MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 ML20217J4971999-10-18018 October 1999 Requests Addl Info Re Results of Util Most Recent Steam Generator Insp at ANO-2 & Util Methodology Used to Predict Future Performance of SG Tubes ML20217J3871999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through SG, Rev 0 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs ML20217J3601999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Integranular Attack in Tubesheets of Once-Through SG, Rev 1 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp ML20217D1721999-10-0808 October 1999 Forwards RAI Re 990729 Request for Amend to TSs Allowing Special SG Insp for Plant,Unit 2.Questions Re Proposed Insp Scope for Axial Cracking Degradation in Eggcrate Support Region Submitted.Response Requested by 991015 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included ML20212L0621999-10-0101 October 1999 Forwards Safety Evaluation & Exemption from Certain Requirements of 10CFR50,App R,Section III.G.2, Fire Protection of Safe Shutdown Capability 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR ML20212F5031999-09-22022 September 1999 Forwards SER Granting Relief Requests 1-98-001 & 1-98-002 Which Would Require Design Mods to Comply with Code Requirements,Which Would Impose Significant Burden Pursuant to 10CFR50.55a(g)(6)(i) 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments ML20212D9961999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Arkansas Nuclear One.Nrc Plan to Conduct Core Insps at Facility Over Next 7 Months.Details of Insp Plan Through March 2000 Encl 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211L4901999-09-0101 September 1999 Forwards Insp Repts 50-313/99-12 & 50-368/99-12 on 990711- 0821.No Violations Noted ML20211J2351999-08-31031 August 1999 Forwards Request for Addl Info Re SG Outer Diameter Intergranular Attack Alternate Repair Criteria for Plant, Unit 1 ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211F4181999-08-25025 August 1999 Forwards SE Accepting Licensee 980603 & 990517 Requests for Approval of risk-informed Alternative to 1992 Edition of ASME BPV Code Section Xi,Insp Requirements for Class 1, Category B-J Piping Welds ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves IR 05000368/19990111999-08-12012 August 1999 Forwards Insp Repts 50-313//99-11 & 50-368/99-11 on 990719-23.No Violations Noted.Insp Focused on Review of Licensed Operator Requalification Program & Observation of Requalification Exam Activities at Unit 1 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 ML20210L3581999-07-29029 July 1999 Ltr Contract,Task Order 43, Arkansas Nuclear One Safety System Engineering Insp (Ssei), Under Contract NRC-03-98-021 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D8131999-07-28028 July 1999 Forwards Request for Addl Info Re SG Tube End Cracking Alternate Repair Criteria for Plant,Unit 1 ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 ML20210C2191999-07-21021 July 1999 Forwards Insp Repts 50-313/99-08 & 50-368/99-08 on 990530-0710 at Arkansas Nuclear One,Units 1 & 2,reactor Facility.No Violations Noted.Conduct of Activities at Plant Generally Characterized by safety-conscious Operations ML20209H5251999-07-15015 July 1999 Informs That as Result of NRC Review of Licensee 980701 & 990311 Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 RAI, Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20209E5551999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1,staff Revised Info in Rv Integrity Database & Releasing Database as Rvid Version 2 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20210K1621999-07-0707 July 1999 Informs That Licensee in Process of Preparing Scope of Service Delineation for Environ Assessment to Be Performed for New Airport Located Near Russellville,Ar,To Identify Anticipated Environ Impacts from Various Agencies 1CAN079902, Documents ANO-1 Position Discussed on 990705,with Members of NRC Staff & Formally Requests Enforcement Discretion from Requirements of TS 3.7.2.C to Allow Continued Power of Operation1999-07-0606 July 1999 Documents ANO-1 Position Discussed on 990705,with Members of NRC Staff & Formally Requests Enforcement Discretion from Requirements of TS 3.7.2.C to Allow Continued Power of Operation ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl 0CAN069906, Forwards Corrected Pages to 1997 & 1998 Annual Radiological Environ Operating Repts, Issued 980430 (0CAN049804) & 990506 (0CAN059902).Ltr Number & Page Number Are at Top of of Corrected Pages to Replace Originally Pages1999-06-30030 June 1999 Forwards Corrected Pages to 1997 & 1998 Annual Radiological Environ Operating Repts, Issued 980430 (0CAN049804) & 990506 (0CAN059902).Ltr Number & Page Number Are at Top of of Corrected Pages to Replace Originally Pages 1CAN069905, Forwards non-proprietary Version of Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs1999-06-17017 June 1999 Forwards non-proprietary Version of Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs 0CAN069903, Submits Rept of Each Change to or Error Discovered in Acceptable Evaluation Model or in Application of Such Model for ECCS That Affects Peak Cladding Temp,Iaw 10CFR50.46(a) (3)(ii)1999-06-10010 June 1999 Submits Rept of Each Change to or Error Discovered in Acceptable Evaluation Model or in Application of Such Model for ECCS That Affects Peak Cladding Temp,Iaw 10CFR50.46(a) (3)(ii) 2CAN069901, Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 20001999-06-0202 June 1999 Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 2000 1CAN069901, Submits 10CFR50.46 Rept Re Inconsistent Input in SBLOCA Analysis.Rept Submitted in Accordance with Recommendations Stated in Notice1999-06-0202 June 1999 Submits 10CFR50.46 Rept Re Inconsistent Input in SBLOCA Analysis.Rept Submitted in Accordance with Recommendations Stated in Notice 0CAN059906, Forwards Response to NRC 990402 RAI Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs1999-05-28028 May 1999 Forwards Response to NRC 990402 RAI Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs ML20207E4341999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Changes in ECCS Analysis for ANO-1.CRAFT2 Limiting PCT for ANO-1 Was Bounded by 1859 F PCT Calculated at 2568 Mwt for Crystal River 3 Cold Leg Pump Discharge Break Size of 0.125 Ft 1CAN059904, Informs NRC That Wl Franklin No Longer Has Need to Maintain Operating License on Ano,Unit 1.Requests License for Wl Franklin Be Withdrawn1999-05-20020 May 1999 Informs NRC That Wl Franklin No Longer Has Need to Maintain Operating License on Ano,Unit 1.Requests License for Wl Franklin Be Withdrawn 2CAN059906, Informs That ANO-2 UFSAR Will Be Revised to Include Comprehensive Discussions of Each Category of Containment Penetration Overcurrent Protective Devices,Per NRC Review of 980806 TS Change Request Re Relocation of TS Table 3.8-11999-05-18018 May 1999 Informs That ANO-2 UFSAR Will Be Revised to Include Comprehensive Discussions of Each Category of Containment Penetration Overcurrent Protective Devices,Per NRC Review of 980806 TS Change Request Re Relocation of TS Table 3.8-1 1CAN059902, Responds to NRC 990406 RAI Re risk-informed Inservice Insp Pilot Application,Submitted 980603.Approval of Alternative Is Requested Prior to End of July 1999,to Allow Sufficient Time for Util to Revise ANO-1 ISI Program1999-05-17017 May 1999 Responds to NRC 990406 RAI Re risk-informed Inservice Insp Pilot Application,Submitted 980603.Approval of Alternative Is Requested Prior to End of July 1999,to Allow Sufficient Time for Util to Revise ANO-1 ISI Program 2CAN059905, Expresses Appreciation for Staff & Mgt Team Efforts in Aggressively Pursuing Risk Informed ISI Initiative1999-05-14014 May 1999 Expresses Appreciation for Staff & Mgt Team Efforts in Aggressively Pursuing Risk Informed ISI Initiative ML20206P7681999-05-10010 May 1999 Forwards Applications for Renewal of Operating License (Form 398) for MW Little & F Uptagrafft.Without Encl 2CAN059903, Forwards Rev to Footnote Submitted to Provide Clarity to Aforementioned Guidance1999-05-10010 May 1999 Forwards Rev to Footnote Submitted to Provide Clarity to Aforementioned Guidance ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 ML20206H7121999-05-0606 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept, for Ano.All Radionuclides Detected by Radiological Environ Monitoring Program During 1998 Were Significantly Below Regulatory Limits 1999-09-09
[Table view] |
Text
.
s'
~~~~~ Entergy opereUone,Inc.
1448 SA 333 RtseeMe, AA 72801
, =
TJ 501858 5000
[ October 4,1999 1CAN109905-Mr. Ellis W. Merschoff Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064
Subject:
Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Special Report - Once Through Steam Generator Tubing Surveillance -
Category C-3 Results
Dear Mr. Merschoff:
Steam generator tubing inspections of the Arkansas Nuclear One, Unit 1 (ANO-1), once I through steam generators (OTSGs) were performed during the IRIS scheduled refueling outage which began September 10, 1999. The inspections performed on both OTSGs i involved a 100% full-length bobbin coil examination. Also performed in IRI5 was a 100%
rotating pancake coil (RPC) probe inspection in the hot leg (HL) upper roll transition (URT) region. The RPC used consists of a Plus Point coil and a 0.115 inch pancake coil. The RPC was also utilized for confirmation of bobbin coil calls. The RPC was used to test the lower tubesheet rolls, lower tubesheet crevices, sleeves, dented locations, and rerolls that were installed in the previous refueling outage The "A" steam generator was classified as C-3 in two areas. The "B" steam generator was classified as C-3 in one area. Since the only sizing technique approved for OTSGs is for wear, all the indications, with the exception of Tube End Cracks (TECs) and Upper Tubesheet (UTS) Intergranular Attack (IGA) that meet specific accep+ance criteria, were considered defective and included in the general classification. This resulted in greater that 1% of the tubes being classified as defective in the "A" OTSG. The second specific area in the "A" OTSG that was C-3 was the rerolls that were installed in IR14. The "B" OTSG was C-3 due to rerolls as well.
[
I These inspections resulted in plugging 213 tubes in the "A" OTSG and 63 tubes in the "B" i OTSG. Sleeves were not utilized to repair defective tubes identified duiing this inspection.
~
9910120299 991004 PDR ADOCK 05000313 G PDR
- x ,
U. S.-NRC I October 4,1999
' ICAN109905 Page 2
' Additionally, 78 tubes in the "A" OTSG and 33 tubes in the "B" OTSG were repaired by
' rerolling in the upper tubesheet Entergy Operations is reporting the inspection results in accordance with ANO-1 Technical Specifications (TSs) 4.18.6 and 6.12.5 for results which have been categorized C-3 (more than 10% of the total tubes inspected are degraded tubes or more than 1% of the inspected tubes are defective). Additionally, NEI 97-06 requires that a plugged tube report be submitted within 15 days of each inservice inspection of SG tubes.
This submittal also includes the information requested for that report.
PLAN 1 DESCRIPTION ANO-1 utilizes Babcock and Wilcox (B&W) model 177 OTSGs which began operation in 1974.' The two OTSGs each contain 15,531 sensitized alloy 600 tubes with a 0.625" outer diameter and a 0.037" wall thickness. The tubes were pastially depth rolled in the 24 inch tubesheets. The 15 tube support plates (TSPs) are made of carbon steel with a three lobed broach ' design. Mechanical B&W sleeves (31" and 80") have been installed in the upper portion of the tube bundle.
INSPECTION RESULTS A comprehensive eddy current exammation was perfonned on the OTSGs during the IRIS outage. The inspections were performed with equipment and techniques qualified in accordance with Appendix H of the Electric Power Research Institute (EPRI) PWR Steam Generator Examination Guidelines, Rev. 5, or demonstrated equivalent. The methods used are capable of detecting inactive, active, and potential mcdes of degradation. Table i provides a breakdown of the initial scope and expansions based on number of examinations.
l U. S. NRC l
October 4,1999
( ICAN109905 Page 3
)
TABLE 1 1R15 Inspection Summary Iest Tyne # Planned % Scone Catenory Espansion I A OTSG I General Examination C-3 e - Bobbin 14423 100 No e RPC URT 12460 100 No <
e B&W Sleeves 96 20 Yes I e B&W Sleeve Expansion 379 100 No e UTS IGA '278* 100 No e RPC LRT 393 20 No j e RPC LTS Crevice 742 20 No l e Super Heat Dented Locations 102 20 No Rerolls 1%3 100 C-3 No B OTSG l General Examination C-2 !
e Bobbin 14776 100 No )
e RPC URT 13621 100 No I e - B&W Sleeves 98 20 No e UTS IGA 173* 100 No e RPC LRT 231 20 No e RPC LTS Crevice 420 20 No e Super Heat Dented Locations 28 20 No Rerolls 1155 100 C-3 No
- Number of previously detected IGA indications LRT = lower roll transition LTS = lower tubesheet I Two alternate repair criteria (ARC) have been approved fo use in the ANO-1 OTSGs i through Technical Specifications amendments. The first ARC permits IGA in the upper tubesheet to remain in service for Cycle 16. The second ARC pertains to TECs in either the upper or lower tubesheets. These two degradation mechanisms will be addressed in detail in the 90 day operational assessment report.
l L
E.
U. S. NRC October 4,1999 1CAN109905 Page 4 EVALUATION OF INSPECTION RESULTS Table 2 list the type and number ofindication found during IR15:
TABLE 2 l
1R15 Flaw Summary l
l Upper Roll Tebe End 1 39 l 2 l Upper Roll Yransition 139 l 47 l Freespan 27 l 23 l Lower Roll Transition 0 l 0 l l Lower Tubesheet Crevice 0 l 0 l l Dents /Dmgs 0 l 0 l Sleeve Transitions 6 Sleeves 0 l
l 1 Parent Tube l Rerolls 101 l 21 As noted in Table 2, the number of defective tubes due to indications in the upper roll
, transitions in the "A" OTSG and the rerolls in both OTSGs were greater than 1% of the corresponding number of tubes in that category. The tubesheet IGA and the TECs are considered under the ARCS and only counted as defective toward the general C-3 categorization if the tubes exceeded the ARC criteria. The individual damage mechanisms are i discussed separately below. Figure 1 illusuates the different modes of degradation detected during the IRIS inspection.
l l
L c.
U.S.NRC l- October 4,1999 I I
ICAN109905 Page 5 l
FIGURE 1 l OTSG Degradation Detected During 1R15 Inspection l l
1 1
rt 3r ; i t wir f/HHHHHHHH) WA%ZVHHH/HHHH// L 9w Sleeve Flaws- " "* URT ,,
PWSCC Mechanical Wear
~
3,p \ A FreespanGroove IGA 2 117 l
l RcRoll p s r 1r l
i hulicadons" "
w.3 Retoll ,,
, h@y[I aj, nor
- n*
J. 5
udder Roll Transition Over the past three upper roll area inspections (IR13, IR14, and IRI5) there have been indications detected in the roll transition. These indications are detected with the 0.115" pancake coil and/or the Plus Point coil. Pnmary water stress corrosion cracking (PWSCC) has been confirmed in this general area (URT) through tube pulls at ANO-1, Oconee and Davis Besse.
As with the other modes of degradation contamed within the upper tubesheet the flaws provide no burrt concerns. Table 3 provides a history of the URT PWSCC with the predicted IRIS numbers based on the cycle 15 operational assessment and the number of flaws detected during IRIS. The number of l
URT PWSCC indications are well within the range predicted by the cycle 15 operational assessment.
l TABLE 3 l Upper Roll Transition Cracking aw;r t,. .> mi;' .; m 3 A~ w yq m g: w ';;~,qmyg;+rii'4;-g 4a;3mpw ew 1F-- 57 180 137 139 s , e ?WL l ; TON # 52 172 131 47 1
E
p .. 1
. U. S. NRC October 4,1999 ,
1CAN109905 Page 6 j t
'Freessan This form of degradation is clas::ified as axial aligned IGA believed to be associated with grooves created by the broached lands when the tubes were inserted during assembly. The j
. degradation is located in the freespan lxtween the support structures, mainly in the upper
! bundle region where elevated temperatures exist. A few indications were detected at TSP locations and in the LTS. This degradation was identified in the ANO-1 OTSG tubing for the first time in 1R13.
Due to the small number ofindications detected in the lower tubesheet and the tube suppost plate locations they are considered along with the freespan flaws, consistent with the previous operational assessment. The number of defective tubes detected during the IRIS in=~*ian was well within the range of values contained in the cycle 15 operational assessment. Table 4 provides a history along with a IRIS projected and actual freespan flaws detected.
TABLE 4 '
Freespan Degradation 12 - 55 75 56 13 20 27 30 Rerolls During the previous outage there were 1,963 tubes in the "A" OTSG and 1,155 in the "B" OTSG to which a one inch repair roll (reroll) was performed. The reroll creates a new RCS
. pressure boundary beyond the degraded section of tubing. The process was developed and qualified by Framatome Technologies Inc. and the B&WOG and was approved for use by the NRC on April 10,' 1998, by TS Amendment 190 (ICNA049802). This was tle first repair roll effort performed on the ANO-1 OTSGs. As part of the requirements for implementation, a 100% eddy current exam was performed during 1R15 on the rolls installed during IR14. This exam consisted of using a RPC/Plus Point technique for detection of degradation. During this exam several indications were detected in roll area. These indications were broken down into two categories (volumetric and axial / mixed mode). The volumetric indications are likely small IGA patches.' However, they could be an installation induced anomalous signal that was produced during the reroll process. Regardless of the cause, indications detected in the roll resulted in plugging the affected tube. The axial / mixed mode indications are likely PWSCC at the roll transition and in some cases extending into the 1" effective roll.
c .-
U. S. NRC October 4,1999 1CAN109905 Page 7 Tube End Crackine During the IR14 refueling outage a 100% Plus Point upper roll area inspection was performed and as a result indications were detected in the heat affected zone (HAZ) region of the tube end. A root cause analysis determined the flaws to be most likely PWSCC. The indications had been identified at ANO prior to 1R14 and at other OTSGs, but were believed to be above the tubesheet and therefore outside the pressure boundary. During a IR14 bubble test two of the tube indications were found to leak, and the subsequent investigation led to the conclusion that repairs'were necessary. Subsequent to IR14, the B&WOG developed a TEC ARC for l . this speci6c degradation mechanism and location. The ARC was approved by the NRC for use at ANO-1 by TS Amendment 201 on September 14,1999 (ICNA099903), allowing the indications to remain in service based on meeting specific criteria including radial position and
- associated flawleakage.
I f
During the IRIS inspection there were a total of 803 tubes containing TECs in the "A" OTSG l and 213 tubes in the "B" OTSG. Of these flaws,39 tubes did not meet the ARC criteria (e.g.,
l circumferential orientation) and were repaired or plugged. A listing of the tubes containing axial TECs along with a detailed leakage assessment will be provided to the s'.aff as part of the
, 90 day report per TS 4.18.6.
i Unner Tubesheet IGA .
Intergranular Attack (IGA) in the upper tubesheet has been present since the early 1980s timeframe with very little change or growth. Since the cause of the IGA (high sulfate) has been eliminated, the IGA initiation rate is essentially zero. An ARC that allows the IGA detected during the IRIS inspection to remain in service for the duration of Cycle 16 was approved for use by ANO-1 TS Amendment 202, issued October 4,1999 (ICNA109901).
l The ARC is based on comparing three current eddy current parameters with previous readings L (Plus Point amplitude, axial length and circumferential extent). As part of the acceptance l criteria, an overall population growth comparison was performed on the IGA flaws detected l during 1R14. There were 278 IGA flaws in the "A" OTSG and 173 IGA patches in "B" l OTSG that made up the population for the growth comparison. The comparison concluded that no overall population growth was evident. Growth data was provided to the NRC in correspondence dated September 24,1999 (1CAN099906). ,
I L Additional measures per the management program require each IGA indication to be assessed L against a set of repair limits. A total of four indications exceeded the repair limit and were j plugged. A detailed assessment of the IGA will be submitted to the NRC as part of the 90 day report per TS 4.18.6.
1 I
i l
l
U. S. NRC
~'
October 4,1999 l 1CAN109905 Page 8
.Et2138 During the IRIS sleeve Plus Point inspection, seven indications were detected during the exam of the "A" OTSG. Of the seven indications, one was a parent tube indication in a lower rolled joint. The other six were sleeve ID indications in the upper roll expansion of the upper joint. The exam consisted of 100% of the "A" OTSG and 20% of the "B" OTSG.
During a IR13 (Oct.1996) sleeve transition Plus Point exam,10 indications were detected in the parent tube of various roll locations. Additionally, one indication was identified at the upperjoint of a sleeve. This was the first time inservice sleeves were repaired at ANO-1 due to eddy current indications. It is believed that the parent tube indications, both the ten detected during 1R13 and an additional one detected during the IR14 inspection (100% Plus Point) were all anomalous indications and had been present since installation. It should be noted that the parent tube indications are not necessarily signals from degradation.
Nonetheless, the indications will continue to be conservatively plugged. The one indication detected in the lower joint of the parent tube during the IRIS inspection is included in this category. However, the six indications in the sleeve ID were crack-like.
In-situ Pressure Testine j In-situ pressure testing was performed on a total of 5 flaws. The reason for testing is to provide data for the upcoming operating assessment and to ensure the condition monitoring criteria is met. The tubes are listed in Table 5. The tubes tested included two tubes containing axial cracks in the rerolls, two circumferential cracks in rerolls, and one tube containing multiple freespan flaws. The tubes located within the tubesheet were tested up to the main steam line break (MSLB) pressure to measure any leakage. No structural testing is required since burst is precluded in the tubesheet. None of the tubes leaked at the temperature corrected MSLB pressure of 2850 psi. The freespan cracks were tested in stages at normal operating, MSLB, and three times normal operating pressure differential (AP). No leakage was observed at normal operating AP or MSLB, and the tube held 3AP with no leakage or burst. Based on the result of these tests and previous in-situ tests performed at ANO-1, all tubes met the condition monitori'ng criteria for accident induced leakage and stmetural integrity.
l i
l
U. S. NRC l October 4,1999 1CAN109905 Page 9 !
1 l
TABLES l ANO-1 IN-SITU TEST RESULTS FOR 1R15 OTSG Row Tube Flaw Type Normal l Main 3AP Leakage l Operating Steam Line i Pressure Break B 111 6 MAI- Reroll 1450 2850 N/A - 0 <
B 145 34 MAI- Reroll 1450 2850 N/A 0 B 52 3 SCI- Reroll 1450 2850 N/A 0 B 38 12 SCI- Reroll 1450 2850 N/A 0 A 110 2 MAI-Freespan 1450 2850 4350 0 MAI = multiple axialindication SCI = single circumferential indication ROOT CAUSE AND CORRECTIVE ACTIONS Tubing degradation has been reported in earlier C-3 reports. The roll transition cracks are attributed to PWSCC. The freespan cracks are identified as outside diameter IGA / SCC, generally located in the area of grooves / scratches in the tubing.
The axial degradation in the reroll upper transition (heel transition) was unexpected after one cycle. Based on the location and prior industry experience the cause is likely classical PWSCC. A root cause is being perforn.m under the corrective action program to further investigate the condition.
CONCLUSIONS In summary, a comprehensive eddy current examination was performed in accordance with NEI 97-06. Both OTSGs were tested 100% full length with the bobbin coil and 100% at the hot leg roll transition region with Plus Point. Based on the in-situ pressure test results for the selected flaws, which are considered bounding, the condition monitoring criteria are satisfied.
The population growth rate assessment of the upper tubesheet volumetric IGA indications demonstrated that these indications are not growing.
ANO-1 utilizes N-16 monitors for primary-to-secondary leakage detection, as well as condenser off-gas and main steam line radiation monitors. The techrscal specification limit on primary-to-secondary leakage is 0.104 gallon per minute (150 gallons per day). Abnormal operating procedures are in place in the event that leakage is detected. Entergy Operations is sensitive to the potential rapid progression of tube leakage and will take the necessary measures upon detection, should a primary-to-secondary leak occur. Operators routinely train on primary-to-secondary leaks and tube ruptures utilizing the simulator. Chemistry routinely collects samples on a weekly basis and calculates leakage based on tritium and Argon 41.
/
U. S. NRC
- October 4,1999 1CAN109905 Page 10 There was no evidence of primary-to-secondary leakage during the last operating interval
" (valu6s were below the minimum detectable level of 5 gallons per d y).
Based upon the comprehensive actions performed during IRIS in conjunction with the ability to rapidly detect and respond to any primary-to-secondary leakage, as described above, ANO-1 is safe to resume plant operation. An operational assessment will be completed within 90 days following startup. Based upon the results of 1R15, it is anticipated that this assessment will demonstrate it is safe to operate ANO-1 for the entire duration.of the next fuel cycle. The next planned outage is in the spring of 2001.
Should you have any questions regarding this submittal, please contact me.
Very truly yours, e
i T D. Vander Director, Nuclear afety JDV/jjd cc: U. S. Nuclear Regulatory Commission Document Control Desk Mail Station OPl-17 Washington, DC 20555 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 Mr. Nick Hilton NRR Project Manager Region IV/ANO-1 U. S. Nuclear Regulatory Commission i NRR Mail Stop 04-D-03 One White Flint North I 11555 Rockville Pike Rockville, MD 20852 1