ML20134P297: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 26: Line 26:


==Dear Mr. Farrar:==
==Dear Mr. Farrar:==
CMiles                RBallard JNorton          KRidgway FMaura The Comission has issued the enclosed Amendment No. 90 to Facility Operating License No. DPR-39 and Amendment No. 80 to Facility Operating License No. DPR-48 for the Zion Nuclear Power Station, Unit Nos.1 and 2, respectively. The amendments consist of changes to the Technical Specifications in response to your application transmitted by letter dated January 30, 1985; supplemented July 8, 1985.
CMiles                RBallard JNorton          KRidgway FMaura The Comission has issued the enclosed Amendment No. 90 to Facility Operating License No. DPR-39 and Amendment No. 80 to Facility Operating License No. DPR-48 for the Zion Nuclear Power Station, Unit Nos.1 and 2, respectively. The amendments consist of changes to the Technical Specifications in response to your application transmitted by {{letter dated|date=January 30, 1985|text=letter dated January 30, 1985}}; supplemented July 8, 1985.
These amendments would: (a) Pennit full pressure testing of the contair, ment in accordance with 10 CFR 50, Appendix J as requested by NRC-Region III; (b) add containment air lock testing; (c) reduce the number of tendons to be included in surveillance requirements in accordance with Regulatory Guide 1.35, Revision 2; and (d) remove obsolete containment liner surveillance requirements.
These amendments would: (a) Pennit full pressure testing of the contair, ment in accordance with 10 CFR 50, Appendix J as requested by NRC-Region III; (b) add containment air lock testing; (c) reduce the number of tendons to be included in surveillance requirements in accordance with Regulatory Guide 1.35, Revision 2; and (d) remove obsolete containment liner surveillance requirements.
4 A copy of the related Safety Evaluation is enclosed. A Notice of Issuance will be included in the Comission's next regular bi-weekly Federal Register notice.
4 A copy of the related Safety Evaluation is enclosed. A Notice of Issuance will be included in the Comission's next regular bi-weekly Federal Register notice.

Latest revision as of 09:11, 14 December 2021

Forwards Amends 90 & 80 to Licenses DPR-39 & DPR-48, Respectively & Safety Evaluation.Amends Change Tech Specs to Permit Full Pressure Testing of Containment & to Add Containment Air Lock Testing
ML20134P297
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 08/27/1985
From: Norris J
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
Shared Package
ML20134P299 List:
References
RTR-REGGD-01.035, RTR-REGGD-1.035 NUDOCS 8509060233
Download: ML20134P297 (2)


Text

. -- _. . -

o .

Docket Nos. 50-295 DISTRIBUTION and 50-304 August 27, 1985 'Doctet M ie NRC PDR

, L' PDR~ ORB #1 Rdg Gray File 4 HThompson Mr. D. L.~ Farrar JNorris CParrish Director of Nuclear Licensing OELD LHarmon Comonwealth Edison Company EJordan BGrimes Post Office Box 767 JPartlow TBarnhart 8

+

Chicago, Illinois 60690 WJones MVirgilio ACRS 10 RDiggs

Dear Mr. Farrar:

CMiles RBallard JNorton KRidgway FMaura The Comission has issued the enclosed Amendment No. 90 to Facility Operating License No. DPR-39 and Amendment No. 80 to Facility Operating License No. DPR-48 for the Zion Nuclear Power Station, Unit Nos.1 and 2, respectively. The amendments consist of changes to the Technical Specifications in response to your application transmitted by letter dated January 30, 1985; supplemented July 8, 1985.

These amendments would: (a) Pennit full pressure testing of the contair, ment in accordance with 10 CFR 50, Appendix J as requested by NRC-Region III; (b) add containment air lock testing; (c) reduce the number of tendons to be included in surveillance requirements in accordance with Regulatory Guide 1.35, Revision 2; and (d) remove obsolete containment liner surveillance requirements.

4 A copy of the related Safety Evaluation is enclosed. A Notice of Issuance will be included in the Comission's next regular bi-weekly Federal Register notice.

Sincerely,

/s/JNorris Jan Norris, Prcject Manager Operating Reactors Branch #1 Division of Licensing

Enclosures:

1. Amendment No. 90 to DPR-39 l 2. Amendment No. 80 to DPR-48 l 3. Safety Evaluation cc: w/ enclosures See next page g ef ORB #1:DL 0B :DL BC N18ft':DL OELD ADpt:DL CParrish DNor u s;ps SV :ga J. A w< G' inas 8AT85 ' 8/g85'  % 85 849/85 I 8{ 85

$5 [95 PDR

Mr. D. L. Farrar Commonwealth Edison Company Zion Station ,

cc:

Robert J. Vollen, Esquire The Honorable John E. Grotberg 109 North Dearborn Street United States House of Chicago, Illinois 60602 Representatives Washington, D.C. 20515 Dr. Cecil Lue-Hing Director of Research and Development Mr. Michael C. Parker, Chief Metropolitan Sanitary District ,

Division of Engineering of Greater Chicago Illinois Department of Nuclear 100 East Erie Street Safety Chicago, Illinois 60611 1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 Mr. Phillip P. Steptoe Isham, Lincoln and Beale Counselors at Law Three First National Plaza Sist Floor Chicago, Illinois 60602

.~

Susan N. Sekuler, Esquire Assistant Attorney General Environmental Control Division 188 West Randolph Street, Suite 2315 Chicago, Illinois 60601

- Mayor of Zion Zion, Illinois 60099 Illinois Department of Nuclear Safety ATTN: Manager, Nuclear Facility Safety 1035 Outer Park Drive 5th Floor Springfield, Illinois 62704 U.S. Nuclear Regulatory Commission Resident Inspectors Office 105 Shiloh Blvd.

Zion, Illinois 60099 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

_ _ _ _ _ .