ML23030B859

From kanterella
Jump to navigation Jump to search
Conversation Record: Discuss Proposed Change 4 - HI-STORM FW Amendment 7 and Proposed Change 6 for HI-STORM 100 Amendment 16 012023
ML23030B859
Person / Time
Site: 07201032, Holtec
Issue date: 01/20/2023
From: Yen-Ju Chen
Storage and Transportation Licensing Branch
To: Elisio D, Griffiths J, Manzione K
Holtec
References
Download: ML23030B859 (1)


Text

NRC FORM 699 U.S. NUCLEAR REGULATORY COMMISSION (11-2017)

CONVERSATION RECORD NAME OF PERSON(S)/TITLE CONTACTED OR IN CONTACT WITH YOU DATE OF CONTACT TYPE OF CONVERSATION See below. 01/20/2023 E-MAIL E-MAIL ADDRESS TELEPHONE NUMBER TELEPHONE INCOMING OUTGOING ORGANIZATION DOCKET NUMBER(S)

Holtec International, Inc. 07201032, 07201014 LICENSE NAME AND NUMBER(S) MAIL CONTROL NUMBER(S)

SUBJECT Clarification call with Holtec on proposed change #4 for HI-STORM FW Amendment 7 application and proposed change #6 for HI-STORM 100 Amendment 16

SUMMARY

AND ACTION REQUIRED (IF ANY)

NRC attendees: Jimmy Chang, Yen-Ju Chen, Darrell Dunn, Loren Howe, Jon Woodfield Holtec attendees: Denise Elisio, John Griffiths, Kimberly Manzione Staff has questions on proposed change (PC) #4 for FW Amendment 7 and PC #6 for HI-STORM 100 Amendment 16. This PC changes the hydrostatic pressure test and liquid penetrate NDE after the pressure test of the MPC lid to shell weld acceptance criteria to be examination for leakage only and remove post hydrostatic test liquid penetrate (PT) examination.

Staff would like to know the operating experience with the post-pressure test PT examinations. For the PT examinations, Holtec stated that they have been performing the hydrostatic test first and followed by PT weld examinations, and there has never been any issue with the post-pressure PT weld examinations. Almost 2,000 systems have been load and the hydrostatic test performed on the MPC, in which more than 1,000 are HI-STORM 100 system and more than 250 are FW system.

Staff also asked what was the actual type of leakage examination performed as stated in FW FSAR, section 9.2.4 (change page 9-16). Holtec stated they will perform only a visual examination to check for water leakage through the MPC lid to shell weld after the hydrostatic pressure test.

NAME OF PERSON DOCUMENTING CONVERSATION Yen-Ju Chen SIGNATURE DATE OF SIGNATURE Digitally signed by Yen-Ju Chen Yen-Ju Chen Date: 2023.01.25 10:20:40 -05'00' NRC Form 699 (11-2017) Page 1 of 1