0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl

From kanterella
Jump to navigation Jump to search

Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl
ML20209H861
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 07/14/1999
From: Hutchinson C
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20209H867 List:
References
0CAN079902, CAN79902, TAC-MA4368, TAC-MA4382, NUDOCS 9907210085
Download: ML20209H861 (3)


Text

..

Ent:rgy oper; tion 3,Inc.

\

l

_"nErttergy 1448SH 333

==

C. Randy Hutchinson wvkum (WMrs A0 l July 14,1999 OCAN079902 l U. S. Nuclear Regulatory Commission C.)cument Control Desk Mail Station OPI-17 Washington, DC 20555

Subject:

Arkansas Nuclear One- Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Follow-up Information Concerning Proposed Administrative Controls Technical Specifications Changes (TAC Nos. MA4368 and MA4382)

Gentlemen:

By [[letter::0CAN119801, Application for Amends to Licenses DPR-51 & NPF-6, Implementing Consolidated EOI QA Plan Manual Submitted on 980430 & Approved by NRC in 981106 Se.Changes Also Clarify Responsibilities on STA Position on Shift|letter dated November 24,1998]] (0CAN119801) Entergy Operations requested changes to the Arkansas Nuclear One (ANO), Unit 1 and Unit 2 Technical Specifications (TS) revising the Administrative Controls Technical Specifications. Additionalinformation was provided by letter dated February 25,1999 (0CAN029902). In subsequent conversations with the ANO-NRR project managers, the Staff reguested additional changes to the proposed TS pages.

The proposed requirements of ANO-1 TS 6.2.2 and ANO-2 TS 6.2.2.h have been revised.

The proposed functional description of" operations staff middle manager" has been replaced with a reference to the functional description " assistant operations manager." Comments from the NRC Staffindicated that the use of" operations staff middle manager" would not require the individual holding the senior reactor operator license to be in the Operations chain of command. Referring to the functional description of" assistant operations manager" provides assurance that the individual performing this function is in the direct operations chain of command.

The proposed requirements of ANO-1 TS Table 6.2-1 item 5 and ANO-2 TS 6.2.2.f have also been revised. Comments from the NRC Staff indicated that the use of" shin crew" in the description of the individual providing advisory technical assistance did not provide an appropriate reporting relationship for this function. Therefore, " shift crew" has been replaced with the functional description of" shift supervisor " It is Entergy Operations' understanaing that this proposed requirement does not prevent ANO-1 and ANO-2 from exercising either option presented in Generic Letter 84-04, " Policy Statement on Engineering Expertise on Shift" It is also our understanding that, ccr 'ent with the generic letter, this function may be provided by the individual fulfilling the funa escription of the shift supervisor.

\

9907210085 990714 /

PDR ADOCK 05000313 p PDR l

I 1 j

U. S. NRC

. July 14,1999 OCAN079902 Page 2 Please find attached the revised TS pages for ANO-1 and ANO-2 which replace those previously provided in the November 24, 1998 submittal. The conclusions of the no significant hazards consideration of November 24,1998 submittal remain unchanged by this information. Should you have any further questions, please contact me.

Very truly yours , j //

' ~

)- .

CRH/dw Attachments i

To the best of my knowledge and belief, the statements contained in this submittal are triae. l 1

SUBSCRIBED AND SWORN TO before a Notary P iblic in and for b County and the State of Arkansas, this / day of nA~ ,1999. '

0 i

.  ;======

" OFFICIAL SEAL"

.C Andrea Pierce Notarypublic

< Notary Public, State of Arkansas C My Commission Empires g//f/2od 7 [ Mycornn5ssInN bsnm e

/  ::::::::::::::::::::::_

1

=e .g U. S. NRC

. July 14,1999 . j

- OCAN079902 Page 3

, cci Mr. Ellis W. Merschoff -

Regional Administrator -

U. S. Nuclear Regulatory Commission Region IV .

611 Ryan Plaza Drive, Suite 400

' Arlington, TX 76011-8064-NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 '

London, AR 72847 Mr. Nick Hilton NRR Project Manager Region IV/ANO-1

. U. S. Nuclear Regulatory Commission NRR Mail Stop 13-H-3 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Chris Nolan NRR Project Manager Region IV/ANO-2 U. S. Nuclear Regulatory Commission

' NRR Mail Stop 13-H-3 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. David D. Snellings Director, Division ofRadiation Control and Emergency Management Arkansas Department ofHeah'r 4815 West Markham Street

]

Little Rock,~ AR 72205  :

i