Forwards Insp Repts 50-313/99-03 & 50-368/99-03 on 990202- 17.No Violations Noted
ML20205L771
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 04/09/1999
From: Marschall C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
Shared Package
ML20205L776 List:
References
50-313-99-03, 50-313-99-3, 50-368-99-03, 50-368-99-3, NUDOCS 9904140286
Download: ML20205L771 (5)


See also: IR 05000313/1999003

Text

T

.

" "'4<,k

UNITED STATES

' ..

.l'

NUCLEAR REGULATORY COMMISSION

a

!

E

,a

REGloN IV

,

611 RYAN PLAZA DRIVE, sulTE 400

,

,,,g'

ARLINGTON, TEXAS 76011-8064

1

i

APR-91999

C. Randy Hutchinson, Vice President

Operations

Arkansas Nuclear One

Entergy Operations, Inc.

1448 S.R. 333

Russellville, Arkansas 72801-0967

SUBJECT: NRC SPECIAL INSPECTION REPORT 50-313/99-03; 50-368/99-03

Dear Mr. Hutchinson:

This refers to the inspection conducted on February 2-17,1999, at the Arkansas Nuclear One,

Units 1 and 2, reactor facility. The purpose of the inspection was to follow up on the draining of

the Unit 2 reactor coolant system and unplanned entry into reduced inventory conditions on

February 2,1999. The enclosed report presents the results of this inspection.

The results of this inspection indicata that your procedures and training wer' not adequate to

safely lower the level in the Unit 2 refueling canal to the top of the reactor vessel. A procedure

i

l

error, inadequate procedural controls, operator error, and inadequate training reflected a lack of

!

recognition of the potential hazards associated with lowering the water level in the refueling

!

canal As a result, water level was lowered in the reactor vessel at an unintentionally high rate.

Rapid operator action was required to ensure that the water level in the reactor coolant system

remained sufficient for the proper operation of the shutdown cooling system.

Based on the re.,ults of this inspection, the NRC has determined that three violations of NRC

requirements occurred. These violations are being treated as noncited violations (NCVs),

consistent with Appendix C of the Enforcement Policy. These NCVs are described in the

subject inspection report. If you contest the violation or severity level of these NCVs, you

should provide a response within 30 days of the date of this inspection report, with the basis for

your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington, DC 20555-0001, with copies to the Regional Administrator, Region IV, and the

Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,

DC 20555-0001.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed ir, the NRC Public Document Room.

!

9904140286 990409

PDR

ADOCK 05000313

G

PDR

l

l

l

L.

.

1

=.

i

..

Entergy Operations, Inc.

-2-

i

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

. . .

U

Charles S. Marschall, Chief

Project Branch C

Division of Reactor Projects

Docket Nos.: 50-313

50-368

l

License Nos.: DPR-51

NPF-6

1

!

Enclosure:

i-

NRC Inspection Report No.

50-313/99-03;50-368/99-03

l

cc w/ enclosure:

Executive Vice President

& Chief Operating Officer

,

l

Entergy Operations, Inc.

l

P.O. Box 31995

Jackson, Mississippi 39286-1995

Vice President

l.

Operations Support

l

Entergy Operations, Inc.

P.O. Box 31995

'

Jackson, Mississippi 39286

l

Manager, Washington Nuclear Operations

ABB Combustion Engineering Nuclear

l

Power

'

12300 Twinbrook Parkway, Suite 330

'

Rockville, Maryland 20852

County Judge of Pope Coun?y

Pope County Courthouse

Russellville, Arkansas 72801

.

l

Winston & Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

l

,

.

.

,

  • .

..

Entergy Operations, Inc.

-3-

David D. Snellings, Jr., Director

-

Division of Radiation Control and

Emergency Management

~ Arkansas Department of Health

4815 West Markham Street, Mail Slot 30

-

Little Rock, Arkansas 72205-3867

Manager

Rockville Nuclear Licensing

Framatome Technologies

1700 Rockville Pike, Suite 525

Rockville, Maryland 20852

!

,

. .

.

.

_

. . .

--

,

!-

l

l

..

l

l

Entergy Operations, Inc.

-4-

APR - g 1999

E-Mail report to T. Fiye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

DRS-PSB

f

DRS Director

MIS System

j

Branch Chief (DRP/C)

RIV File

Project Engineer (DRP/C)

Branch Chief (DRP/TSS)

,

l

l

14000G

DOCUMENT NAME: R:\\_ANO\\AN903RP.KMK

To receive copy of documert, indicate in box: "C" if,opy without enclosures *E" = Copy with enclosures "N" = No copy

RIV: SRI

l

SPE

d,f/ C:DRP/C l

l

l

KMKennedy + < -

DPLoveless

CSMarschall :,

3f-19

r,

3f

/99

3/

/99 ~ "

'9

~

-(

j

,

OFFICIAL RECORD COPY

'

L

!

,

.

j

r-

1

.

..

Entergy Operations, Inc.

-4-

pg _ g g

i

i

E-Mail report to T. Frye (TJF)

!

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

DRS-PSB

DRS Director

MIS System

Branch Chief (DRP/C)

RIV File

Project Engineer (DRP/C)

Branch Chief (DRP/TSS)

l

DOCUMENT NAME: R:\\_.ANO\\AN903RP.KMK

To receive copy of document, Indicete in box: "C"/)d,opy without enclosures "E" = Copy wi*h enclosures "N" = No copy

_

RIV: SRI

SPE

(MC:DRP/C

KMKennedv@/A

DPLovelesd

CSMarschall Oh

il

/GG b1T4bn

af

/99

N'/hh1

y/(f/19

lj q

OFFICIAL RECORD COPY

,

a