ML20206S421

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-313/99-04 & 50-368/99-04 on 990228- 0410.Four Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy
ML20206S421
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 05/10/1999
From: Harrell P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
Shared Package
ML20206S425 List:
References
50-313-99-04, 50-313-99-4, 50-368-99-04, 50-368-99-4, NUDOCS 9905210130
Download: ML20206S421 (4)


See also: IR 05000313/1999004

Text

U

.

O"'%<g UNITED STATES

, ,:' t NUCLEAR REGULATORY COMMISSION

8  ?>

g y REGloN IV

?, 8 611 RYAN PLAZA DRIVE, sUlTE 400

y,,, ARLINGTON, TEXAS 76011-8064

MAY I 01999

C. Randy Hutchinson, Vice President

Operations

Arkansas Nuclear One

Entergy Operations, Inc.

1448 S.R. 333

Russellville, Arkansas 72801-0967

SUBJECT: NRC INSPECTION REPORT 50-313/99-04; 50-368/99-04 ,

Dear Mr. Hutchinson:

This refers to the inspection conducted on February 28 through April 10,1999, at the Arkansas I

Nuclear One, Units 1 and 2, reactor facility. The enclosed report presents the results of this

inspection.

During the 6-week period covered by this inspection, your conduct of activities at the Arkansas

Nuclear One facility was generally characterized by safety-conscious operations, sound

engineering and maintenance practices, and appropriate radiological controls.

Based on the results of this inspection, the NRC has determined that four violations of NRC

requirements occurred. These violations are being treated as noncited violations (NCVs),

consistent with Appendix C of the Enforcement Policy. These NCVs are described in the

subject inspection report. If you contest the violation or severity level of these NCVs, you

should provide a response within 30 days of the date of this inspection report, with the basis for

your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington, DC 20555-0001, with copies to the Regional Administrator, Region IV, and the

Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,

DC 20555-0001.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

w , er 'W

  • P. arrell, e

P oject Branch D i

Division of Reactor Projects

'

9905210130 990510

PDR ADOCK 05000313

0 PM ,

_ _ __ ._

.

.

Entergy Operations, Inc. -2-

Docket Nos.: 50-313

50-368

License Nos.: DPR-51

NPF-6

Enclosure:

NRC Inspection Report

50-313/99-04;50-368/99-04

cc w/ enclosure:

Executive Vice President

& Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286

Manager, Washington Nuclear Operations

ABB Combustion Engineering Nuclear

Power

12300 Twinbrook Parkway, Suite 330

Rockville, Maryland 20852

County Judge of Pope County

Pope County Courthouse

Russellville, Arkansas 72801

Winston & Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

David D. Snellings, Jr., Director

Division of Radiation Control and

Emergency Management

Arkansas Department of Health

4815 West Markham Street, Mail Slot 30

Little Rock, Arkansas 72205-3867

Manager

Rockville Nuclear Licensing

Framatome Technologies

1700 Rockville Pike, Suite 525

Rockville, Maryland 20852

o ,

,

.

..

MAY I o 1999

Entergy Operations, Inc. -3-

.

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

I

bec to DCD (IE01)

i

bec distrib. by RIV:

Regional Administrator {

Resident inspector  !

DRP Director DRS-PSB I

DRS Director MIS System

Branch Chief (DRP/D) RIV File ~

Project Engineer (DRP/D) Branch Chief (DRP/TSS)

..

.

DOCUMENT NAME: R:\_ANO\AN904RP.KDW

To receive copy of document, indicate in box: 'C" = Co W without enclosures "E" = Co)y with enclosures "N" No copy

RIV:RI:DRP/B Rl:DRS/EMB RI:DRS/EMB Al:DRP/D

JDHanna At-

Le PAGoldbertd_d (y(An RLNease A R KDW3averdit.& 4

4/21/99 5/g /99 5/f/99 5/)T/b9

SRl:DRP/D C:DRP/D

KMKennedy (AC PHHarrell Mfer 1

5/ # /99 5/ so /99 ' h

OF ElCIAL RECORD COPY

<

.

4AY I t ;9

Entergy Operations, Inc. -3

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS) ]

E-Mail report to Document Control Desk (DOCDESK) l

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT) ,

bec to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator Resident inspector

DRP Director DRS-PSB 1

'

DRS Director MIS System

Branch Chief (DRP/D) RIV File

Project Engineer (DRP/D) Branch Chief (DRP/TSS) )

\

i?! 00:18 \

l

DOCUMENT NAME: R:\._ANO\AN904RP.KDW

To receive copy of document, indicate in box: "C" = Co)y ethout enclosures "E" = Co ay uth enclosures "N" = No copy

RIV:RI:DRP/B l RI: Din'/EMB RI:DRS/EMB RI:DRP/D

JDHanna L-hL,e PAGoldber6Lt y(An RLNease & KDW3averbsk,6 4

'

4/21/99 5/.( /99 5/.f /99 5/Jf%9

SRI:DRP/D C:DRP/D l

KMKennedy (.AL PHHarrell t'Atk

5/M /99 5/ lo /99 h

OFFICIAL RECORD COPY