Forwards Insp Repts 50-313/90-40 & 50-368/90-40 on 901015-19.No Violations Noted
ML20062D576
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 10/31/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Carns N
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20062D582 List:
References
NUDOCS 9011130367
Download: ML20062D576 (3)


See also: IR 05000313/1990040

Text

.

Yo: 4 I

. OCT 31 1990

Docket Nos. 50-313/90-40- l

'

50-368/90-40-

License Nos. DPR-51

NPF-6

Entergy Operations, Inc. I

ATTN: Neil S. Carns, Vice President

Operations, Arkansas Nuclear One

Route 3 Box 137G

Russellville, Arkansas 72801

Gentlemen:

This refers to the inspection conducted by Mr. W. M. McNeill of this office

during the period October 15-19, 1990, of activities authorized by NRC

Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2,

and to the discussion of our findings with Mr. J. D. Vandergrift and other

members of your staff at the conclusion of the inspection.

The areas examined during the inspection were actien on a previously identified-

inspection finding and inservice inspection. Within these areas, the

' inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspector. The

inspection findings are documented in the enclosed inspection report.

This. report does not include specific inspection followup for any Diagnostic

Evaluation Team findings (reference Diagnostic Evaluation Team Report issued

December 21,1989).

Within the' scope of the inspection, no violations or deviations were identified.

Should'you have any -questions concerning this inspection, we will be pleased = to

discuss them with you,

i- Sincerely,

k  ;

. Samuel J.-Collins, Director

Division of Reactor Projects

Enclosure:'(seenextpage)

RIV:RI:NQPSf6 D:DRS M D:DRP M

WMcNeill/cjg C:MQPS[~

IBarne LJCalks$ol30 SJCollins

/0/s9/90 m /29/90 to /)6/90 g/Jo/90

!

-

V e -

pp ADO gh

a

.- .

t%

. .-

..

..'. 't

!

.

.,

Entergy Operations, Inc. -2-

i

Enclosure:

-Appendix - NRC Inspection Report

50-313/90-40

50-368/90-40

cc w/ enclosure:

Entergy Operations, Inc.

ATTN: Donald C. Hintz, Executive Vice

President & Chief Operating Officer

.P.O. Box-31995

Jackson, Mississippi 39286

Entergy Operations, Inc. '

ATTH: Gerald W. Muench, Vice President

Operations Support

P.O. Box 31995 t

Jackson, Mississippi 39286

Wise, Carter, Child & Caraway

,

ATTH: Robert B. McGehee, Esq.

=P.O. Box 651

Jackson,' Mississippi 39205

Arkansas Nuclear One '

j ATTH: Early-Ewing, General Manager

Technical Support and Assessment

Route 3 Box 137G

Russellville, Arkansas 72801

l- Arkansas Nuclear One

-: ATTH: Jerry Yelverton, Director

.

Nuclear Operations-

Route 3. Box 137G

Russellville, Arkansas -72801

Arkansas Nuclear One

ATTN: Mr. Tom W. Nickels

Route 3, Box 137G

,

Russellville, Arkansas 72801

! Combustion Engineering, Inc.

'ATTH: Charles B. Brinkman, Manager

Washington Nuclear Operations

112300 Twinbrook Parkway, Suite 330

Rockville, Maryland 20852

'

Honorable Joe W. Phillips

County Judge of; Pope County

Pope County Courthouse

~Russellville, Arkansas 72801

- .. ..

L .. . -

r

.

.

..

.

-

.

Entergy Operations,.Inc. -3-

Winston & Strawn

ATTN: Nicholas S. Reynolds, Esq.

1400 L Street, N.W.

Washington, D.C. 20005-3502 ,

!

Arkansas Department of Health

~ ATTN: Ms. Greta Dicus, Director

Division of Environmental Health

Protection i

4815 West Markam. Street

Little Rock, Arkansas 72201

Babcock & Wilcox.

Nuclear Power Generation Division

ATTN: Mr. Robert B. Borsum ,

1700 Rockville Pike,- Suite 525

Rockville, Maryland 20852

' Admiral Kinnaird R. McKee, USN.(Ret)

P.O. Box 41

0xford, Maryland 21654

bectoDMB(IE01)

l. bec distrib. by RIV:

l

  • R..D. Martin * Resident Inspector.

!

  • DRSS-FRPS *SectionChief(DRP/A)

. Lisa Shea, RM/ALF *RIV File

o *DRP * MIS System.

L *RSTS Operator. *ProjectEngineer(DRP/A)'

  • DRS
  • T. Alexion, NRR Project Manager (HS: 13-E-21)

- * C. Poslusny, NRR Project Manager (MS:- 13-D-18)

g'

I *W. McNeill

! *I. Barnes.

l R. Wise 3

  • w/766

!

l

!

,