Forwards Insp Repts 50-313/99-06 & 50-368/99-06 on 990524-28.Violation Identified & Being Treated as Noncited Violation
ML20195F163
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/08/1999
From: Good G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
Shared Package
ML20195F170 List:
References
50-313-99-06, 50-313-99-6, 50-368-99-06, 50-368-99-6, NUDOCS 9906140212
Download: ML20195F163 (4)


See also: IR 05000313/1999006

Text

i

.

JP "%c ,

UNITED STATES

3

t

NUCLEAR REGULATORY COMMISSION

i

7

p,

l

,

Ta

1

y

REGloN IV

T,

l

611 RYAN PLAZA drive, sulTE 400

ARLINGTON, TEXAS 76011-8064

)

,,,,,

. June 8, 1999

C. Randy Hutchinson, Vice President

Operations

i

Arkansas Nuclear One

Entergy Operations, Inc.

1448 S.R. 333

Russellville, Arkansas 72801-0967

,

l

\\

t

SUBJECT: NRC INSPECTION REPORT NO. 50-313/99-06; 50-368/99-06

l

l

Dear Mr. Hutchinson:

This refers to the inspection conducted on May 24-28,1999, at the Arkansas Nuclear One,

l'aits 1 and 2 facilities. The inspection focused on the radiological environmental monitoring

program activities. The enclosed report presents the results of this inspection.

Overall, the radiological environmental monitoring program was effectively implemented.

However, based on the results of this inspection, the NRC has determined that one Severity

LevelIV violation of NRC requirements occurred. The violation is being treated as a noncited

,

violation (NCV) consistent with Appendix C of the Enforcement Policy. The NCV is described in

l

the subject inspection report. If you contest the violation or severity level of the NCV, you

should provide a response within 30 days of the date of this inspection report, with the basis for

your denial to the Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington DC 20555-0001, with copies to the Regional Administrator, U.S. Nuclear

Regulatory Commission, Region IV,611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011;

the Director, Office of Enforcement, United States Nuclear Regulatory Commission,

Washington, DC 20555-0001; and the NRC Resident inspector at the Arkansas Nuclear One,

i

Units 1 and 2 facilities.

'

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

l

enclosure (s), and your response, if requested, will be placed in the NRC Public Document

Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them

l

with you.

F'

I

Gail M. Good, Chief

l

Plant Support Branch

l.

Division of Reactor Safety

l

9906140212 990608

PDR

ADOCK 05000313

G

PDR

e

.

Entergy Operations, Inc.

-2-

Docket Nos.: 50-313

50-368

License Nos.: DPR-51

NPF-6

Enclosures:

NRC Inspection Report No.

50-313/99-06;50-368/99-06

cc w/ enclosures:

Executive Vice President

& Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286

Manager, Washington Nuclear Operations

ABB Combustion Engineering Nuclear

Power

12300 Twinbrook Parkway, Suite 330

Rockville, Maryland 20852

County Judge of Pope County

Pope County Courthouse

Russellville, Arkansas 72801

Winston & Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

David D. Snellings, Jr., Director

Division of Radiation Control and

Emergency Management

Arkansas Department of Health

4815 West Markham Street, Mail Slot 30

Little Rock, Arkansas 72205-3867

Manager

Rockville Nuclear Licensing

Framatome Technologies

1700 Rockville Pike, Suite 525

Rockville, Maryland 20852

.

.

.

Entergy Operations, Inc.

-3-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

ANO Resident inspector

DRP Director

DRS-PSB

DRS Director

MIS System

Branch Chief (DRP/D)

RIV File

Project Engineer (DRP/D)

DRS Action item (Goines) (99-G-

Branch Chief (DRP/TSS)

i

DOCUMENTJAME: R:\\_ANO\\AN906RP.MPS

To receive cop 5Fof document, Indicate in box: "C" = Copy without enclosures *E" = C@with enclosures *N" = No copy

RIV:PSk- L

PSB\\SRS

a e

C:DRS\\PSB

C:DF%

,

Peer ReviW MShannon/ mfd' GGood (4ty(

PHarreN d)"

06/3/99

f'

06/3/99

06fy99 '

06 @T

/

OFFICIAL RECORD COPY

l

!

$

Entergy Operations, Inc.

-3-

E Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E Mail report to NRR Event Tracking System (IPAS)

E Mail report to Document Control Desk (DOCDESK)

bec to DCD (I

1)

bec distrib. by RIV:

Regional Administrator

ANO Resident inspector

DRP Director

DRS-PSB

DRS Director

MIS System

l

Brailch Chief (DRP/D)

RIV File

Project Engineer (DRP/D)

DRS Action item (Goines)(99-G-

Branch Chief (DRP/TSS)

I

DOCUMENTJAME: R:\\_ANO\\AN'506RP.MPS

To receive cogr1Fof document. Indicate in box: "C" = Copy without enclosures *E* = Cdwith enclosures *N* = No copy

RIV:PSk

L

,PSB\\SRS a r

C:DRS\\PSB

C:D@

l

,

Peer ReviW MShannon/MN' GGood (Ati(f

PHarke) Af'

06/3/99

r'

060/99

06P/99 '

06/D997

OFFICIAL RECORD COPY

/

.mL.,

s

. . . .

,

1

l.