Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-related Logic Circuits, for Plant,Units 1 & 2
ML20206N416
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 05/11/1999
From: Nick Hilton
NRC (Affiliation Not Assigned)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
References
GL-96-01, GL-96-1, TAC-M94643, TAC-M94644, NUDOCS 9905170219
Download: ML20206N416 (3)


Text

as:

\

'k p UNITED STATES-

j. NUCLEAR REGULATORY COMMIS810N

. WASHINGTON, D.C. 300e54001 May 11, 1999 4**

Mr. C. Randy Hutchinson ,

Vice President, Operations ANO 1 Entergy Operations, Inc. j 1448 S. R. 333 RusselMlle, AR 72801

SUBJECT:

COMPLETION OF LICENSING ACTION FOR GENERIC LETTER 96-01,

" TESTING OF SAFETY-RELATED LOGIC CIRCUlTS," DATED JANUARY 10,1996; ARKANSAS NUCLEAR ONE, UNIT NOS.1 AND 2 ;i (TAC NOS. M94643 AND M94644) j

' Dear Mr. Hutchinson-On January 10,1996, the Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 96-01, " Testing of Safety-Related Logic Circuits," to all holders of operating licenses or construction permits. The NRC issued GL 96-01 for three principal reasons:

1. Notify addresses about problems with testing of safety-related logic circuits- I i
2. Request that all addressees implement the actions described within the generic letter; l and

{

3. Require that all addressees submit to the NRC a written response regarding implementation of the requested actions. f j

/g i in GL 96-01, the NRC staff specifically requested that licensees take the following actions:

1. Compare electrical schematics and logic diagrams for the reactor protection system,  !

emergency diesel generator load shedding and sequencing, and actuation logic for the fi engineered safety feature systems against plant surveillance test procedures to ensure i that all portions of the logic circuitry, including the parallel logic, interlocks, bypasses, ,

and inhibit circuits, are adequately covered in the surveillance procedures to fulfill the ,

technical specification requirements. This review should also include relay contacts, ]

control switches, and other relevant electrical components within these systems, utilized I in the logic circuits performing a safety function; and I

2. Modify the surveillance procedures as necessary for complete testing to comply with the i technical specifications. Additionally, the licensee may request an amendment to the technical specifications if relief from certain testing requirements can be justified.

9905170219 990511 PDR ADOCK 05000313 P PDR

Mr. C. Randy Hutchinson May 11, 1999 Furthermore, the NRC staff required that addressees prepare and submit the following:

1. A written response indicating whether or not the licensee would implement the actions requested above or propose an alternative action;
2. A schedule for completing the requested actions or proposed alternative; and
3. A response confirming completion of the requested actions.

In response to GL 96-01, you provided letters dated April 19,1996 (OCAN049603), July 9,1997 (2CAN079713), June 10,1998 (1CAN069805), and April 27,1999 (1CAN049903) for Arkansas Nuclear One, Unit Nos.1 and 2. These submittals provided both the information requested and the responses required by GL 96-01; therefore, TAC Nos. M94643 and M94644 are closed.

If you have any questions regarding this matter, please contact me at (301) 415-1314.

Sincerely, fg

. _/ // 3 Nicholas D. Hilton, Project Manager, Section 1 Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-313 and 50-368 cc: See next page DISTRIBUTION:

Docket File PUBLIC PD4-1 r/f NHilton LBerry OGC ACRS KBrockman, RIV HGarg, NRR WLong, NRR JZwolinski/SBlack RGramm Document Name: G:\ANO1&2\LTR94643.WPD OFC PDIV-1/PM PDIV-1/PM EElB PDIV-1/tA PDIV-1/SC NAME NHiltod CNolanh HGarg /3/ 5 LBerry h RGram DATE [/7 /99 [/ 7 /99 f / !o /99 h/b99 f/ I /99 COPY VES/NO YES/NO YES/NO YESfNO hO OFnCIAL RECORR'OPY

l .

Mr. C. Randy Hutchinson Entergy Operations, Inc. Arkansas Nuclear One, Units 1 & 2 cc:

Executive Vice President Vice President, Operations Support

& Chief Operating Officer Entergy Operations, Inc.

Entergy Operations, Inc. P. O. Box 31995 P. O. Box 31995 Jackson, MS 39286-1995 Jackson, MS 39286-1995 Wise, Carter, Child & Caraway Director, Division of Radiation P. O. Box 651 Control and Emergency Management Jackson, MS 39205 Arkansas Department of Health 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Manager, Rockville Nuclear Licensing Framatone Technologies 1700 Rockville Pike, Suite 525 Rockville, MD 20852 Senior Resident inspector U.S. Nuclear Regulatory Commission P. O. Box 310 London, AR 72847 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 County Judge of Pope County Pope County Courthouse Russellville, AR 72801 i

, . - _ _ . . , - - . . _ . _ . . . _ . . _ . . . . . ._.