ML20195C430
| ML20195C430 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 05/23/1986 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Harrington W BOSTON EDISON CO. |
| Shared Package | |
| ML20195C432 | List: |
| References | |
| NUDOCS 8605300321 | |
| Download: ML20195C430 (2) | |
See also: IR 05000293/1986016
Text
. _ .
. _ -
.-
_
(
.
.
.
.
MAY 2 31986
Docket No. 50-293
Boston Edison Company M/C Nuclear
ATTN: Mr. William D. Harrington
Senior Vice President, Nuclear
800 Boylston Street
Boston, Massachusetts 02199
,
Gentlemen:
Subject:
Inspection Report No. 50-293/86-16
A routine radiological safety inspection was conducted by R. L. Nimitz on
April 14-17, 1986 of your Pilgrim Nuclear Power Station.
The findings of the
inspection were discussed with Mr. C. J. Mai.his and other members of your
staff.
The inspection covered previous findings, the Radiological Improvement Plan,-
radiological controls for the unplanned outage, a review of the adequacy of
,
'
your response to the post-accident sampling and analysis inspection, and plant
radiation exposure summaries.
No violations were identified.
However, deficiencies were identified in the
area of high radiation area access control. THe deficiencies are described in
the enclosed report and involve less than adequate procedure guidance for
access to and control of such areas.
Additional attention to this area is
needed.
A weakness was also identified in the area of maintenance of
emergency breathing apparatus qualifications for reactor operations personnel.
Your staff has initiated action to review and address these matters.
No reply to this letter is required.
Your cooperation with us in these
matters is appreciated.
Sincerely,
Ori31cci sigaca gy,
Nbf
.
- m
T. Martin, Director
ivision of Radiation Safety
and Safeguards
Enclosure: NRC Region I Inspection Report No. 50-293/86-16
0FFICIAL RECORD COPY
8605300321 860523
ADOCK 0
3
y
ig
.
3
- - . , ,
, - . , _ , - - - - ,
--
- - - , - _
- - - - - - , , -
m
- - . - -
-
- --
.
.
,
~
Boston Edison
2
.
Company M/C Nuclear
cc w/ encl:
L. Oxsen, Vice President, Nuclear Operations
C. J. Mathis, Station Manager
Joanne Shotwell, Assistant Attorney General
Paul Levy, Chairman, Department of Public Utilities
W. J. Nolan, Chairman, Plymouth Board of Selectmen
Plymouth Civil Defense Director
Senator Edward P. Kirby
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Massachusetts (2)
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl) Section Chief, DRP
W. Raymond, SRI, Vermont Yankee
T. Shedlosky, SRI, Millstone 1&2
H. Eichenholz, SRI, Yankee
P. Leech, LPM, NRR
DRSS:RI
DRSS:RI
DRSS:RI
Nimitz/pj
Shanba y
Bellamy
(, y/J/f86y1 g
5
5/zt/86
5///86
0
0FFICIAL RECORD COPY
IR PILGRIM 86-16 - 0002.0.0
05/21/86
- -
- .
-
-