STORM FW FSAR Proposed Revision 10F, Changed Pages Project stage: Other ML22326A3582022-12-0707 December 2022 Amendment 7 to CoC No. 1032 for HI-STORM FW, Request for Additional Information Batch 4 Project stage: Request ML22326A3592022-12-0707 December 2022 Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Request for Additional Information Batch 4 Enclosure 1 Project stage: RAI 2021-05-05
[Table View] |
Text
Attachment 1 Observations following Holtec/NRC meeting on January 26, 2024 For HI-STORM FW Amendment 7 During the meeting on January 26, Holtec presented LS-DYNA modeling enhancements that it is planning to make to the fuel basket analyses for HI-STORM FW Amendment 7. These enhancements included 1) use of a thick shell element with a more robust numerical formulation; and 2) increasing the discretization of the fuel basket temperature-dependent zones, increasing from 4 to 13. Holtec had performed the analysis using this enhanced LS-DYNA model for the MPC-37-CBS fuel basket and presented some promising results, showing that the basket permanent deflections and corresponding stress results met the corresponding acceptance criteria described in the current version of the SAR.
Holtec confirmed that it plans to provide the results of one fuel basket analysis, those of the MPC-37-CBS, in order to qualify all other fuel baskets currently employed for the FW system. It believes that, based on the MPC-37-CBS basket geometry and fuel assembly weight, it will experience the highest loading demands. Holtec plans to establish a parameter based on a combination of the fuel basket cell width, basket thickness, and fuel assembly weight that will indicate the bounding basket, and this parameter will show that, by comparison, the other baskets are bounded by the MPC-37-CBS results.
During the meeting, the NRC asked whether any sensitivity studies that employ the enhanced analyses of additional fuel baskets were planned to validate Holtecs proposed bounding parameter comparison. The NRC noted that a review of the stress contour plots for the baskets submitted in November 2023 indicate that some show much higher stress results than those of the MPC-37-CBS basket. Holtec indicated it was receptive to performing a sensitivity study with other basket types to support the bounding basket parameter.
Since the January 26 meeting, the NRC has observations on the proposed methodology that the staff believes Holtec should consider in determining the fuel basket that will produce the bounding deflection and stress results:
- a. The temperature magnitudes and distribution of temperature zones affect the structural behavior and capacity of the fuel baskets but do not appear to be accounted for in the proposed bounding fuel basket parameter. Higher temperatures decrease the structural capacity of the basket material and change the mechanical behavior. It seems possible that a basket might not be identified as bounding when considering only its slenderness and fuel weight but could actually be the bounding basket if subjected to higher design temperatures.
For example, the MPC-37-CBS baskets maximum temperature was reduced from 380 °C to 360 °C and the resulting stresses were reduced. Additionally, there are other baskets with temperature zones that have maximum temperatures of 380 °C and 365 °C which have reduced stress allowables compared to the 360 °C and may not be bounded by the 360 °C enhanced analysis of the MPC-37-CBS basket.
2
- b. The weight and stiffness of other cask components could affect the structural behavior of the fuel baskets but were not discussed in regard to the proposed bounding fuel basket parameter. Increasing the stiffness of components in the load path and the weight of other cask components, particularly the overpack, could increase the structural demand on the fuel basket.
For example, the MPC-37-CBS basket is indicated as only compatible with the Standard and Version E overpacks and not the Version UVH overpack. A review of the current vertical decelerations reported for the tip-over of various overpack/fuel basket pairings indicate that the UVH has a substantially higher acceleration (~90 g) than those of the Standard and Version E overpacks (~50-70 g). However, the proposed bounding fuel basket parameter does not account for the impact energy levels imparted to the fuel baskets, particularly those associated with differences in overpacks.
The staff is providing these observations for Holtecs consideration in its proposed method for identifying a bounding fuel basket.