ML20062C381

From kanterella
Revision as of 17:04, 1 June 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Insp Rept 50-293/82-14 on 820517-21.No Noncompliance Noted
ML20062C381
Person / Time
Site: Pilgrim
Issue date: 07/21/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20062C387 List:
References
NUDOCS 8208050239
Download: ML20062C381 (2)


See also: IR 05000293/1982014

Text

1

.

,.

. .

11 JUL 1982

Docket No. 50-293

Boston Edison Company M/C Nuclear

ATTN: Mr. William D. Harrington

Senior Vice President, Nuclear

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject: Inspection No. 50-293/82-14

This refers to the routine safety inspection conducted by Mr. D. J. Collins of

this office on May 17-21, 1982 at Plymouth, Massachusetts of activities authorized

by NRC License No. DPR-35 and to the discussions of our findings held by Mr.

Collins with Mr. W. J. Armstrong of your staff at the conclusion of the inspection,

and to a subsequent telephone discussion between Mr. E. Greenman of our, staff

and Mr. C. Mathis on July 8,1982.

J

l Areas examined during this inspection are described in the NRC Region I Inspection

'

Report which is enclosed with this letter. Within these areas, the inspection

_

consisted of selective examinations of proce,dures and representative records,

interviews with personnel, measurements made by the inspectors, and observations

by the inspectors.

Our inspector also verified the steps you have taken to correct the violations

brought to your attention in letters dated March 8, 1978; August 17, 1978;

February 15, 1980; July 22, 1980; January 15, 1981; and June 8, 1981. We have

no further questions regarding the steps you took to correct item I referred

to in our March 8, 1978 letter; the items in our August 17, 1978 and February

, 15, 1980 letters; items C, D, F, G in our letter dated July 22, 1980; item A

in our January 15, 1981 letter; and item B in our June 8,1981 letter.

Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

'

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

,

application to withhold information contained therein within thirty days of

l the date of this letter. Such application must be consistent with the require-

ments of 2.790(b)(1). The telephone notification of your intent to request

withholding, or any request for an extension of the 10 day period which you

believe necessary, should be made to the Supervisor, Files, Mail and Records,

USNRC Region I, at (215) 337-5223.

OFFICIAL RECORD COPY

ll

8208050239 820721

gDRADOCK05000

hg

- . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _

. .

. .

Boston Edison Conoany M/C fluclear 2 21 JUL 1982

No reply to this letter is required. Your cooperation with us in this mtter

is appreciated.

Sincerely,

ti to

sion of Enr ne. ring and

hnical Pros as

Enclosure: NRC Region I Inspection Report Number 50-293/82-14

cc w/cncl:

A. V. Morisi, Manager, Nuclear Operations Support

R. D. Machon, Nuclear Operations Manager - Pilgrim Station

Joanne Shotwell, Assistant Attorney General

Jon N. Bonsall, Chairman, Department of Public Utilities

Plymoutn Board of Selectmen

Plymouth Civil Defense Director

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

Commonwealth of flassachusetts (2)

NRC Resident Inspector

bec w/ encl:

RegionIDocketRoom(withconcurrences)

Chief, Operational Support Section (w.o encls)

Chief, Reactor Projects Section 1B

RI: 037y 1

$h[ h\W

R'I:DETP RI:DETP I:D P RI: P

CollJh,s/ gwc Wray Greenman Joyner tn

7/9/82 7-2 0-82.

OFFICIAL RECORD COPY

_______ _ ___ -_________ _