ML20206S472
| ML20206S472 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 05/14/1999 |
| From: | Good G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hutchinson C ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20206S476 | List: |
| References | |
| 50-313-99-07, 50-313-99-7, 50-368-99-07, 50-368-99-7, NUDOCS 9905210143 | |
| Download: ML20206S472 (5) | |
See also: IR 05000313/1999007
Text
.
f#' %,
UNITED STATES
.:
t
NUCLEAR REGULATORY COMMISSION
a'
.
?,
-
Ta
j
REGloN IV
o
611 RYAN PLAZA DRIVE, sulTE 400
ARLINGTON, texas 76011-8064
,,,,,
flay 14,1999
l
l
l
C. Randy Hutchinson, Vice President
Operations
Arkansas Nuclear One
Entergy Operations, Inc.
i
1448 S.R. 333
l
Russellville, Arkansas 72801-0967
SUBJECT: NRC INSPECTION REPORT NO. 50-313/99-07; 50-368/99-07
Dear Mr. Hutchinson:
i
This refers to the inspection conducted on April 26-31,1999, at the Arkansas Nuclear One,
l
Units 1 and 2 facilities. The enclosed report presents the results of this inspection.
Areas examined during this inspection included portions of your physical security program. We
determined that your physical security program was properly implemented.
During the inspection, we determined that your staffing of armed response personnelinside the
l
protected area was in accordance with the minimum requirements of the physical security plan.
l
During the October 31 - November 3,1994, Operational Safeguards Response Evaluation
(OSRE), you exceeded the minimum requirements of the physical security plan and elected to
!
utilize four additional armed response personnel to successfully demonstrate your ability to
l
defend against the design basis threat. The requirement to defend against the design basis
'
threat is addressed in 10 CFR 73.55(a). The results of your OSRE were documented in an
NRC report dated December 6,1994.
Subsequent to your 1994 OSRE, you have maintained an appropriate number of on-duty armed
l
security personnel inside the protected area. However, as discussed during the exit meeting on
l
April 30,1999, there remains a difference between the number of armed responders described
l
in the industrial security plan and the additional number of armed response personnel used
during the 1994 OSRE to demonstrate your ability to defend against the design basis threat, as
discussed in Section S6.2 of this report.
We request that you provide us, within 30 days of the report date, an evaluation of your
l
provisions to maintain an adequate level of response force personnel on-site. Your evaluation
!
should not include safeguards information if possible.
l
l
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
'
enclosure will be placed in the NRC Public Document Room (PDR).
9905210143 990514
ADOCK 05000313
G
_
.
.
Entergy Operations, Inc.
-2-
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you,
'
Sincerely,
.
_
Gail M. Good, Chief
Plant Support Branch
Division of Reactor Safety
l
Docket Nos.: 50-313,50-368
.
l
Enclosure:
1
NRC Inspection Report No.
l
50-313/99-07;50-368/99-07
cc w/ enclosure:
Executive Vice President
l
& Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286
Manager, Washington Nuclear Operations
l
ABB Combustion Engineering Nuclear
l
'
Power
l
12300 Twinbrook Parkway, Suite 330
'
Rockville, Maryland 20852
County Judge of Pope County
Pope County Courthouse
Russellville, Arkansas 72801
l
Winston & Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
-
.
'
Entergy Operations, Inc.
-3-
David D. Snellings, Jr., Director
Division of Radiation Control and
Emergency Management
4815 West Markham Street, Mail Slot 30
Little Rock, Arkansas 72205-3867
i
Manager
Rockville Nuclear Licensing
Framatome Technologies
!
1700 Rockville Pike, Suite 525
(
Rockville, Maryland 20852
l
l
l
l
1
l
l
l
l
l
t
I
.
.
Entergy Operations, Inc.
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
'
bec to DCD (IE04)
bec distrib. by RIV:
i
Regional Administrator
Resident inspector
DRS Director
DRP Director
MIS System
Branch Chief (DRP/C)
Project Engineer (DRP/C)
Branch Chief (DRS/PSB)
l
RIV Docket File
j
l
D. Orrik (NRR/DIPM/lOHB/RSS, MS: 12E11)
i
Elaine Koup (NRR/DIPM/lOHB/RSS, MS: 12E11)
i
l
i
l
l
'
I
'
j
DOCUMENT NAME: R:\\_ANO\\AN907RP.DWS.WPD
-
To receive copy of document, Indicate in box: "C" = Copy withoutjapks; r
Copy with enclosures "N" = No copy
"
RIV:PSB
_
RIV:PSB
En C:D M [ f / C:DRS/PSB
Peer Review M-
DWSchaefer:rd PHarrellX F /
GMGoodM V
05/ L I /99
05/ ll
/99'
05/ l%4/97
05/ \\W /99
,
OFFICIAL RECORD COPY
l
l
l
L
)
i
Entergy Operations, Inc.
-4-
E Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
)
bec to DCD (IE04)
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRS Director
DRP Director
MIS System
Branch Chief (DRP/C)
Project Engineer (DRP/C)
Branch Chief (DRS/PSB)
RIV Docket File
D. Orrik (NRR/DIPM/lOHB/RSS, MS: 12E11)
Elaine Koup (NRR/DIPM/lOHB/RSS, MS: 12E11)
\\
DOCUMENT NAME: R:\\_ANO\\AN907RP.DWS.WPD
i
To receive copy of document. Indicate in box: "C" = Copy without3qcloss r
Copy with enclosures "N" = No copy
"
RIV:PSB
_
RIV:PSB
E, C:D W l' //
C:DRS/PSB
Peer Review TV(
DWSchaefer:rA, PHarrellX V /
GMGood,Lii(#'
05/ L I /99
05/ ;I
/99'
05/ l@ /97
05/ lW /99
OFFICIAL RECORD COPY
210030