1
,.
.
.
.
11 JUL 1982
Docket No.
50-293
Boston Edison Company M/C Nuclear
ATTN: Mr. William D. Harrington
Senior Vice President, Nuclear
800 Boylston Street
Boston, Massachusetts 02199
Gentlemen:
Subject:
Inspection No. 50-293/82-14
This refers to the routine safety inspection conducted by Mr. D. J. Collins of
this office on May 17-21, 1982 at Plymouth, Massachusetts of activities authorized
by NRC License No. DPR-35 and to the discussions of our findings held by Mr.
Collins with Mr. W. J. Armstrong of your staff at the conclusion of the inspection,
and to a subsequent telephone discussion between Mr. E. Greenman of our, staff
and Mr. C. Mathis on July 8,1982.
J
l
Areas examined during this inspection are described in the NRC Region I Inspection
'
Report which is enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of proce,dures and representative records,
_
interviews with personnel, measurements made by the inspectors, and observations
by the inspectors.
Our inspector also verified the steps you have taken to correct the violations
brought to your attention in letters dated March 8, 1978; August 17, 1978;
February 15, 1980; July 22, 1980; January 15, 1981; and June 8, 1981. We have
no further questions regarding the steps you took to correct item I referred
to in our March 8, 1978 letter; the items in our August 17, 1978 and February
15, 1980 letters; items C, D, F, G in our letter dated July 22, 1980; item A
,
in our January 15, 1981 letter; and item B in our June 8,1981 letter.
Within the scope of this inspection, no violations were observed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
'
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
,
l
the date of this letter. Such application must be consistent with the require-
ments of 2.790(b)(1). The telephone notification of your intent to request
withholding, or any request for an extension of the 10 day period which you
believe necessary, should be made to the Supervisor, Files, Mail and Records,
USNRC Region I, at (215) 337-5223.
OFFICIAL RECORD COPY
ll
8208050239 820721
hg
gDRADOCK05000
-
.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _
.
.
.
.
Boston Edison Conoany M/C fluclear
2
21 JUL 1982
No reply to this letter is required.
Your cooperation with us in this mtter
is appreciated.
Sincerely,
ti
to
sion of Enr ne. ring and
hnical Pros
as
Enclosure: NRC Region I Inspection Report Number 50-293/82-14
cc w/cncl:
A. V. Morisi, Manager, Nuclear Operations Support
R. D. Machon, Nuclear Operations Manager - Pilgrim Station
Joanne Shotwell, Assistant Attorney General
Jon N. Bonsall, Chairman, Department of Public Utilities
Plymoutn Board of Selectmen
Plymouth Civil Defense Director
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
Commonwealth of flassachusetts (2)
NRC Resident Inspector
bec w/ encl:
RegionIDocketRoom(withconcurrences)
Chief, Operational Support Section (w.o encls)
Chief, Reactor Projects Section 1B
$h[
h\\W
037y 1
R'I:DETP
RI:DETP
I:D P
RI:
P
RI:
CollJh,s/ gwc
Wray
Greenman
Joyner
tn
7/9/82
7-2 0-82.
OFFICIAL RECORD COPY
_______ _ ___ -_________ _