| | Site | Start date | Title |
|---|
| 05000461/LER-2016-002, Regarding Trip of Fuel Building Ventilation Exhaust Fan Due to Moisture Formation Resulting in the Loss of Secondary Containment Vacuum | Clinton | 13 April 2016 | Regarding Trip of Fuel Building Ventilation Exhaust Fan Due to Moisture Formation Resulting in the Loss of Secondary Containment Vacuum |
| 05000295/LER-2011-001, From Zion, Units 1 & 2 Improper Storage of Fuel Rod Storage Canister in Spent Fuel Pool | Zion | 6 September 2011 | From Zion, Units 1 & 2 Improper Storage of Fuel Rod Storage Canister in Spent Fuel Pool |
| 05000461/LER-2003-002, From Clinton, Unit 1 Regarding Manual Reactor Scram Due to Main Turbine Vibrations Caused by Deficient Procedure Guidance | Clinton | 9 June 2003 | From Clinton, Unit 1 Regarding Manual Reactor Scram Due to Main Turbine Vibrations Caused by Deficient Procedure Guidance |
| 05000454/LER-2003-001, Regarding Control Room Ventilation System Alignment Results in Inoperable Radiation Monitors Without Taking Required Actions Put Technical Specifications | Byron | 23 May 2003 | Regarding Control Room Ventilation System Alignment Results in Inoperable Radiation Monitors Without Taking Required Actions Put Technical Specifications |
| 05000461/LER-2003-001, Human Performance Errors Result in Inoperable Containment Isolation Valve & Failure to Isolate Penetration within 4 Hours | Clinton | 16 April 2003 | Human Performance Errors Result in Inoperable Containment Isolation Valve & Failure to Isolate Penetration within 4 Hours |
| 05000454/LER-2002-001-01, For Byron Unit 1 Multiple Main Steam Safety Valve Relief Tests Exceeded Required Tolerance Due to Disk to Nozzle Metallic Bonding and Setpoint Drift | Byron | 15 November 2002 | For Byron Unit 1 Multiple Main Steam Safety Valve Relief Tests Exceeded Required Tolerance Due to Disk to Nozzle Metallic Bonding and Setpoint Drift |
| 05000461/LER-2002-003, Re Manufacturing Process Deficiency in Main Power Transformer Sudden Pressure Relay Causes False Actuation of Relay Resulting in Generator & Turbine Trip & Reactor Scram | Clinton | 28 August 2002 | Re Manufacturing Process Deficiency in Main Power Transformer Sudden Pressure Relay Causes False Actuation of Relay Resulting in Generator & Turbine Trip & Reactor Scram |
| 05000461/LER-2002-002, Inadequate Preventive Maintenance Program for the Feedwater System Results in Lockup of a Turbine-Driven Reactor Feed Pump and Scram on High Reactor Pressure Vessel Water Level During Extended Power Uprate Testing | Clinton | 11 July 2002 | Inadequate Preventive Maintenance Program for the Feedwater System Results in Lockup of a Turbine-Driven Reactor Feed Pump and Scram on High Reactor Pressure Vessel Water Level During Extended Power Uprate Testing |
| 05000454/LER-2002-002, Re Two or Three Pressurizer Safety Valve Relief Tests Exceeded Required Tolerance Due to Setpoint Drift | Byron | 16 May 2002 | Re Two or Three Pressurizer Safety Valve Relief Tests Exceeded Required Tolerance Due to Setpoint Drift |
| 05000461/LER-1999-010-01, Inoperability of Div 2 EDG Caused by Fuel Leaking Into Lube Oil, Cancelled | Clinton | 7 October 1999 | Inoperability of Div 2 EDG Caused by Fuel Leaking Into Lube Oil, Cancelled |
| 05000461/LER-1998-020-01, Forwards LER 98-020-01, Inadequate Flow Balancing of Shutdown SWS Results in Less than Required Flow to SWS Loads. Revised LER Provides Cause of Event & Corrective Actions | Clinton | 14 September 1999 | Forwards LER 98-020-01, Inadequate Flow Balancing of Shutdown SWS Results in Less than Required Flow to SWS Loads. Revised LER Provides Cause of Event & Corrective Actions |
| 05000461/LER-1999-010, :on 990809,declared Div 2 EDG Inoperable Due to Fuel Leaking Into Lube Oil.Replaced Fuel Return Line from Engine Number 12 Cylinder on Div 2 Edg.With | Clinton | 8 September 1999 |
- on 990809,declared Div 2 EDG Inoperable Due to Fuel Leaking Into Lube Oil.Replaced Fuel Return Line from Engine Number 12 Cylinder on Div 2 Edg.With
|
| 05000461/LER-1999-009, :on 990617,failure to Satisfy Secondary Containment Bypass Leakage Rate TS Was Noted.Caused by Failure to Properly Classify Containment Penetrations. Procedures Revised.With | Clinton | 15 July 1999 |
- on 990617,failure to Satisfy Secondary Containment Bypass Leakage Rate TS Was Noted.Caused by Failure to Properly Classify Containment Penetrations. Procedures Revised.With
|
| 05000461/LER-1999-006, :on 990419,values Used for Containment & Drywell Free Vols Found to Be Smaller than Originally Analyzed Due to Inadequate Calculation Control During Initial Plant Const.With 9905517 Ltr | Clinton | 17 May 1999 |
- on 990419,values Used for Containment & Drywell Free Vols Found to Be Smaller than Originally Analyzed Due to Inadequate Calculation Control During Initial Plant Const.With 9905517 Ltr
|
| 05000461/LER-1998-030-01, Insufficient Suppression Pool Makeup Volume to Meet Design Basis Suppression Pool Level Requirements Following LOCA, Has Been Cancelled | Clinton | 19 April 1999 | Insufficient Suppression Pool Makeup Volume to Meet Design Basis Suppression Pool Level Requirements Following LOCA, Has Been Cancelled |
| 05000461/LER-1998-013-01, Forwards LER 98-013-01, Remote Shutdown Panel Operation of Rcics May Be Prevented Following MCR Fire,Due to Supplier Design Lacking Circuit Isolation & 10CFR21 Rept Number 21-98-026.Without Part 21 Rept | Clinton | 13 April 1999 | Forwards LER 98-013-01, Remote Shutdown Panel Operation of Rcics May Be Prevented Following MCR Fire,Due to Supplier Design Lacking Circuit Isolation & 10CFR21 Rept Number 21-98-026.Without Part 21 Rept |
| 05000461/LER-1998-024-01, Forwards LER 98-024-01,re Failure to Perform Surveillance Testing on Div II 4.16 Kv Bus Uvr within Specified Frequency.Commitments Listed | Clinton | 19 October 1998 | Forwards LER 98-024-01,re Failure to Perform Surveillance Testing on Div II 4.16 Kv Bus Uvr within Specified Frequency.Commitments Listed |
| 05000295/LER-1997-022-01, Forwards LER 97-022-01,IAW 10CFR50.73(a)(2)(v).Commitments Made within Ltr,Encl | Zion | 28 August 1998 | Forwards LER 97-022-01,IAW 10CFR50.73(a)(2)(v).Commitments Made within Ltr,Encl |
| 05000304/LER-1998-002, Forwards LER 98-002-00 IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Encl | Zion | 8 May 1998 | Forwards LER 98-002-00 IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Encl |
| 05000295/LER-1997-018-01, Forwards LER 97-018-01,which Clarifies Info on Event Description,Root Causes & Safety Analysis.Corrective Actions Have Also Been Updated.Commitments Made within Ltr,Encl | Zion | 10 April 1998 | Forwards LER 97-018-01,which Clarifies Info on Event Description,Root Causes & Safety Analysis.Corrective Actions Have Also Been Updated.Commitments Made within Ltr,Encl |
| 05000461/LER-1998-008, Forwards LER 98-008-00,re Division I Hydrogen & Oxygen Analyzer Incapable of Meeting Design Basis Due to an Excessive Vibration Condition on Air Compressor.Caused by Personnel Error.Commitments Made within Ltr,Listed | Clinton | 8 April 1998 | Forwards LER 98-008-00,re Division I Hydrogen & Oxygen Analyzer Incapable of Meeting Design Basis Due to an Excessive Vibration Condition on Air Compressor.Caused by Personnel Error.Commitments Made within Ltr,Listed |
| 05000461/LER-1997-023-01, Inadequate Work Instructions Leads to Potential Over-Greasing of Motor Bearings Causing Potential Failure of Various Motors Has Been Canceled | Clinton | 31 March 1998 | Inadequate Work Instructions Leads to Potential Over-Greasing of Motor Bearings Causing Potential Failure of Various Motors Has Been Canceled |
| 05000461/LER-1997-035-01, Forwards LER 97-035-01,re Divisions 1 & 2 Battery Chargers Incapable of Supplying Full Rated Voltage & Current Flow at Degraded Voltage Trip Setpoint IAW Plant TS & Design Basis.Commitments Made within Ltr,Listed | Clinton | 19 March 1998 | Forwards LER 97-035-01,re Divisions 1 & 2 Battery Chargers Incapable of Supplying Full Rated Voltage & Current Flow at Degraded Voltage Trip Setpoint IAW Plant TS & Design Basis.Commitments Made within Ltr,Listed |
| 05000295/LER-1994-005-01, Forwards LER 94-005-01 Per 10CFR50.73(a)(2)(iv),which Requires 30 Day Written Rept When Any Event or Condition Resulted in Manual or Automatic Actuation of Any ESF, Including Rps.Commitments,Encl | Zion | 16 January 1998 | Forwards LER 94-005-01 Per 10CFR50.73(a)(2)(iv),which Requires 30 Day Written Rept When Any Event or Condition Resulted in Manual or Automatic Actuation of Any ESF, Including Rps.Commitments,Encl |
| 05000295/LER-1997-026, Forwards LER 97-026-00,per 10CFR50.73(a)(2)(i)(B) Which Requires 30-day Written Rept.Commitments Associated W/Correspondence,Encl | Zion | 8 January 1998 | Forwards LER 97-026-00,per 10CFR50.73(a)(2)(i)(B) Which Requires 30-day Written Rept.Commitments Associated W/Correspondence,Encl |
| 05000304/LER-1997-008, Forwards LER 97-008-00 Per 10CFR50.73(a)(2)(i)(B),which Requires 30 Day Written Rept.Attachment a Provides Commitments Associated W/Correspondence | Zion | 22 December 1997 | Forwards LER 97-008-00 Per 10CFR50.73(a)(2)(i)(B),which Requires 30 Day Written Rept.Attachment a Provides Commitments Associated W/Correspondence |
| 05000295/LER-1997-025, Forwards LER 97-025-00,re Event Which Occurred at Zion Nuclear Power Station.Commitments Made within Ltr Aslo Encl | Zion | 19 December 1997 | Forwards LER 97-025-00,re Event Which Occurred at Zion Nuclear Power Station.Commitments Made within Ltr Aslo Encl |
| 05000304/LER-1997-007, Forwards LER 97-007-00 Per 10CFR50.73(a)(2)(v)(B) Which Requires Written Rept for Any Event or Condition That Could Prevent Fulfillment of Safety Function of Structures or Sys Needed to Remove Residual Heat.W/Commitments Attach | Zion | 1 December 1997 | Forwards LER 97-007-00 Per 10CFR50.73(a)(2)(v)(B) Which Requires Written Rept for Any Event or Condition That Could Prevent Fulfillment of Safety Function of Structures or Sys Needed to Remove Residual Heat.W/Commitments Attached |
| 05000304/LER-1997-005, Forwards LER 97-005-00 Which Documents Event That Occurred at Zion Nuclear Power Station,Unit 2.Commitment Made within Ltr,Encl | Zion | 21 November 1997 | Forwards LER 97-005-00 Which Documents Event That Occurred at Zion Nuclear Power Station,Unit 2.Commitment Made within Ltr,Encl |
| 05000304/LER-1997-004, Forwards LER 97-004-00,per 10CFR50.73(a)(2)(i).Commitments Associated W/Correspondence,Encl | Zion | 14 November 1997 | Forwards LER 97-004-00,per 10CFR50.73(a)(2)(i).Commitments Associated W/Correspondence,Encl |
| 05000295/LER-1997-001-01, Forwards LER 97-001-01,which Clarifies Info on Root Cause,Safety Analysis & Event Description.Corrective Actions Updated to Show Status of Items | Zion | 14 November 1997 | Forwards LER 97-001-01,which Clarifies Info on Root Cause,Safety Analysis & Event Description.Corrective Actions Updated to Show Status of Items |
| 05000461/LER-1997-022-01, Forwards LER 97-022-01 & 10CFR21 Rept 21-97-036 Re Design of DG Ventilation Subsystems Outside Design Basis as Result of Failure to Include Min & Max Outside Air Temps Extremes,Due to Design Error.Ler Contains Listed Commitm | Clinton | 13 November 1997 | Forwards LER 97-022-01 & 10CFR21 Rept 21-97-036 Re Design of DG Ventilation Subsystems Outside Design Basis as Result of Failure to Include Min & Max Outside Air Temps Extremes,Due to Design Error.Ler Contains Listed Commitments |
| 05000304/LER-1997-003, Forwards LER 97-003-00 Re Unit 2 RHR Sys Declared Inoperable,Per 10CFR50.73(a)(2)(v)(B) | Zion | 13 November 1997 | Forwards LER 97-003-00 Re Unit 2 RHR Sys Declared Inoperable,Per 10CFR50.73(a)(2)(v)(B) |
| 05000304/LER-1997-002, Forwards LER 97-002-00,per 10CFR50.73(a)(2)(v)(B),which Requires 30 Day Written Rept.Commitments Associated W/Correspondence,Encl | Zion | 11 November 1997 | Forwards LER 97-002-00,per 10CFR50.73(a)(2)(v)(B),which Requires 30 Day Written Rept.Commitments Associated W/Correspondence,Encl |
| 05000461/LER-1996-014-01, Forwards LER 96-014-01,containing Cause for Event & Corrective Actions to Prevent Recurrence Re Inadequately Tested Auxiliary Bldg Roof Plug.Commitments,Listed | Clinton | 1 October 1997 | Forwards LER 96-014-01,containing Cause for Event & Corrective Actions to Prevent Recurrence Re Inadequately Tested Auxiliary Bldg Roof Plug.Commitments,Listed |
| 05000304/LER-1997-001, Forwards LER 97-001-00 Per 10CFR50.73(a)(2)(iv) Which Requires Written Rept Using NRC Form 366, License Event Rept, within 90 Days of Discovery of Event.Attachment a Contains Commitments Associated W/Ltr | Zion | 1 October 1997 | Forwards LER 97-001-00 Per 10CFR50.73(a)(2)(iv) Which Requires Written Rept Using NRC Form 366, License Event Rept, within 90 Days of Discovery of Event.Attachment a Contains Commitments Associated W/Ltr |
| 05000295/LER-1994-010-01, :on 940702,Unit 1 RT Occurred Due to Generator/ Bus Duct Fire.Caused by Inadequate Design.Developed Guidelines for Improved Installation W/Revised Design | Zion | 18 September 1997 |
- on 940702,Unit 1 RT Occurred Due to Generator/ Bus Duct Fire.Caused by Inadequate Design.Developed Guidelines for Improved Installation W/Revised Design
|
| 05000295/LER-1997-019, Forwards LER 97-019-00 Re Failure to Test Safety Related Logic Circuits Required by Tech Specs.Attachment a Provides Commitments Associated W/Correspondence | Zion | 18 September 1997 | Forwards LER 97-019-00 Re Failure to Test Safety Related Logic Circuits Required by Tech Specs.Attachment a Provides Commitments Associated W/Correspondence |
| 05000304/LER-1996-004-01, Forwards LER 96-004-01 Re Results of Investigation Into Failure of Unit Containment Inner Air Lock Door.Addl Corrective Action Listed in Attachment a | Zion | 5 September 1997 | Forwards LER 96-004-01 Re Results of Investigation Into Failure of Unit Containment Inner Air Lock Door.Addl Corrective Action Listed in Attachment a |
| 05000295/LER-1997-015-02, :on 970724,Unit 1 EDGs & Unit 2 RHR Sys Were Declared Inoperable & Inadvertent Esg Actuation Was Noted While Performing TS Related Surveillances.Cause Is Under Investigation.Restored ESF Equipment | Zion | 25 August 1997 |
- on 970724,Unit 1 EDGs & Unit 2 RHR Sys Were Declared Inoperable & Inadvertent Esg Actuation Was Noted While Performing TS Related Surveillances.Cause Is Under Investigation.Restored ESF Equipment
|
| 05000461/LER-1997-021, Forwards LER 97-021-00 & 10CFR21 Rept 21-97-040,re Control Circuit for Division 1 EDG Feed Breaker Which Did Not Meet Basis Due to Design Error | Clinton | 25 August 1997 | Forwards LER 97-021-00 & 10CFR21 Rept 21-97-040,re Control Circuit for Division 1 EDG Feed Breaker Which Did Not Meet Basis Due to Design Error |
| 05000461/LER-1997-013, :on 970508,failure to Adequately Verify That No Trips Existed During Surveillance Test Resulted in Inadvertent Actuation of Sgts.Caused by Personnel Error. Procedure CPS 9532.61 Was Revised | Clinton | 4 June 1997 |
- on 970508,failure to Adequately Verify That No Trips Existed During Surveillance Test Resulted in Inadvertent Actuation of Sgts.Caused by Personnel Error. Procedure CPS 9532.61 Was Revised
|
| 05000295/LER-1997-013-02, :on 970412,VT-3 Insp Requirements of Relief Request CR-13 for Reactor Head Bolting Were Not Performed. Caused by Failure to Revise ISI Database After SER Received from Nrc.Procedure Revised | Zion | 2 June 1997 |
- on 970412,VT-3 Insp Requirements of Relief Request CR-13 for Reactor Head Bolting Were Not Performed. Caused by Failure to Revise ISI Database After SER Received from Nrc.Procedure Revised
|
| 05000295/LER-1997-012, Forwards LER 97-012-00,which Documents 970423 Event That Occurred at Zion Generating Station.Commitments Made by Util,Listed | Zion | 23 May 1997 | Forwards LER 97-012-00,which Documents 970423 Event That Occurred at Zion Generating Station.Commitments Made by Util,Listed |
| 05000295/LER-1997-010, :on 960316,reactor Trip Due to Equipment Failure Occurred.Caused by New But Defective Pneumatic Vol Booster on Valve.Pneumatic Vol Booster for 1C Main FW Regulating Valve Replaced | Zion | 19 May 1997 |
- on 960316,reactor Trip Due to Equipment Failure Occurred.Caused by New But Defective Pneumatic Vol Booster on Valve.Pneumatic Vol Booster for 1C Main FW Regulating Valve Replaced
|
| 05000295/LER-1997-009, Forwards LER 97-009-00 IAW 10CFR50.73(A)(2)(i)(B) Which Requires Listed Corrective Actions | Zion | 14 May 1997 | Forwards LER 97-009-00 IAW 10CFR50.73(A)(2)(i)(B) Which Requires Listed Corrective Actions |
| 05000461/LER-1997-011, :on 860929,failed to Verify Breaker Closed at seven-day Frequency Required by TS Due to Omission of Breaker from Surveillance Procedure.Caused by Inadequate Procedures.Revised Procedures | Clinton | 8 May 1997 |
- on 860929,failed to Verify Breaker Closed at seven-day Frequency Required by TS Due to Omission of Breaker from Surveillance Procedure.Caused by Inadequate Procedures.Revised Procedures
|
| 05000295/LER-1997-007, Forwards LER 97-007-00 Re Automatic Actuation of Esf. Submitted Table Identifies Actions Committed to by Util | Zion | 10 April 1997 | Forwards LER 97-007-00 Re Automatic Actuation of Esf. Submitted Table Identifies Actions Committed to by Util |
| 05000461/LER-1996-016-01, Forwards LER 96-016-01:re Residual Water Covering Portion of Disc/Seat Area During Testing Due to Design Not Allowing Complete Draining Results in Invalid Local Leak Rate Testing of Feedwater Containment Isolation | Clinton | 27 March 1997 | Forwards LER 96-016-01:re Residual Water Covering Portion of Disc/Seat Area During Testing Due to Design Not Allowing Complete Draining Results in Invalid Local Leak Rate Testing of Feedwater Containment Isolation |
| 05000295/LER-1997-005, Forwards LER 97-005-00 IAW 10CFR50.73(a)(2)(i)(B).Actions Listed | Zion | 24 March 1997 | Forwards LER 97-005-00 IAW 10CFR50.73(a)(2)(i)(B).Actions Listed |