IR 05000313/1990016
| ML20059D608 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 08/29/1990 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Carns N ENTERGY OPERATIONS, INC. |
| References | |
| NUDOCS 9009070118 | |
| Download: ML20059D608 (3) | |
Text
~^
a
- * ' ' '
-
g gg y
.
..
-In Reply Refer To:
. Dockets: 50-313/90-16 50-368/90-16 L
Entergy Operations, Inc.
ATTN: Neil S. Carns, Vice President Operations, Arkansas Nuclear One P.O. Box 551 Little Rock, Arkansas 72203 Gentlemen:-
This refers to the meeting and discussion held August 23, 1990, between your
Messrs. W. Perks, R. Y,ing, and A. Jacobs and our Messrs. J. Jaudon and
<
T. Westerme concer ing inc unresolved item related to missed surveillance n
tests (313/9016-01; 368/9016-01).
,
As a rr.sult of this. discussion, we concluded that a violation of the Technical Specification requirements to conduct various surveillance tests had occurred; there vere multiple examples of the violation. However, in accordance with Section V,G.1 of the NRC's Enforcement Policy, no citation is being issued because w have determined that:
o The instances of missed surveillance tests were identified by the licensee.
o The violatlun examples cal. be classified at Severity Lu el IV, o;
The licensee reported the violation examples by licensee event reports as required by regulations.
o.
-The violation and the conditions that caused the surveillant.; tests to be missed have been corrected, and these corrective actions have been i
effective in preventing recurrences. -
l
'
o The violation was not willful, and the examples occurred during a time l
period before the corrective actions were in place.
For record purposes, the unresolved item listed above is closed by the notification of this noncited violation-described herein.
I r
{
b
'
RIV:D:DRS C:PSA:DRP C:TPS:DRS D2DRS
l JPJaudon/lb TFWesterman WCSeidle
'2/,llan
- JC llips l
JC l
9/J/90 g/p/90 t /N/90
/90
MN
,I Eo
,
A
,
_ _,., _0313 PDR ADOCK 0500 G
PNV
>
. *.
.-
Entergy Operations, Inc.
-2-Should you have any questions concerning this letter,-we shall be pleased to discuss them with you.
Sincerely,
@d Synod By:
Samuel J. Colk Semuel J. Collins, Director Division of Reactor Projects cc:
Entergy Operations, Inc.
ATTN: Donald C. Hintz, Executive Vice
. President & Chief Operating Officer P.O. Box 31995 Jackson, Mississippi 39286 Entergy Operations, Inc.
,
ATTN: Gerald W. Muenth, Vice President Operations Support P.O. Box 31995 Jackson, Mississippi 39286 Wise. Carter, Child & Caraway l
ATTH: Robert B. ilcGehee, Esq.
P.O. Box 651:
- r Jackson, Mississippi 39205 Arkansas Nuclear One ATTN:
Early Ewing, General Manager Technical Support and Assessment Route 3, Box'137G Russellville. Arkansas 72801 Arkansas Nuclear One ATTN: Jerry Yelverton, Director Nuclear Operations
.
Route 3, Box 137G Russellville, Arkansas 72801
.
Arkansas Nuclear One
ATTN: Mr. Tom W. Nickels
Route 3, Box 137G Russellville, Arkansas 72801 Combustion Engineering, Inc.
ATIN: Charles B. Brinkman, Manager Washington Nuclear Operations 12300 Twinbrook Parkwey. Suite 330 Rockville, Maryland 20852
4 i
.
1.
.
- i' ;
-. -
..
Entergy Operation, Inc.
-3-t Honoraole Joe W. Phillips County. Judge of Pope County Popo County Courthouse Russellville, Arkansas 72801 Bishop. Cook, Purcell & Reynolds ATTN: Nicholas S. Reynolds Esq.
,
1400 L Street, N.W.
Washington, D.C.
20005-3502-l Arkansas Department of Health ATTN: Ms. Greta Dicus, Director-Division of Environmental Health Protection 4815 West Markam Street Little Rock, Arkansas 72201 Babcock & Wilcox Nuclear Power Generation Division ATTN: Mr. Robert B. Borsum 1700 Rockville Pike, Suite 525 Rockville, Maryland 20852 U.S. Nuclear Regulatory Commission ATTH: Senior Resident Inspector 1 Nuclear Plant Road Russellville, Arkansas 72801 U.S. Nuclear Regulatory Connission ATTN: Regional Administrator, Region IV c.
611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 bec to DMB (IE01)
bec distrib. by RIV:
R. D. Martin Resident Inspector DRSS-FRPS
.SectionChief(DRP/A)
,
Lisa Shea, RM/ALF
.RIV File'
~
DRP MIS System RSTS Operator ProjectEngineer(DRP/A)#
.DRS
,J. P. Jaudon
. T. F. Westerman J.~P. Jaudon Reading. File T. Alexion, NRR Project Manager (MS:
13-E-21)
C. Poslusny, NRR Project Manager (MS:
13-D-18)
.7 J. Gagliardo B. Cummins H. Bundy W. Seidle
'
G; Sanborn
-,