IR 05000313/1999301

From kanterella
Jump to navigation Jump to search
Discusses Arrangements for Administration of Licensing Exam During Wk of 991213,per Telcon of 990602.As Agreed,Exams Repts 50-313/99-301 & 50-368/99-301 Will Be Prepared Based on Guidelines in Rev 8 of NUREG-1021
ML20195G302
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/09/1999
From: Pellet J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
References
RTR-NUREG-1021 50-313-99-301, 50-368-99-301, NUDOCS 9906160008
Download: ML20195G302 (4)


Text

SUBJECT:

INITIAL EXAMINATION - NRC INSPECTION REPORT 50-313/99 301; 50-368/99-301

Dear Mr. Hutchinson in a telephone conversation on' June 2,1999, between Mr. Giles, Operations Training

,

Supervisor, and Mr. Murphy, Chief Examiner, arrangements were made for the administration of licensing examinations at Arkansas Nuclear One, Unit 1, during the week of December 13, 1999.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 8 of NUREG-1021, " Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by August 2,1999. The written examinations, operating tests, and the supporting reference materials, as discussed, will be due by September 20,1999. Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval.

All materials shall be complete and ready-to-use. Any delay in receiving the required examination and reference materlats, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. A validation of the final examination material will be conducted at your facility the week of November 15,1999.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

9906160000 990609 PDR ADOCK 05000313 V

PDR

e n

>,

g

,

,

(.

,i

.

Entergy Operations, Inc.

2--

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on September 30,2000.

I The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> I

per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Intemet electronic mail at BJS1 @NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and ' Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Giles has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Michael Murphy at 817-860-8152, or Mr. John Pellet at 817-860-8159.

Sincerely,

-

CNOQWr John L. Pellet, Chief Operations Branch

,

Division of Reactor Safety l

Docket Nos.: 50-313;50-368 License Nos.: DPR-51; NPF-6 cc:

Sherrie Cotton, Training Manager Arkansas Nuclear One

Entergy Operations, Inc.

I 1448 S.R. 333 Russellville, Arkansas 72801-0967 e

?~ c x

tg j

!

l j

L

' Entergy Operations,Inc.

-3-

.

Executive Vice President

& Chief Operating Officer

'

Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995

>

Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286 Manager, Washington Nuclear Operations ABB Combustion Engineering Nuclear l

Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852

.

CountyJudge of Pope County Pope County Courthouse Russellville, Arkansas 72801

.

l Winston & Strawn

1400 L Street, N.W.

'

Washington, D.C. 20005-3502 i

David D. Snellings, Jr., Director, Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street, Mail Slot 30 Little Rock, Arkansas 72205-3867 Manager Rockville Nuclear Licensing Framatome Technologies

1700 Rockville Pike,' Suite 525 Rockville, Maryland 20852 =

,

j

(

L

'

>-

-v.

.;.

,

,

-.

>

'

Entergy Operations,Inc.

-4-bec to DCD

)(IE42)

bec distrib. by RIV:

Regional Administrator.-

Resident inspector.

DRP Director; DRS Director MIS System Branch Chief (DRP/D)

RIV File Project Engineer (DRP/D)

Branch Chief (DRP/TSS)

.

/

i

)

i 3.G0021 DOCUMENT NAME: R:\\_ANO\\AN93011t.mem.wpd To rocsive copy of document, Indicate in box: "C" = Copy without enclosures *E' = Copy with aposures *N* = No copy RIV:RI:OB

.,E, C:DRS\\OB 4-l t

MEMurphy/imdK/JLPellet Ml 06/t99 M'

06/%99 V'

T ~

OFFICIAL RECORD COPY I