IR 05000313/2022001
ML22122A290 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 05/10/2022 |
From: | John Dixon NRC/RGN-IV/DORS |
To: | Sullivan J Entergy Operations |
References | |
IR 2022001 | |
Download: ML22122A290 (17) | |
Text
May 10, 2022
SUBJECT:
ARKANSAS NUCLEAR ONE - INTEGRATED INSPECTION REPORT 05000313/2022001 AND 05000368/2022001
Dear Mr. Sullivan:
On March 31, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Arkansas Nuclear One. On April 14, 2022, the NRC inspectors discussed the results of this inspection with Mr. G. Flynn, Director, Engineering, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Signed by Dixon, John on 05/10/22 John L. Dixon, Jr., Chief Projects Branch D Division of Operating Reactor Safety Docket Nos. 05000313 and 05000368 License Nos. DPR-51 and NPF-6 Enclosure:
Integrated Inspection Report
ML22122A290 X SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword By: AAS X Yes No X Non-Sensitive X Publicly Available NRC-002 OFFICE SRI:DORS/D RI:DORS/D BC:DORS/EB1 BC:DORS/EB2 BC/DORS NAME RBywater NBrown VGaddy NTaylor HGepford SIGNATURE RLB NLB VGG NHT HJG DATE 5/3/2022 5/3/2022 5/3/2022 5/3/2022 5/3/2022 OFFICE BC:DRSS TL:DORS BC:DRSS/RxIB SPE:DORS/D BC:DORS/D NAME MHaire AAgrawal GWarnick ASanchez JDixon SIGNATURE MSH ARP GGW AAS JLD DATE 05/03/2022 5/3/2022 5/3/2022 5/3/2022 5/10/2022
U.S. NUCLEAR REGULATORY COMMISSION
Inspection Report
Docket Numbers: 05000313 and 05000368 License Numbers: DPR-51 and NPF-6 Report Numbers: 05000313/2022001 and 05000368/2022001 Enterprise Identifier: I-2022-001-0009 Licensee: Entergy Operations, Inc.
Facility: Arkansas Nuclear One Location: Russellville, AR Inspection Dates: January 1, 2022, to March 31, 2022 Inspectors: N. Brown, Resident Inspector R. Bywater, Senior Resident Inspector T. DeBey, Resident Inspector S. Hedger, Senior Emergency Preparedness Inspector Approved By: John L. Dixon, Jr., Chief Projects Branch D Division of Operating Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Arkansas Nuclear One, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 operated at or near full power for the entire inspection period.
Unit 2 operated at or near full power for the entire inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal cold temperatures for the following systems:
Unit 1 service water intake structure, including fire protection pumps on February 2, 2022 Unit 2 service water intake structure on February 2, 2022 Unit 1 upper south electrical penetration room on February 2, 2022 Unit 1 heat trace panels on February 2, 2022 Unit 2 heat trace panels on February 2, 2022
Impending Severe Weather Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from a tornado warning and a severe thunderstorm warning on March 30, 2022.
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (2 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 2 emergency diesel generator A during emergency diesel generator B testing on February 12, 2022
- (2) Unit 1 service water pumps (P-4A, P-4B, and P-4C) and intake structure sluice gate alignment after pump vent line repair on March 11, 2022
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Unit 1 control room, Fire Area G, Fire Zone 129-F, on January 31, 2022
- (2) Unit 1 lower north electrical penetration room, Fire Area I-3, Fire Zone 112-I, on February 8, 2022
- (3) Unit 1 emergency diesel generator corridor 98, Fire Area I, Fire Zone 98-J, on February 8, 2022
- (4) Unit 2 A3 4160 VAC vital switchgear room, Fire Area II, Fire Zone 2101-AA, on February 12, 2022
- (5) Unit 2 auxiliary building 354-foot level, Fire Area HH, Fire Zone 2038, on
March 23, 2022 Fire Brigade Drill Performance Sample (IP Section 03.02) (2 Samples)
- (1) The inspectors evaluated the onsite fire brigade training and performance during the Unit 2 A3 4160 VAC vital switchgear room announced fire drill, Fire Area II, Fire Zone 2101-AA, on February 15, 2022.
- (2) The inspectors evaluated the onsite fire brigade training and performance during a fire brigade live fire training on February 22, 2022.
71111.06 - Flood Protection Measures
Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)
The inspectors evaluated internal flooding mitigation protections in the:
- (1) Unit 2 auxiliary building flooding features on March 23, 2022
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)
(2 Samples)
- (1) The inspectors observed and evaluated licensed operator performance in the Unit 1 control room during power maneuvers and turbine throttle valve and governor valve testing on March 23, 2022.
- (2) The inspectors observed and evaluated licensed operator performance in the Unit 2 control room during plant protection system Channel D calibration on March 24, 2022.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (2 Samples)
- (1) The inspectors observed and evaluated a Unit 2 simulator requalification examination on February 8, 2022.
- (2) The inspectors observed and evaluated Unit 1 simulator requalification training for loss of condenser vacuum, loss of feedwater, and cooling with high-pressure injection on February 10, 2022.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (2 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
- (1) Unit 1 personnel airlock local leak rate test on January 20, 2022
- (2) Lake Dardanelle level indicator and alarm switch on March 24, 2022
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
- (1) Unit 1 elevated risk due to planned major switchyard work coincident with fire protection pump P-6B outage and Unit 1 emergency diesel generator K-4B maintenance on January 25, 2022
- (2) Unit 2 elevated risk during planned battery charger 2D-31B maintenance on March 1, 2022
- (3) Units 1 and 2 elevated risk and changes to the planned maintenance schedule during severe weather alert on March 22, 2022
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) Unit 2 pressurizer proportional heaters capacity after refueling outage maintenance on January 24, 2022
- (2) Unit 1 emergency diesel generator B operability after extended engine start time on January 24, 2022
- (3) Unit 2 low-pressure safety injection header B gas accumulation operability determination on February 8, 2022
- (4) Common feedwater system functionality with high condensate storage tank water temperature on February 10, 2022
- (5) Unit 1 Loop 1 service water pipe leak initial operability determination on March 31, 2022
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)
(1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
- (1) Temporary fire pump installation, which had been implemented to provide additional cooling water for planned Unit 2 refueling outage maintenance activities, and its removal on January 27, 2022
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:
- (1) Diesel-driven fire pump P-6B following maintenance on January 1, 2022
- (2) Flex diesel generator K-12 following maintenance on January 12, 2022
- (3) Unit 1 penetration room ventilation system fan VEF-38A, following planned maintenance, on March 29, 2022
- (4) Alternate ac diesel generator starting air compressor 2C-7, following repairs, on March 30, 2022
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:
Surveillance Tests (other) (IP Section 03.01) (5 Samples)
- (1) Unit 2 emergency diesel generator B test on February 12, 2022
- (2) Unit 1 turbine throttle valve and governor valve stroke testing on March 23, 2022
- (3) Unit 1 transformer yard manhole MH-2 cable inspection on March 24, 2022
- (4) Unit 2 plant protection system Channel D calibration on March 24, 2022
- (5) Unit 1 pressurizer heater checks on March 30, 2022
Inservice Testing (IP Section 03.01) (3 Samples)
- (1) Unit 1 reactor building isolation train A quarterly valve stroke tests on February 14, 2022
- (2) Unit 2 high-pressure safety injection train A quarterly valve stroke tests on February 22, 2022
- (3) Unit 1 turbine-driven emergency feedwater steam valve stroke tests, for steam admission valves CV-2663 and 2667, on March 25, 2022
71114.04 - Emergency Action Level and Emergency Plan Changes
Inspection Review (IP Section 02.01-02.03) (1 Sample)
- (1) The licensee submitted a summary of emergency plan changes (Revision 47) to the NRC on January 11, 2022. The inspectors conducted a review of the changes from January 18 to January 25, 2022. This evaluation does not constitute NRC approval.
71114.06 - Drill Evaluation
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)
(1 Sample)
- (1) Blue team emergency preparedness drill on March 8,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01) ===
- (1) Unit 1 (January 1, 2021, through December 31, 2021)
- (2) Unit 2 (January 1, 2021, through December 31, 2021)
IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02)
(2 Samples)
- (1) Unit 1 (January 1, 2021, through December 31, 2021)
- (2) Unit 2 (January 1, 2021, through December 31, 2021)
IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (2 Samples)
- (1) Unit 1 (January 1, 2021, through December 31, 2021)
- (2) Unit 2 (January 1, 2021, through December 31, 2021)
71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issue:
- (1) Unit 2 Refueling Outage 28 working hour limits on March 10,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On January 25, 2022, the inspectors presented the in-office emergency plan revision review inspection results to Mr. J. Toben, Manager, Emergency Preparedness, and other members of the licensee staff.
On April 14, 2022, the inspectors presented the integrated inspection results to Mr. G. Flynn, Director, Engineering, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.01 Corrective Action CR-ANO- 1-2016-05126, 1-2021-02806, 1-2021-02807, 1-2022-00159,
Documents 2-2016-03913, 2-2022-00066, C-2021-02884
71111.01 Miscellaneous SO-P-NOP-00- Conservative System Operations 6
449
EN-FAP-EP-010 Severe Weather Response 8
EN-WM-104 On Line Risk Assessment 23
OP-1104.039 Plant Heating and Cold Weather Operations 36
OP-1104.050 Turbine Building, Intake Structure and Miscellaneous 9
Ventilation
OP-2106.032 Unit Two Freeze Protection Guide 31
71111.01 Work Orders WO 332876, 467951
71111.04 Corrective Action CR-ANO- 1-2021-03107, 1-2021-03295, 1-2022-00220, 1-2022-00252,
Documents 1-2022-00327, 1-2022-00346, 1-2022-00380, 1-2022-00437,
1-2022-00438, 1-2022-00439
71111.04 Drawings M-209, Sheet 1 Service Water System/Intake Structure 115
M-2210, Sheet 1 Service Water System 93
M-2217, Sheet 1 Emergency Diesel Generator Fuel Oil System 64
M-2217, Sheet 2 Emergency Diesel Generator Starting Air System 34
M-2217, Sheet 3 Emergency Diesel Generator Auxiliary System 19
71111.04 Miscellaneous ULD-1-SYS-10 ANO Unit 1 Service Water System 17
ULD-2-SYS-01 ANO Unit 2 Emergency Diesel Generator System 10
OP-1104.029 Service Water and Auxiliary Cooling System 125
OP-2104.036 Emergency Diesel Generator Operations 102
OP-3305.01 Ops System Alignment Tests 3
71111.05 Calculations CALC-89-R- Penetration Seal Analysis for Penetration 0
2002-105
71111.05 Corrective Action CR-ANO- 1-2020-01475, 1-2021-02435, 1-2022-00063, 1-2022-00307,
Documents 2-2022-00547, C-2021-00936, C-2022-00438
71111.05 Drawings FP-103, Sheet 1 Fire Zones Intermediate Floor Plan, EL 368-0 and 372-0 32
FP-2103, Sheet 1 Intermediate Floor Plan El 368-0 to 372-0 38
FZ-1052 Fire Zone 129-F 3
Inspection Type Designation Description or Title Revision or
Procedure Date
FZ-2029, Sheet 1 North Switchgear Room 3
FZ-2038, Sheet 1 Piping Penetration Room, Access Area, Tank and Pump 3
Room, Sample Room, Stair No. 2001, Hot Machine Shop
FZ-98-I Fire Zone 98-1 3
71111.05 Miscellaneous Technical Basis Document for ANO-1 Fires in Areas 1
Affecting Safe Shutdown
ANO-Unit 1 Pre Fire Plan 3
PFP-U2 ANO Pre Fire Plan (Unit 2) 17
ULD-0-SYS-09 ANO Fire Protection System 7
71111.05 Procedures ASOTH-FP- Instructors Guide for Fire Brigade Drills 11
FBDRLS
EN-OP-115-17 Fire Brigade Organization and Responsibilities 0
EN-OP-125 Fire Brigade Drills 0
OP-1015.007 Fire Brigade Organization and Responsibilities 36
OP-1104.032 Fire Protection Systems 94
OP-1306.005 Unit 1 Fire Door Inspection Procedure 30
71111.06 Calculations CALC-15-E-0007- ANO 317 Elevation Ponding Level Due to Postulated Pipe 1
Crack
CALC-95-R- Basic Requirements for the Component Database on Station 17
24-01 Doors and Hatches
CALC-ANOC-CS- ANO Flood Protection Room Evaluations - Units 1 and 2 3
15-00012
ULD-0-TOP-17 ANO Flooding 1
OP-1402.243 Inspection of Miscellaneous Internal Flood and HELB 2
Protection Features
71111.11Q Corrective Action CR-ANO- 1-2021-00016, 2-2022-00258, 2-2022-00288, C-2021-
Documents 00866, C-2021-01497
71111.11Q Miscellaneous A1LP-RO-AVAC Loss of Condenser Vacuum 2
DG-TRNA-4.5- Simulator Training Aids 32
SIMTRNG
SES-2- Arkansas Nuclear One Unit 2 Crew Performance Evaluation 0
ECPE2203 Scenario
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.11Q Procedures EN-OP-115 Conduct of Operations 31
EN-OP-115-02 Control Room Conduct and Access Control 6
EN-TQ-210 Conduct of Simulator Training 16
OP-1102.004 Power Operation 78
OP-1102.016 Power Reduction and Plant Shutdown 39
OP-1106.009 Supplement 2 Throttle Valve Testing 61
OP-1106.009 Supplement 3 Governor Valve Testing 61
OP-1202.002 Loss of Subcooling Margin 12
OP-1202.004 Overheating 13
OP-1202.005 Inadequate Cooling 12
OP-1202.011 HPI Cooldown 9
OP-2102.004 Power Operation 73
OP-2103.002 Filling and Venting the RCS 71
OP-2103.011 Draining the Reactor Coolant System 63
OP-2104.002 Chemical and Volume Control 94
OP-2202.010 Standard Attachments 31
71111.12 Corrective Action CR-ANO- 1-2018-05389, 1-2019-00031, 1-2019-00201, 1-2019-00436,
Documents 1-2019-00797, 1-2019-01047, 1-2019-02356, 1-2020-00832,
1-2020-01318, 1-2021-00442, 1-2021-03190, 1-2022-00068,
1-2022-00216, C-2022-00181
71111.12 Miscellaneous CEP-APJ-001 Primary Containment Leakage Rate Testing (10CFR50 6
Appendix J) Program Plan
NEI 99-01 Development of Emergency Action Levels for Non-Passive 6
Reactors
SEP-APJ-002 Arkansas Nuclear One Primary Containment Leakage Rate 9
Testing (Appendix J) Program Section
ULD-0-TOP-14 Containment Isolation and Containment Leak Rate Testing 5
71111.12 Procedures EN-DC-334 Primary Containment Leakage Rate Testing (Appendix J) 4
OP-1203.012M Annunciator K15 Corrective Action 44
OP-1203.025 Natural Emergencies 77
OP-1305.037 Unit 1 Reactor Building Access and Ventilation Leak Rate 13
Testing
71111.12 Work Orders WO 52469385, 52682709, 52869983
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.13 Corrective Action CR-ANO- 2-2021-01537, 2-2022-00428, C-2021-01100, C-2021-
Documents 02220, C-2022-00031, C-2022-00751, C-2022-00764
71111.13 Miscellaneous Unit 1 and Unit 2 Narrative Logs 03/21/2022
Unit 1 and Unit 2 Narrative Logs 03/22/2022
SO-P-NOP-00- MISO Conservative System Operations 6
449
71111.13 Procedures COPD-13 Operations Maintenance Interface Standards and 59, 63
Expectations
COPD-24 Risk Assessment Guidelines 72
EN-FAP-EP-010 Severe Weather Response 8
EN-OP-119 Protected Equipment Postings 15
EN-WM-104 On Line Risk Assessment 22, 23
71111.15 Calculations CALC-86-E-0036- ANO Unit 2 Pressurizer Heater Electrical Evaluation 12/14/2006
201
CALC-12-E-0012- Determination of Allowable Gas Volumes in GL 2008-01 0
Systems on Both Units
71111.15 Corrective Action CR-ANO- 1-2020-01681, 1-2020-01682, 1-2021-01895, 1-2021-03179,
Documents 1-2021-03184, 1-2021-03218, 1-2022-00097, 2-2004-00472,
2-2004-02116, 2-2020-02099, 2-2020-02108, 2-2020-02121,
2-2020-02321, 2-2020-02493, 2-2020-02594, 2-2021-03420,
2-2021-03440, 2-2021-03655, 2-2022-00236, C-2021-
2976, C-2021-02985, C-2022-00237, C-2022-00391, C-
22-00841
71111.15 Drawings 13-SW-134, Large Pipe Isometric Service Water Essential 17
Sheet 1
M-209, Sheet 1 Circ. Water, Service Water & Fire Water Intake Structure 115
Equipment
M-2232, Sheet 1 Safety Injection System 123
71111.15 Miscellaneous STM 1-26 Common Feedwater System 3
ULD-1-SYS-01 ANO Unit 1 Emergency Diesel Generator (EDG) System 8
71111.15 Procedures EN-DC-219 Gas Accumulation Management 6
Inspection Type Designation Description or Title Revision or
Procedure Date
EN-OP-104 Operability Determination Process 17
EN-OP-201-01 Arkansas Nuclear One Flex Program Document 4
OP-2307.009 Pressurizer Proportional Heater Checkout 13
OP-2307.039 Pressurizer Heater Removal and Replacement 5
71111.15 Work Orders WO 543070, 570993, 52929081, 52961491, 52985590,
54883716
71111.18 Corrective Action CR-ANO- 1-2020-00134, 1-2022-00336, 2-2021-00700, 2-2021-02919,
Documents C-2021-02276,
71111.18 Engineering ER-ANO-1999- Temporary Alteration for Temp Fire Pump Usage during Unit 04/03/2002
Changes 1909-008 Outages
71111.18 Procedures EN-DC-136 Temporary Modifications 21
71111.18 Work Orders WO 106317, 566604, 569331, 52885431
71111.19 Calculations CALC-88-E-0029- Emergency Penetration Room Ventilation System 10/13/2020
71111.19 Corrective Action CR-ANO- C-2021-02976, C-2021-02985, C-2022-00246, C-2022-
Documents 00247, C-2022-00269, C-2022-00555, C-2022-00569,
71111.19 Procedures OP-1104.032 Fire Protection Systems 94
OP-2104.037 Alternate AC Diesel Generator Operations 0
71111.19 Work Orders WO 545697, 566604, 570993, 575233, 52929081, 52956781,
2960533,
71111.22 Corrective Action CR-ANO- 2-2020-00819, 2-2021-01691, 2-2022-00293, 2-2022-00294,
Documents 2-2022-00299, C-2021-02823
71111.22 Miscellaneous EN-HU-102 Human Performance Traps & Tools 18
EN-RE-302 PWR Reactivity Maneuver 5
ULD-2-SYS-01 ANO Unit 2 Emergency Diesel Generator System 10
71111.22 Procedures OP-1106.009 Turbine Startup (Warmup & Roll) 61
OP-1203.012H Annunciator K09 Corrective Action 54
OP-1203.015 Pressurizer Systems Failure 23
OP-1305.007 RB Isolation and Miscellaneous Valve Stroke Test 53
OP-1307.009 Unit 1 Emergency Powered Pressurizer Heater Checkout 16
OP-2104.036 Emergency Diesel Generator Operations 102
OP-2104.039 HPSI System Operations 92
OP-2304.092 Unit 2 Plant Protection System Channel D Cabinet 12
Inspection Type Designation Description or Title Revision or
Procedure Date
Calibration
71111.22 Work Orders WO 538600, 297597, 52938738, 52945445, 52959599,
2962209, 52963105, 52969754,
71114.04 Miscellaneous 10CFR50.54(q)(3) Screening, Procedure/Document 11/09/2021
Number: EPLAN, Revision: 047, Title: ANO Emergency Plan
10CFR50.54(q)(3) Evaluation, Procedure/Document 11/11/2021
Number: EPLAN, Revision: 047, Title: ANO Emergency Plan
0CAN012202 Emergency Plan, Arkansas Nuclear One, Units 1 and 2; 01/11/2022
NRC Docket Nos. 50-313, 50-368, and 72-13; Renewed
Facility Operating License Nos. DPR-51 and NPF-6
71114.04 Procedures EN-EP-305 Emergency Planning 10CFR50.54(q) Review Program 8
71114.06 Miscellaneous Blue Team Drill Guide
EN-EP-609 Emergency Operations Facility (EOF) Operations 6
71151 Miscellaneous ANO-1 and ANO-2 NRC Performance Indicator Q2-2021
Technique/Data Sheets - Initiating Events
ANO-1 and ANO-2 NRC Performance Indicator Q3-2021
Technique/Data Sheets - Initiating Events
ANO-1 and ANO-2 NRC Performance Indicator Q4-2021
Technique/Data Sheets - Initiating Events
ANO-1 and ANO-2 NRC Performance Indicator Q1-2021
Technique/Data Sheets - Initiating Events
71151 Procedures EN-LI-114 Regulatory Performance Indicator Process 19
71152A Corrective Action CR-ANO- 1-1992-00070, 1-2000-00228, 1-2004-02409, 1-2009-00158,
Documents 2-2021-02116, C-2021-03092, C-2022-00538, 1-2022-0513
Miscellaneous 90-E-0038-04 Pressure Control Assessment During Loss of Offsite Power 04/29/1992
2-R-1006-01 Ambient Heat Loss Tests (Pre/Post 1R10) 10/28/1992
95-E-0001-02 ANO U1 Millstone Study - Connected Load, MCC Circuit 8
Voltage Drop and Load Center Accident Loading
NUREG-0578 NRR Lessons Learned Task Force Short-Term 07/1979
Recommendations
NUREG-0737 Clarification of TMI Action Plan Requirements 11/1980
SEP-PT-ANO- Arkansas Nuclear One ASME Section XI Inservice 5
001 Inspection Pressure Testing (PT) Program Section
EN-NS-102 Fitness for Duty Program 26, 27
Inspection Type Designation Description or Title Revision or
Procedure Date
EN-OM-123 Fatigue Management Program 18
OP-1307.009 Unit 1 Emergency Powered Pressurizer Heater Checkout 9
OP-2102.001 Plant Pre-Heatup an Pre-Critical Checklist 97
Work Orders WO 52933247
15