ML20212P636: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20212P636
| number = ML20212P636
| issue date = 03/10/1987
| issue date = 03/10/1987
| title = Ack Receipt of 870306 Ltr Supplementing Corrective Actions Described in 870304 Meeting at Region III Ofc.Corrective Actions Re out-of-svc Equipment Status,Computer Point Verification & Control Room Staffing Found Acceptable
| title = Ack Receipt of Supplementing Corrective Actions Described in 870304 Meeting at Region III Ofc.Corrective Actions Re out-of-svc Equipment Status,Computer Point Verification & Control Room Staffing Found Acceptable
| author name = Davis A
| author name = Davis A
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8703160178
| document report number = NUDOCS 8703160178
| title reference date = 03-06-1987
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
Line 24: Line 25:
==Dear Mr. Reed:==
==Dear Mr. Reed:==


We have received your letter dated March 6, 1987, supplementing the corrective actions which you described in the March 4, 1987, meeting in Region III. We have reviewed the actions described in this letter including the out-of-service equipment status, the computer point verification, the shutdown cooling procedure revisions, control room staffing and activity control, snubber testing and repair / replacement, the imbedment plates investigation, the evaluation per 10 CFR 50.59 of structural steel concerns, and instrumentation of the Low Pressure Coolant Injection (LCPI) containment spray line snubber.
We have received your {{letter dated|date=March 6, 1987|text=letter dated March 6, 1987}}, supplementing the corrective actions which you described in the March 4, 1987, meeting in Region III. We have reviewed the actions described in this letter including the out-of-service equipment status, the computer point verification, the shutdown cooling procedure revisions, control room staffing and activity control, snubber testing and repair / replacement, the imbedment plates investigation, the evaluation per 10 CFR 50.59 of structural steel concerns, and instrumentation of the Low Pressure Coolant Injection (LCPI) containment spray line snubber.
We believe the actions you have outlined to be acceptable to allow the restart of Dresden Units 2 and 3, however, the recent events related to Dresden have highlighted NRC concerns regarding operations at Dresden.
We believe the actions you have outlined to be acceptable to allow the restart of Dresden Units 2 and 3, however, the recent events related to Dresden have highlighted NRC concerns regarding operations at Dresden.
Consequently, we believe the increased attention you are providing to this station is appropriate and we plan to monitor the implementation of these actions.
Consequently, we believe the increased attention you are providing to this station is appropriate and we plan to monitor the implementation of these actions.

Latest revision as of 03:38, 5 May 2021

Ack Receipt of Supplementing Corrective Actions Described in 870304 Meeting at Region III Ofc.Corrective Actions Re out-of-svc Equipment Status,Computer Point Verification & Control Room Staffing Found Acceptable
ML20212P636
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 03/10/1987
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8703160178
Download: ML20212P636 (2)


Text

>

4 5 MAR LO 1987 Docket No. 50-237 Docket No. 50-249 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690

SUBJECT:

RESTART OF DRE5 DEN UNITS 2 AND 3 DOCKET NOS. 50-237 and 50-249

Dear Mr. Reed:

We have received your letter dated March 6, 1987, supplementing the corrective actions which you described in the March 4, 1987, meeting in Region III. We have reviewed the actions described in this letter including the out-of-service equipment status, the computer point verification, the shutdown cooling procedure revisions, control room staffing and activity control, snubber testing and repair / replacement, the imbedment plates investigation, the evaluation per 10 CFR 50.59 of structural steel concerns, and instrumentation of the Low Pressure Coolant Injection (LCPI) containment spray line snubber.

We believe the actions you have outlined to be acceptable to allow the restart of Dresden Units 2 and 3, however, the recent events related to Dresden have highlighted NRC concerns regarding operations at Dresden.

Consequently, we believe the increased attention you are providing to this station is appropriate and we plan to monitor the implementation of these actions.

Sincerely, Original Signed by A. Bert Davis A. Bert Davis Acting Regional Administrator l

l cc: C. E. Norelius N. J. Chrissotimos L. McGregor, SRI, Dresden See Attached Sheet J

RIII b

RIII R I, LI RIIJ W R RI I

-g/O\

M A47 m) { bQ 3p Ring /jp - Warnick Hehl Harrison Green an Davis f sli s/o i

8703160178 870310 PDR P ADOCK 05000237 PDR .

(

Commonwealth Edison Company 2 Distribution cc: D. L. Farrar, Director of Nuclear Licensing J. Eenigenburg, Plant Manager DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Phyllis Dunton, Attorney General's Office, Environmental Control Division 1

i I

- . .- . __ . . - _ . . - _ - . - _ - - . . _ - - . - _ - - -