ML20151E813
| ML20151E813 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 07/12/1988 |
| From: | Mallett B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20151E816 | List: |
| References | |
| NUDOCS 8807260219 | |
| Download: ML20151E813 (2) | |
See also: IR 05000010/1988004
Text
Y C.D
.
,
.
.
V
p3
-,,,,,m
. o -, q
,-..-m-,
UM
~ ;1,41% E i n dylu'vit 1 i a vii
-
a
JUL 121988
Docket"No. 50-10
Docket No. 50-237
Docket-No. 50-249
3
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Senior Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the reactive safeguards inspection conducted by
Mr. D. E. Funk, Jr. of this office on June 28 and 30, _1988, of activities
at Oresden Nuclear Power Station, Units 1, 2, and 3, authorized'by NRC
Operating Licenses No. OPR-02, No. DPR-19, and No. DPR-25 and to the
discussion of our findings vich Mr. J. Mayer and members of his staff
at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirsments, as described in the enclosed Notice.
The inspection
showed that action had been taken to correct the identified violation and
to prevent recurrence. Our understanding of your corrective actions is
described in Paragraph 5 of the enclosed inspection report.
Consequently,
no rep'iy to the violation is required.
Inspection results also ident1fied
one otner violation of the security plan which is addressed in Section 4
of the report details. This violation meets the criteria of 10 CFR Part 2,
,
'
Appendiv C,Section V.G. as licensee identified and therefore, a separate
Notise of Violation will not be issued.
Areas examined during this inspection concern a subject matter which is exempt
from disclosure according to Part 73, Title 10, Code of Federal Regulations,
Section 73.21(c)(2).
This 1iformation must be handled and protected in
-
accordance with the provisiens of 10 CFR 73.21.
Consequently,<the enclosure
to this letter and our reno.t of this inspection will not be placed in the NRC
Public Document Room.
,
p00
8807260219 80071 ?
ADOCK 0500
'10
-
G
f U
- -
Encle ero contain:
SAFEGl'ARDS IfDORMTION
Upon Separation This
g
,3
3 w
,
_. m
,
, ,
. - -
.
Pago is Decontrolled
~
vn
V J M "i .j O
h ~Vi \\ Y N
- -----
.
.
-
'
Q A r r-m e 9 n n n t o * "- M f XM
-
,
vn Luvnisv0 liti Vatn; t i ivli
0
s.
Commonwealth Edison Company
2
JUL 1211988
'
'
We will gladly discuss any questions you.have concerning.this' inspection.
Sincerely,
Bruce
S.- Mallett, Ph.D.,' Chief
Nuclear Material Safety and
Safeguards Branch
Enclosures:
1.
2.
Inspection Reports
No. 50-10/88004(DRSS);
No. 50-237/88016(DRSS);
No. 50-249/88017(ORSS)
(UNCLASSIFIED SAFEGUARDS INFORMATION)
.
cc w/ enclosures:
H. Bliss,. Nuclear
Licensing Manager
J. Eenigenburg, Plant Manager
NRR/DRIS/SGB
j
NRR/DRIS/S1B
NRR/DLPQ/?EB
cc w/ enclosures, w/o
i
UNCLASSIFIED SAFEGUARDS
INFORMATION:
)
DCD/DCB (RIOS)
i
Licensing Fee Management Branch
Resident Inspector, RIII
Richard Hoobard
J. W. McCaffrey, Chief, Public
Utilities Division
l
F
l
-
p
Enclosure contains
Funkt ms
Creed
Ring
Malijtt
SAFEGUARDS INFORMATI0
io"rAlded,n.o
Upon separation this,
. OA"Im1 Anno
w ' c/.n , t o W
pago is Decontrolled
on
L. v v i u w v
n.
.,.a