9UN 8.1 IW I
Dock'et'No.~50-10 Docket No. 50-237 Docket'No. 50-249 Commonwealth Edison Company.
Dresden Nuclear Power Station.
ATTN: Mr. Steve'R. Stiles Training Department R.-R. 1-Morris, IL 60450
SUBJECT:
REQUALIFICATION FXAMINATIONS
Dear Mr. Stiles:
Region III has completed a pilot requalification exam at the Perry facility utilizing the new requalification examination methodology.
r In order to provide you with the latest, although not necessarily final, procedure and guidance on the requalification process the following infonnation is being provided for your information.
1.
Draft of ES601 Rev 5 "Administration of NRC Requalification Program Evaluations".
2.
Written Exam from Perry 3.
Selected Simulator Scenarios from Perry j
4.
Selected Job Performance Measures (JPM) from Perry.
If you have any questions on the present status of the process please contact me at (312) 790-5695.
Sincerely,
.QRLG!tlA1, SIGNEQ R GE0iEREYJ WRIGlit Geoffrey C. Wright, Chief Operations Branch l
Enclosures:
'As stated cc w/ enclosures:
Dresden, SRI cc w/o enclosures:
M. Ring, DRP c
//[
8807120237 880623 PDR ADOCK 05000010
'/
V PDC i
.. - -