j Jll i7 E00 In Peply Refer To:
L' '
'Dociets: 50-313
{
50-368 L
Entergy Operations, Inc.
- ATTN: Neil S. Carns, Vice President
-Nuclear,. Arkansas Nuclear One Route 3, Box'137G-t Russellville, Arkansas 72801 Gentlemen:-
This is to confirm arrangement's made with you during our-telephone conversation on July 10,;1990, for a management meeting in the Region IV office on July 18,199'), at 1 p.m.
The purpose of the meeting is to discuss the exercise weaknesses identified
.during the March 1990 emergency exercise at Arkansas Nuclear One (ANO), We understand that your staff will discuss:
- 1) root causes for each of..
12 weaknesses, 2) corrective measures and the associated schedules, and
- 3) internal assessment of emergency preparedness program at ANO.
Should-you have any. questions concerning these arrangements, we will be pleased to discuss them with you.
Sincerely, Original Signed By
~!
9AG Samuel J. Collins, Director Division of Reactor Frojects
Enclosure:
i
. Proposed Agenda cc w/ enclosure:
Entergy Operations, Inc.
ATTN: Donald C. Hintz, Executive l'
Vice President M
P.O. Box 31995
'i Jackson,-Mississippi 39286 I
w.
1,,
lc RIV:SEPS C:SEPSg 5
- DRP L:
"NTerc/ sir DPowers Ele h SCollins
/ /90 7 /a/90 7 /tc/90 7 //1/90
- Previously concurred, m
g2mm m%e "
ng F
-)
n i
- .j!
j R
.a Entergy Operations, Inc. '
m 4
Entergy Operations, Inc.
i E
ATTN: Gerald W. Muench, Vice President
'j Operations Support
' P.O. Box 31995
- )
Jackson, Mississippi 39286 4
Wise, Carter, Child & Caraway-I ATTN:
Robert B. McGehee, Esq.
P.O' Box 651
~
3 Jackson,-Mississippi 39205
- Arkansas Nuclear One ATTN:
Early Ewing, General Manager Technical Support and Assessment 3
- P.O.. Box 608-t Russellville, Arkansas 72801
. Arkansas Nuclear One j
ATTN:: Jerry Yelverton, Director Nuclear Operations Route 3, Box 137G Russellville, Arkansas 72801 i
H Arkansas Nuclear One ATTN: Mr. Tom W. Nickels H
Route 3, Box 137G p
Russellville, Arkansas-72801
.i Combustion Engineering, Inc.
S'
- ATTN: Charles B. Brinkman, Manager Washington Nuclear Operations 12300 Twinbrook Parkway, Suite 330 a
Rockville,-Maryland 20852 h
- Honorable Joe W. Phillips-County' Judge of Pope County
/a.
Pope County Courthouse l
Russellville, Arkansas '72801-b' l,<
. Bishop, Cook, Purcell & Reynolds
?.
~'
' 1400 L Street, N.W.
ATTN:
Nicholas S. Reynolds, Esq.
t o
P' fJ, Washington, D.C.
20005-3502 g
L Arkansas Department of Health H
- ATTN: Ms. Greta Dieus, Director Oivision of Environmental Health 1
Protection L
4815 West Markam Street
. Little Rock, Arkansas 72201 11 0
i p.
,p, 1
j(
i o
s. _:
)
~
b.
4
?
Entergy Operations, Inc.- '
Babcock & Wilcox j
Nuclear Power Generation Division ATTN: Mr. Robert B. Borsum i
,1700 Rockville Pike, Suite 525
' Rockville, Maryland 20852-
- U.S.-Nuclear Regulatory Commission 1
ATTN: Senior Resident Inspector R
L1 Nuclear Plant Road
-Russellville, Arkansas 72801 U.S. Nuclear Regulatory Commission J--
ATTN:. Regional Administrator, Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chief, Technological Hazards Branch FEMA Region 6
{
Federal Center 800 North Loop 288 Denton, Texas 76201-3698 1
bec to DMB (IE45)
?
h' bcC:
1 Resident Inspector i
^SEPS/FRPS File Section Chief, SEPS, DRP/A
~Lisa Shea',- RM/ALF-RIV. File L
RSTS Operator Inspector g?
Section Chief, SEPS L
B. Beach l
s..
Project ~ Engineer, DRP/A T. Alexion, NRR Project Manager 2
f
.C. Posiusny, NRR Project Manager o
l?
4
re-
~
l-r?.;
f PROPOSED AGENDA i
Enteroy Operations, Inc. Meeting with NRC July 18, 1990, at 1 p.m.
l I.
INTRODUCTION Samuel J. Collins t
I I '. - PURPOSE OF THE MEETING A. Bill Beach i
III. 1990 EMERGENCY EXERCISE WEAKNESSES Licensee Staff i
IV. DISCUSSION NRC Staff V.
. INTERNAL ASSESSMENT OF EMERGENCY ~ PREPARE 0 NESS
' PROGRAM' Licensee Staff a
VI. DISCUSSION NRC Staff VII. CLOSING COMMENTS Samuel J. Collins
[