ML20206S421
| ML20206S421 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 05/10/1999 |
| From: | Harrell P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hutchinson C ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20206S425 | List: |
| References | |
| 50-313-99-04, 50-313-99-4, 50-368-99-04, 50-368-99-4, NUDOCS 9905210130 | |
| Download: ML20206S421 (4) | |
See also: IR 05000313/1999004
Text
U
.
O"'%<g
UNITED STATES
,:'
t
NUCLEAR REGULATORY COMMISSION
,
8
?>
g
y
REGloN IV
?,
8
611 RYAN PLAZA DRIVE, sUlTE 400
ARLINGTON, TEXAS 76011-8064
y,,,
MAY I 01999
C. Randy Hutchinson, Vice President
Operations
Arkansas Nuclear One
Entergy Operations, Inc.
1448 S.R. 333
Russellville, Arkansas 72801-0967
SUBJECT: NRC INSPECTION REPORT 50-313/99-04; 50-368/99-04
,
Dear Mr. Hutchinson:
This refers to the inspection conducted on February 28 through April 10,1999, at the Arkansas
Nuclear One, Units 1 and 2, reactor facility. The enclosed report presents the results of this
inspection.
During the 6-week period covered by this inspection, your conduct of activities at the Arkansas
Nuclear One facility was generally characterized by safety-conscious operations, sound
engineering and maintenance practices, and appropriate radiological controls.
Based on the results of this inspection, the NRC has determined that four violations of NRC
requirements occurred. These violations are being treated as noncited violations (NCVs),
consistent with Appendix C of the Enforcement Policy. These NCVs are described in the
subject inspection report. If you contest the violation or severity level of these NCVs, you
should provide a response within 30 days of the date of this inspection report, with the basis for
your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington, DC 20555-0001, with copies to the Regional Administrator, Region IV, and the
Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,
DC 20555-0001.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
'W
er
w
,
- P.
arrell,
e
P oject Branch D
i
Division of Reactor Projects
'
9905210130 990510
ADOCK 05000313
0
,
_ _ __
._
.
.
Entergy Operations, Inc.
-2-
Docket Nos.: 50-313
50-368
License Nos.: DPR-51
NPF-6
Enclosure:
NRC Inspection Report
50-313/99-04;50-368/99-04
cc w/ enclosure:
Executive Vice President
& Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286
Manager, Washington Nuclear Operations
ABB Combustion Engineering Nuclear
Power
12300 Twinbrook Parkway, Suite 330
Rockville, Maryland 20852
County Judge of Pope County
Pope County Courthouse
Russellville, Arkansas 72801
Winston & Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
David D. Snellings, Jr., Director
Division of Radiation Control and
Emergency Management
4815 West Markham Street, Mail Slot 30
Little Rock, Arkansas 72205-3867
Manager
Rockville Nuclear Licensing
Framatome Technologies
1700 Rockville Pike, Suite 525
Rockville, Maryland 20852
o
,
.
MAY I o 1999
..
Entergy Operations, Inc.
-3-
.
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
I
bec to DCD (IE01)
i
bec distrib. by RIV:
{
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
I
DRS Director
MIS System
Branch Chief (DRP/D)
RIV File ~
Project Engineer (DRP/D)
Branch Chief (DRP/TSS)
..
.
DOCUMENT NAME: R:\\_ANO\\AN904RP.KDW
To receive copy of document, indicate in box: 'C" = Co W without enclosures "E" = Co)y with enclosures "N"
No copy
RIV:RI:DRP/B
Rl:DRS/EMB
RI:DRS/EMB
Al:DRP/D
JDHanna At- L e PAGoldbert _d (y(An RLNease A R
KDW3averdit.&
d
4
5/ T/b9
4/21/99
5/g /99
5/f/99
)
SRl:DRP/D
C:DRP/D
KMKennedy (AC
PHHarrell Mfer
1
5/ # /99
5/ so /99 ' h
OF ElCIAL RECORD COPY
<
4AY I t
- 9
.
Entergy Operations, Inc.
-3
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
]
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
1
'
DRS Director
MIS System
Branch Chief (DRP/D)
RIV File
Project Engineer (DRP/D)
Branch Chief (DRP/TSS)
)
\\
i?! 00:18
\\
l
DOCUMENT NAME: R:\\._ANO\\AN904RP.KDW
To receive copy of document, indicate in box: "C" = Co)y ethout enclosures "E" = Co ay uth enclosures "N" = No copy
RIV:RI:DRP/B
l
RI: Din'/EMB
RI:DRS/EMB
RI:DRP/D
JDHanna L-hL,e PAGoldber6Lt y(An RLNease &
KDW3averbsk,6 4
'
4/21/99
5/.( /99
5/.f /99
5/Jf%9
SRI:DRP/D
C:DRP/D
l
KMKennedy (.AL
PHHarrell t'Atk
5/ o /99
h
5/M /99
l
OFFICIAL RECORD COPY