T
.
" "'4<,k
UNITED STATES
' ..
.l'
NUCLEAR REGULATORY COMMISSION
a
!
E
,a
REGloN IV
,
611 RYAN PLAZA DRIVE, sulTE 400
,
,,,g'
ARLINGTON, TEXAS 76011-8064
1
i
APR-91999
C. Randy Hutchinson, Vice President
Operations
Arkansas Nuclear One
Entergy Operations, Inc.
1448 S.R. 333
Russellville, Arkansas 72801-0967
SUBJECT: NRC SPECIAL INSPECTION REPORT 50-313/99-03; 50-368/99-03
Dear Mr. Hutchinson:
This refers to the inspection conducted on February 2-17,1999, at the Arkansas Nuclear One,
Units 1 and 2, reactor facility. The purpose of the inspection was to follow up on the draining of
the Unit 2 reactor coolant system and unplanned entry into reduced inventory conditions on
February 2,1999. The enclosed report presents the results of this inspection.
The results of this inspection indicata that your procedures and training wer' not adequate to
safely lower the level in the Unit 2 refueling canal to the top of the reactor vessel. A procedure
i
l
error, inadequate procedural controls, operator error, and inadequate training reflected a lack of
!
recognition of the potential hazards associated with lowering the water level in the refueling
!
canal As a result, water level was lowered in the reactor vessel at an unintentionally high rate.
Rapid operator action was required to ensure that the water level in the reactor coolant system
remained sufficient for the proper operation of the shutdown cooling system.
Based on the re.,ults of this inspection, the NRC has determined that three violations of NRC
requirements occurred. These violations are being treated as noncited violations (NCVs),
consistent with Appendix C of the Enforcement Policy. These NCVs are described in the
subject inspection report. If you contest the violation or severity level of these NCVs, you
should provide a response within 30 days of the date of this inspection report, with the basis for
your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington, DC 20555-0001, with copies to the Regional Administrator, Region IV, and the
Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,
DC 20555-0001.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed ir, the NRC Public Document Room.
!
9904140286 990409
ADOCK 05000313
G
l
l
l
L.
.
1
=.
i
..
Entergy Operations, Inc.
-2-
i
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
. . .
U
Charles S. Marschall, Chief
Project Branch C
Division of Reactor Projects
Docket Nos.: 50-313
50-368
l
License Nos.: DPR-51
NPF-6
1
!
Enclosure:
i-
NRC Inspection Report No.
50-313/99-03;50-368/99-03
l
cc w/ enclosure:
Executive Vice President
& Chief Operating Officer
,
l
Entergy Operations, Inc.
l
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President
l.
Operations Support
l
Entergy Operations, Inc.
P.O. Box 31995
'
Jackson, Mississippi 39286
l
Manager, Washington Nuclear Operations
ABB Combustion Engineering Nuclear
l
Power
'
12300 Twinbrook Parkway, Suite 330
'
Rockville, Maryland 20852
County Judge of Pope Coun?y
Pope County Courthouse
Russellville, Arkansas 72801
.
l
Winston & Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
l
,
.
.
,
- .
..
Entergy Operations, Inc.
-3-
David D. Snellings, Jr., Director
-
Division of Radiation Control and
Emergency Management
~ Arkansas Department of Health
4815 West Markham Street, Mail Slot 30
-
Little Rock, Arkansas 72205-3867
Manager
Rockville Nuclear Licensing
Framatome Technologies
1700 Rockville Pike, Suite 525
Rockville, Maryland 20852
!
,
. .
.
.
_
. . .
--
,
!-
l
l
..
l
l
Entergy Operations, Inc.
-4-
APR - g 1999
E-Mail report to T. Fiye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
f
DRS Director
MIS System
j
Branch Chief (DRP/C)
RIV File
Project Engineer (DRP/C)
Branch Chief (DRP/TSS)
,
l
l
14000G
DOCUMENT NAME: R:\\_ANO\\AN903RP.KMK
To receive copy of documert, indicate in box: "C" if,opy without enclosures *E" = Copy with enclosures "N" = No copy
RIV: SRI
l
d,f/ C:DRP/C l
l
l
KMKennedy + < -
DPLoveless
CSMarschall :,
r,
3f
/99
3/
/99 ~ "
'9
~
-(
j
,
OFFICIAL RECORD COPY
'
L
!
,
.
j
r-
1
.
..
Entergy Operations, Inc.
-4-
pg _ g g
i
i
E-Mail report to T. Frye (TJF)
!
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
DRS Director
MIS System
Branch Chief (DRP/C)
RIV File
Project Engineer (DRP/C)
Branch Chief (DRP/TSS)
l
DOCUMENT NAME: R:\\_.ANO\\AN903RP.KMK
To receive copy of document, Indicete in box: "C"/)d,opy without enclosures "E" = Copy wi*h enclosures "N" = No copy
_
RIV: SRI
(MC:DRP/C
KMKennedv@/A
DPLovelesd
CSMarschall Oh
il
/GG b1T4bn
af
/99
N'/hh1
y/(f/19
lj q
OFFICIAL RECORD COPY
,
a