IR 05000313/1986028
| ML20214N694 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 09/10/1986 |
| From: | Gagliardo J NRC |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| References | |
| 50-313-86-28, NUDOCS 8609160428 | |
| Download: ML20214N694 (1) | |
Text
. _ _.
__ _- ____. _ _ - _ _ _ _
_
SEP 101986 In Reply Refer To:
Dockets: 50-313/86-28 Arkansas Power & Light Company ATTN: Mr. Gene Campbell Vice President, Nuclear Operations P. O. Box 551 Little Rock, Arkansas 72203 Gentlemen:
NRC Inspection 50-313/86-28 has'been cancelled; therefore, no inspection report will be issued for this report number.
Sincerely, OriC!ns! S!sned Dy J. E. GegHardo J. E. Gagliardo, Chief Reactor Projects Branch cc:
J. M. Levine,' Director
. Site Nuclear Operations Arkansas Nuclear One P. O. Box 608 Russellville, Arkansas ~ 72801 Arkansas Radiation. Control P'rogram Director bec to DHB (IE01)
bec distrib. by RIV:
RPB Resident Inspector R. D. Martin, RA R&SPB SectionChief(RPB/B)-
D. Weiss,LFMB(AR-2015)
RIV File DRSP RSB MIS SYSTEM RSTS Operator C:RP C:RP DRifurmer:cs JEGag ardo D
86 9/g/,
8609160428 860910 PDR ADOCK 05000313 G
PDR (
.
..
__
___ ____ ___
_
_