Ack Receipt of Informing NRC of Steps Taken to Correct Noncompliance Noted in Insp Repts 50-313/86-04 & 50-368/86-04
ML20214K438
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 11/20/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
References
NUDOCS 8612020303
Download: ML20214K438 (2)


Text

aC 'J NOV 2 01986 In Reply Refer To:

Dockets: 50-313/86-04 50-368/86-04 Arkansas Power & Light Company ATTN: Mr. Gene Campbell Vice President, Nuclear-Operations P. O. Box 551 Little Rock, Arkansas 72203 Gentlemen:

Thank you for your letter of October 17, 1986, in response to our letter of September 29, 1986. Based on our review of your response, we have no further questions at this time on your proposed corrective actions. We will

,

review the implementation of these actions during a future inspection to ensure they have been effective in precluding future noncompliance.

Sincerely,

" Original Signed b .

R. E. Hall" ovl J. E. Gagliar o, Chief Reactor Projects Branch cc:

J. M. Levine, Director Site Nuclear Operations Arkansas Nuclear One

!

'

P. O. Box 608 Russellville, Arkansas 72801 Arkansas Radiation Control Program Director bcc: (see next page)

.

s R W M PS C:EP&SI C:R&SPB C:RPB/ RPB N;Werc/jt LAYand WLFisher DRHunter ' EGagliardo

]II /11/86 g/3/86 ll /l7/86 \\/\%/86 .

// //f/86

/

e612O20303 e61120 PDR G

ADOCK 05000313 PDR / h[I

/f I g k

. .

. . , - - - ..

-. . . - - _ -

. o Arkansas Power and Light -2-bec to DMB (IE35)

bec distrib. by RIV:

RPB Resident Inspector R. D. Martin, RA R&SPB Section Chief (RPB/B)

D. Weiss, LFMB (AR-2015)

RIV File DRSP RSB MIS SYSTEM RSTS Operator Inspector Section Chief W. L. Fisher R. L. Bangart D. B. Matthews, IE

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK, ARKANSAS 72203 (501)371-4000 October 17, 1986 (5hI$$

BCAN198605

!h ' *

Mr. Robert N2 ,

Regional Administrator #

U. S. Nuclear Regulatory Commission -

Region IV -

611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 SUBJECT: Arkansas Nuclear One - Units 1 & 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Violation Response

Dear Mr. Martin:

.

The Arkansas Power and Light Company (AP&L) is in receipt of your correspondence of September 29, 1986 (0CNA098618)

In order to resolve the subject issues of that letter, the following actions will be taken:

A. Inadequate Training of Personnel (313/368/8604-01): Revisions to procedure 1903.43, " Duties of the Emergency Radiation Team", will be incorporated to provide additional guidance to health physics personnel in evaluating the radiological habitability of the control room environment and continuously advising the Shift Operations Supervisor of the status of radiological conditions. Lesson Plan AX20901-005

"Onsite Monitoring" will be revised to emphasize this procedural guidance during training. Health physics drills, which are currently scheduled for its first quarter of 1987, will include control room habitability evaluation as part of the drill scope.

B. Inadequate Procedures and Equipment (313/368/8604-02):

Procedure 1905.002, "Offsite Emergency Monitoring", will be revised to contain additional guidance for field monitoring teams to aid them in determining whether or not a specific sample has been taken while immersed in a radioactive plume. Lesson plan AX20901-040 " Radiological

, n,, n. A. [

l et3idi wW M'"1 y 16-260 h- MEMSEA MIDDLE SOUTH UTILITIES SYSTEM

', _-

, . .* *

Mr. Rob 2rt October 17, 1986

  • Field Monitoring" will also be revised to stress the use of the additional procedural guidance in the field. The training will be enhanced by the inclusion of these activities as objectives for the offsite monitoring portions of the 1987 health physics drills.

The action prescribed to resolve both of these issues will be completed by March 1, 1987, AP&L believes that these efforts will adequately address the NRC concerns.

Very truly yours,

,

. Ted Enos, Manager Nuclear Engineering and Licensing JTE:MT:1w

.

.