Forwards Insp Rept 50-010/99-09 on 990325-0506.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy
ML20206P243
Person / Time
Site: Dresden Constellation icon.png
Issue date: 05/13/1999
From: Jorgensen B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20206P247 List:
References
50-010-99-09, 50-10-99-9, NUDOCS 9905180196
Download: ML20206P243 (3)


See also: IR 05000010/1999009

Text

~

e

, . .

i'

May 13, 1999

Mr. Oliver D. Kingsley -

President, Nuclear Generation Group

4

- Commonwealth Edison Company .

ATTN: Regulatory Services .

Executive Towers West 111

!

1400 Opus Place, Suite 500

1

Downers Grove,IL 60515

)

SUBJECT:

NRC INSPECTION REPORT 50-10/99009(DNMS)

Dear Mr. Kingsley:

'On May 6,1999, the NRC completed an inspection at your Dresden Unit 1 Station which

. examined decommissioning activities. The enclosed report presents the results of that

> inspection.

During the 6 week period covered by this inspection, activities in the areas of facility

management and control, decommissioning support, and radiological safety were examined.-

Several incidents were evaluated during the inspection in which individual radiation worker

. performance was less than satisfactory. However, the overall performance of the reactor

decommissioning program was adequate.

Based on the results of this inspection, the NRC has determined that two' violations of NRC

requirements occurred. These violations are being treated as Non-Cited Violations (NCVs),

consistent with Appendix C of the Enforcement Policy. These NCVs are described in the

,

. subject inspection report. if you contest the violation or severity level of these NCVs, you

1

should provide a response within 30 days of the date of this inspection report, with the basis for

( your denial, to the United States Nuclear Regulatory Commission, ATTN: Document Control

Desk, Washington D.C.~ 20555-0001, with copies to the Regional Administrator, Region lil, and

j

_

, the Director, Office of Enforcement, United States Nuclear Regulatory Commission,

,

Washington D.C. 20555-0001.

,

9905190196 990513

J

PDR

ADOCK 05000010

g

e

PDR

j

,

r

--

-

,.

O. Kingsley

-2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

j

enclosure, and your response will be placed in the NRC Public Document Room.

i

Sincerely,

/s/ B.L. Jorgensen

<

Bruce L. Jorgensen, Chief

.

Decommissioning Branch

{

l

Docket No. 50-10

i

License No. DPR-2

Enclosure:

Inspection Report 50-10/99009(DNMS)

l

cc w/ encl:

R. P. Tuetken, General Manager,

j

Decommissioning Projects and Services

K. A. Ainger, Director of Dresden 1 and

j

Zion Decommissioning and Licensing

j

H. Stanley, PWR Vice President

C. M. Crane, BWR Vice President

D. Helwig, Senior Vice President

R. Krich, Vice President, Regulatory Services

DCD - Licensing

P. Pltning, Decommissioning Plant Manager

J. M. Heffley, Site Vice President

D. Ambler, Regulatory Assurance Manager

M. Aguilar, Assistant Attorney General

State Liaison Officer

Chairman, Illinois Commerce Commission

DOCUMENT NAME: G:\\SEC\\DRE99009.DNM

To receive a copy of this document. Indicate in the box:"C" a Copy without enclosure "E"= Copy with endosure*N"= No copy

OFFICE

Rill

l6

Rlll a

N Rlli m

E

l

NAME

Snell:ib uAq

$!Nels'T

Jorgeh(en

o

DATE

0543/99

05/W9D

05/13/9s

OFFICIAL RECORD COPY

e-

,:

' O. Kingsley .

-3-

Distribution:

Docket File w/enci

PUBLIC IE-01 w/ enc!

Rlli PRR w/enct

S. Weiss, NRR w/enci

M. Masnik, NRR w/enci

SAR, NRR (e-mail)

LPM, NRR w/enci

J. L. Caldwell, Rlli w/enci

C. D. Pederson, Rill w/ encl

Rlli Enf. Coordinator w/ encl

SRI, Dresden w/enci

LEO (e-mail)

DOCDESK (e-mail)

Greens w/o enci

i

i

1s0019

k\\

(

I