                                                                        MAY 2 31986
        Docket No. 50-293
        Boston Edison Company M/C Nuclear
        ATTN: Mr. William D. Harrington
                            Senior Vice President, Nuclear
        800 Boylston Street
,
        Boston, Massachusetts 02199
        Gentlemen:
        Subject:                Inspection Report No. 50-293/86-16
        A routine radiological safety inspection was conducted by R. L. Nimitz on
        April 14-17, 1986 of your Pilgrim Nuclear Power Station. The findings of the
        inspection were discussed with Mr. C. J. Mai.his and other members of your
        staff.
        The inspection covered previous findings, the Radiological Improvement Plan,-
,
'
        radiological controls for the unplanned outage, a review of the adequacy of
        your response to the post-accident sampling and analysis inspection, and plant
        radiation exposure summaries.
        No violations were identified. However, deficiencies were identified in the
        area of high radiation area access control. THe deficiencies are described in
        the enclosed report and involve less than adequate procedure guidance for
        access to and control of such areas. Additional attention to this area is
        needed.                A weakness was also identified in the area of maintenance of
        emergency breathing apparatus qualifications for reactor operations personnel.
        Your staff has initiated action to review and address these matters.
        No reply to this letter is required.                                              Your cooperation with us in these
        matters is appreciated.
                                                                                        Sincerely,
                                                                                          Ori31cci sigaca gy,
                                                                                          - m
                                                                                                                  .
                                                                                                                          Nbf
                                                                                                          T. Martin, Director
                                                                                          ivision of Radiation Safety
                                                                                            and Safeguards
        Enclosure: NRC Region I Inspection Report No. 50-293/86-16
                                                          0FFICIAL RECORD COPY
            8605300321 860523
                              ADOCK 0                    3                                                                        y ig
.
          3  - - . , ,          , - . , _ , - - - - , --    - - - , - _ - - - - - - , , -  _m - - . - -      -            - --
 
  *
.    .
    ,
~
    .    Boston Edison                            2
            Company M/C Nuclear
          cc w/ encl:
          L. Oxsen, Vice President, Nuclear Operations
          C. J. Mathis, Station Manager
          Joanne Shotwell, Assistant Attorney General
          Paul Levy, Chairman, Department of Public Utilities
          W. J. Nolan, Chairman, Plymouth Board of Selectmen
          Plymouth Civil Defense Director
          Senator Edward P. Kirby
          Public Document Room (PDR)
          local Public Document Room (LPDR)
          Nuclear Safety Information Center (NSIC)
          NRC Resident Inspector
          Commonwealth of Massachusetts (2)
          bec w/ encl:
          Region I Docket Room (with concurrences)
          Management Assistant, DRMA (w/o encl) Section Chief, DRP
          W. Raymond, SRI, Vermont Yankee
          T. Shedlosky, SRI, Millstone 1&2
          H. Eichenholz, SRI, Yankee
          P. Leech, LPM, NRR
          DRSS:RI          DRSS:RI        DRSS:RI
          Nimitz/pj        Shanba y      Bellamy
          5                5/zt/86        5///86
        (, y/J/f86y1 g
        0                          0FFICIAL RECORD COPY    IR PILGRIM 86-16 - 0002.0.0
                                                            05/21/86
                                                                                    - - _ - . _ - _ _ _ -
}}
}}

Latest revision as of 22:10, 16 December 2020

Forwards Radiological Safety Insp Rept 50-293/86-16 on 860414-17.No Violation Noted.Deficiencies Identified in Area of High Radiation Access Control.Weakness Noted Re Emergency Breathing Apparatus
ML20195C430
Person / Time
Site: Pilgrim
Issue date: 05/23/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20195C432 List:
References
NUDOCS 8605300321
Download: ML20195C430 (2)


See also: IR 05000293/1986016

Text

. _ . . _ - .- _

( .

.

  • .

.

MAY 2 31986

Docket No. 50-293

Boston Edison Company M/C Nuclear

ATTN: Mr. William D. Harrington

Senior Vice President, Nuclear

800 Boylston Street

,

Boston, Massachusetts 02199

Gentlemen:

Subject: Inspection Report No. 50-293/86-16

A routine radiological safety inspection was conducted by R. L. Nimitz on

April 14-17, 1986 of your Pilgrim Nuclear Power Station. The findings of the

inspection were discussed with Mr. C. J. Mai.his and other members of your

staff.

The inspection covered previous findings, the Radiological Improvement Plan,-

,

'

radiological controls for the unplanned outage, a review of the adequacy of

your response to the post-accident sampling and analysis inspection, and plant

radiation exposure summaries.

No violations were identified. However, deficiencies were identified in the

area of high radiation area access control. THe deficiencies are described in

the enclosed report and involve less than adequate procedure guidance for

access to and control of such areas. Additional attention to this area is

needed. A weakness was also identified in the area of maintenance of

emergency breathing apparatus qualifications for reactor operations personnel.

Your staff has initiated action to review and address these matters.

No reply to this letter is required. Your cooperation with us in these

matters is appreciated.

Sincerely,

Ori31cci sigaca gy,

- m

.

Nbf

T. Martin, Director

ivision of Radiation Safety

and Safeguards

Enclosure: NRC Region I Inspection Report No. 50-293/86-16

0FFICIAL RECORD COPY

8605300321 860523

ADOCK 0 3 y ig

.

3 - - . , , , - . , _ , - - - - , -- - - - , - _ - - - - - - , , - _m - - . - - - - --

. .

,

~

. Boston Edison 2

Company M/C Nuclear

cc w/ encl:

L. Oxsen, Vice President, Nuclear Operations

C. J. Mathis, Station Manager

Joanne Shotwell, Assistant Attorney General

Paul Levy, Chairman, Department of Public Utilities

W. J. Nolan, Chairman, Plymouth Board of Selectmen

Plymouth Civil Defense Director

Senator Edward P. Kirby

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl) Section Chief, DRP

W. Raymond, SRI, Vermont Yankee

T. Shedlosky, SRI, Millstone 1&2

H. Eichenholz, SRI, Yankee

P. Leech, LPM, NRR

DRSS:RI DRSS:RI DRSS:RI

Nimitz/pj Shanba y Bellamy

5 5/zt/86 5///86

(, y/J/f86y1 g

0 0FFICIAL RECORD COPY IR PILGRIM 86-16 - 0002.0.0