Forwards Insp Repts 50-313/90-19 & 50-368/90-19 on 900601- 0715 & Notice of Violation.Util Should Respond to Failure to Adequately Implement Surveillance Test Required by Tech Specs
ML20058N974
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/10/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Carns N
ENTERGY OPERATIONS, INC.
Shared Package
ML20058N977 List:
References
NUDOCS 9008150280
Download: ML20058N974 (4)


See also: IR 05000313/1990019

Text

._.

._ -

..

-.

.

.

.

,

~

Ac.

..

,

.

-

'

Aus:10 500.

L

,

g

In Reply Refer To:

1

Dockets:

50-313/90-19

1

50-368/90-19:

.

'

Entergy Operations, Inc.

.

"

ATTN: Neil S..Carns, Vice President'

'

Nuclear,-Arkansas Nuclear One

.t

Route 3, Box 137G

Russellville, Arkansas 72801

'

Gentlemen:

I

This refers to' the inspection conducted by Messrs. C. C. Warren end R.: C Haag;

.

of this office during the period! June 1 through July 15, 1990,, of activities-

authorized by NRC Operating Licenses DPR-51 and'NPF-6 for Arkansas Nuclear One,

Units 1 and 2, and to the discussion of our-findings with you andLother members

of.your staff at the conclusion of the inspection.

l

Areas examined during the inspection included onsite followup of events,

operational safety verification, surveillance, maintenance,-and design changes.

.;

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and .

.

"

z

observations by the inspectors. .The findings are documented-in the enclosed

~

't

inspection report.

1

During this inspection, it was found that certain of'your activities were ir.-

I

violation of NRC requirements.

Violation A involves the failure to adequately

implement a surveillance test . required by the Technical Specifications 1and is:

1

of concern because of the continued pattern.of failure-to comply ~with Technical

Specification surveillances.

Consequently, you are-required to respond to-

'

Violation A, in writing, in accordance with the provisionsJof-Section 2,201 ofj

the NRC's " Rules'of Practice," Part 2, Title'10, Code of Federal Regulations.-

'

Your response should be based on the specifics, contained in the Notice of'

Violation enclosed ~ with this letter.

With respect to Violation B, the failure to document.a condition. adverse to

quality, it appeared that your staff had. initiated appropriate' corrective'

t

actions to address the violation; therefore, no written response is required.

R

We -will review the implementation of your actions during a' future' inspection.

-

The response directed by this letter and the accompanying Notice are not

i

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

.

'

l

I

5

'

M, D:DRPt th

I

C:DRP/A

"

CC

rafn

arrell

TFWesterman

JCollins

8/r /90

8/ /90

8/g/90

1 8/P/90

_

h -

9008150280 900810

PDR

ADOCK 05000313

'

O

PDC

i

i

.

.

.

-

..

.

-

,

.

_

__

_ .

_

1

t

,;,

.,

'-

.

f

Entergy Operations,=Inc.

-2-

l

Should you have any questions concerning this inspection, we will be pleased to

1

discuss them with you.

Sincerely,.

OdghalSigned By:

Thomas P.Gwynn

Samuel J. Collins, Director

Division of Reactor Projects

Enclo'sures: .

3

1.

Appendix A - Notice of Violation

2; Appendix'B - NRC Inspection Report

50-313/90-19

r

50-368/90-19

!

3.

Appendix C - Midcycle Quarterly Plant

.

Performance Review Outline

-cc w/ enclosures:

Entergy Operations, Inc.

ATTN: Donald C. Hintz, Executive

Vice President

P.O. Box 31995

>

Jackson, Mississippi

39286

,

1

<

Entergy Operations, Inc.

ATTN: Gerald W. Muench, Vice President

Operations Support

,

P.O. Box 31995

'

Jackson, Mississippi

39286

Wise, Carter, Child & Caraway

ATTN: Robert B. McGehee, Esq.

P.O. Box 651

Jackson, Mississippi

39205

Arkansas Nuclear One

ATTN: Early Ewing, General Manager

Technical Support and Assessment

Route 3, Box 137G

Russellville, Arkansas 72801

i

' Arkansas Nuclear One

-ATTN: Jerry Yelverton, Director

Nuclear Operations

Route 3, Box 137G.

Russellville, Arkansas 72801

>

__

..-

,,,-

,

'

..

i

"

- Entergy. Operations, Inc.

-3-

,

' Arkansas' Nuclear One

' ATTN: Mr. Tom W. Nickels

Route 3, Box >137G.

.Russellville, Arkansas .72801

Combustion: Engineering, Inc.

ATTN: Charles B. Brinkman, Manager

1

Washington Nuclear'0perations

12300 Twinbrook Parkway, Suite 330

'Rockville, Maryland. 20852

Honorable Joe W.~.Phillips-

1

County Judge of. Pope County-

Pope County Courthouse

<

Russellville, Arkansas : 72801

'

Bishop, Cook, Purcell & Reynolds.'

ATTN: Nicholas S. Reynolds, Esq.

l

- 1400 L Street, N.W.

Washington, D.C.

20005-3502-

,

Arkansas Department of Health

ATTN: Ms. Greta Dicus, Director-

Division of Environmental-Health

Protection

4815 West Markam Street

Little Rock, Arkansas 72201

Babcock'& Wilcox

.

Nuclear Power Generation Divisior.

I

ATTN: Mr. Robert B.-Borsum

1700 Rockville Pike, Suite 52o-

L

Rockville, Maryland 20852

L

l

U.S. Nuclear Regulatory Commission

,

ATTN: Senior Resident Inspector

1 Nuclear Plant Road

Russellville, Arkansas 72801

,

,

U.S.. Nuclear Regulatory Commission

ATTN:

Regional Administrator, Region IV

611-Ryan Plaza Drive, Suite 1000

' Arlington, Texas 76011

L

-l

1

!

i.

-

1

1

-

_

_

' _ . .

. ..

'

,.

- J

1

- Entergy Operations, Inc.

-4-

m.

,

-

bec to DMB (IE01)

,

bec distrib. hy RIV:

,

  • R. D. Martin-

Resident ~ Inspector-

SectionChief(DRP/A).

  • DRSS-FRPS

- *

-Lisa Shea; RM/ALF

RIV File'

  • DRP
  • MIS' System

^*RSTS Operator

Project Engineer. (DRP/A) .

,

  • DRS
  • T. Alexion, NRR Project Manager (MS: -.13-E-21) .
  • C

Poslusny,-NRR Project Manager (MS:

13-D-18)

  • w/766

.

.it

!

- !

i

i

i

.<

1

,

'i

i

r

s

-

a