Informs That Staff Reviewed Draft Operation Insp Rept for Farley Nuclear Station Cooling Water Pond Dam & Concurs with FERC Findings.Any Significant Changes Made Prior to Issuance of Final Rept Should Be Discussed with NRC
ML20206R474
Person / Time
Site: Arkansas Nuclear, Farley  Southern Nuclear icon.png
Issue date: 05/13/1999
From: Joseph Holonich
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Gotzmer J
FEDERAL ENERGY REGULATORY COMMISSION
References
NUDOCS 9905200134
Download: ML20206R474 (3)


Text

F e

May 13, 1999 Federal Energy Regulatory Commission

)

Atlanta Regional Office ATTN: Mr. Jerrold W. Gotzmer, P.E.

Parkridge 85 North Building 3125 Presidential Parkway - Suite 300 Atlanta, GA 30340

SUBJECT:

FARLEY CATEGORY I COOLING WATER STORAGE POND DAM

Dear Mr. Gotzmer:

The U.S. Nuclear Regulatory Commission (NRC) has received the draft operation inspection report for the Farley Nuclear Station Cooling Water Pond dam. The report was dated April 1,1999.

The draft report states that there is no condition that would present an immediate threat to the safety and permanence of the project structures. Five suggestions were made to improve the maintenance and instrumentation checks for the structures.

NRC staff has reviewed the draft document, and is in agreement with your findings. Prior to issuance of the Final Report, we request that if there are significant changes, Mr. Robert L.

Bryant, P.E., of your office, discuss your findings with us. We would appreciate receiving the final report within 30 days of the date of this letter. If you have any questions regarding this correspondence, please call Mr. Daniel Rom at (301) 415-6704.

Sincerely,

[Signedby]

j Joseph J. Holonich, Deputy Director l

Division of Waste Manag3 ment,

Office of Nuclear Material Safety and Safeguards amamW DISTRIBUTION:

FILE CENTER" PUBLIC NMSS r/f URLL r/f CNWRA j

BSpitzberg/RIV ACNW KStablein DOCUMENT NAME: S:\\DWM\\URLL\\D.S$FARLEYOK.WPD *See previous concurrence Dk h

OFC URL*L NAME DRom:bg JHhh 5/h9 DATE 5/11/99 OFFICIAL RECORD COPY 9905200134 990513 fkh PDR ADOCK 05000348 G

PDR

p3 K&cu g*

44 UNITED STATES g

j NUCLEAR REGULATORY COMMISSION p

t WASHINGTON, D.C. 20666 4001 Y+9... +,o May 13, 1999 Federal Energy Regulatory Commission Atlanta Regional Office ATTN: Mr. Jerrold W. Gotzmer, P.E.

Parkridge 85 North Building 3125 Presidential Parkway - Suite 300 I

Atlanta, GA 30340 4

SUBJECT:

FARLEY CATEGORY I COOLING WATER STORAGE POND DAM

Dear Mr. Gotzmer:

The U.S. Nuclear Regulatory Commission (NRC) has received the draft operation inspection report for the Farley Nuclear Station Cooling Water Pond dam. The report was dated April 1,1999.

The draft report states that there is no condition that would present an immediate threat to the safety and permanence of the project structures. Five suggestions were made to improve the maintenance and instrumentation checks for the structures.

NRC staff has reviewed the obft document, and is in agreement with your findings. Prior to issuance of the Final Report, we request that if there are significant changes, Mr. Robert L.

Bryant, P.E., of your office, discuss your findings with us. We would appreciate receiving the final report within 30 days of the date of this letter. If you have any questions regarding this correspondence, please call Mr. Daniel Rom at (301) 415-6704.

Sincerely, 1

O*** /

w Joseph J. Holonich, Deputy Director Division of Waste Management Office of Nuclear Material Safety and Safeguards 4

Federal Energy Regulatory Commission Atlanta Regional Office ATTN: Mr. Jerrold W. Gotzmer, P.E.

Parkridge 85 North Building 3125 Presidential Parkway - Suite 300 Atlanta, GA 30340

[FARLEY CATEGORY l COOLING WATER STORAGE POND DAM

Dear Mr. Gotzmer:

Our office has received the draft operation inspection report for the Farley Nuclear Station Cooling Water Pond dam. The report was dated April 1,1999.

The draft report states that there is no condition that would pres an immediate threat to the safety and permanence of the project structures. Five sugge ons were made to improve the maintenance and instrumentation checks for the structure NRC staff has reviewed the draft document, and is ' agreement with your findings. Prior to issuance of the Final Report, we request that if t re are significant changes, Mr. Robert L.

Bryant, P.E., of your office, discuss your findi s with us. We would appreciate receivin0 the final report within 30 days of the date of th' letter. If you have any questions regarding this correspondence, please call Mr. Daniel om at (301) 415-6704.

Sincerely, Joseph J. Holonich, Deputy Director Division of Waste Management Office of Nuclear Material Safety and Safeguards DISTRIBUTION: